ML20011D139
| ML20011D139 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/12/1989 |
| From: | Shemanski P Office of Nuclear Reactor Regulation |
| To: | Kovach T COMMONWEALTH EDISON CO. |
| References | |
| TAC-71396, TAC-71397, NUDOCS 8912210015 | |
| Download: ML20011D139 (3) | |
Text
-
-uF y
v o, s.
December 12, 1989 Docket Nos. 50-373 DISTRIBUTION and 50-374
- E 65E M. m e m NRC & Local PDRs PDill 2~r/f JCraig
'Mr. Thomas J. Kovach LLuther PShemanski
' Nuclear Licensing Manager OGC-EJordan Comraonwealth Edison Company ACRS(10)
HMiller, R111 1400 Opus Place, Suite GBagchi, NRR/ESGB Downers Grove, Illinois 60515 HAshar,NRR/ESGB
SUBJECT:
EVALUATION OF CONTAINMENT TENDON WIRE STRENGTH AND TENDON INSERVICE INSPECTIONS, LASALLE UNITS I and 2 (TAC N05. 71396 AND 71397)
References:
a.
Special report attached to the Commonwealth Edison Letter to Mr. Bert A. Davis (NRC) dated Septemoer 28, 1988.
b.
Request for additional information from Paul Shemanski (NRC) to Henry E. Bliss (Ceco) dated December 12, 1988.
c.
Request for additional information from Paul Shemanski (NRC) to Thomas J. Kovach (Ceco) dated May 3,1989, d.
Response to Reference C from Wayne Morgan (CECO) to Dr. Thomas Murley dated June 23, 1989.
Dear Mr. Kovach:
The staff has completed its review of the analysis of tendon inservice inspections for LaSalle Units 1 and 2.
Based on Commonwealth Edison's' explanation of various conditions (i.e. lower
. wire strength', common tendon behavior, high temperature effect) and the staff's evaluation of prior. inspection results, the staff concludes that the contain-ment prestressing tendons at LaSalle Units 1 and 2 are in good condition, and that the containments are capable of withstanding the designated loadings. We, therefore, find your response to this issue to be acceptable and consider it closed.
Sincerely,/s Q C. Je d Paul C. Shemanski, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Cc:
gb See next page e
PDill-2:L PD1;l-2:PM D1
-2:PD
'lluther PShemanski:ta aig 12/ 578 12/f/89 2/pf89
.[K0VACH3]
I
[0\\
8912210015 891212 i
PDR.ADOCK 05000373 Q
PDC k
b h'p u %
al d* '
UNITED 1.TATES -
? '
q.;.
..g -
NUCLEAR RESULAYORY COMMISSION i
{
tAsHWGTON, D, C. 20665
)
th, Y
k,,....
. December 12, 1989 l
1 Docket Nos. 50-373 and 50-374 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company
-1400 Opus Place, Suite 300 Downers Grove, Illinois 60515
SUBJECT:
EVALUATION OF CONTAINMENT TENDON WIRE STRENGTH AND TENDON INSERVICE INSPECTIONS, LASALLE UNITS I and 2 (TAC NOS. 71396 AND 71397)
References:
a.
Special report attached to the Commonwealth Edison Letter to Mr. Bert A. Davis (NRC) cated September 28, 1988.
L b.
Request for additional information from Paul Shemanski l
(NRC) to Henry E. Bliss (Ceco) dated December 12, 1988.
~
c.
Request for additional information from Paul Shemanski (NRC) to Thomas J. Kovach (CECO) dated Hay 3,1989, d.
Response to Reference C from Wayne Morgan.(Ceco) to Dr. Thomas Murley dated June 23, 1989.
Dear Mr. Kovach:
The staff has completed-its review of the analysis of tendon inservice inspections for LaSalle Units 1 and 2.
Based.on Commonwealth Edison's explanation of various conditions (i.e. lower wire strength, common tendon behavior, high temperature effect) and the staff'.s evaluation of prior inspection resuits, the staff concludes that the contain-ment prestressing tendons at LaSalle Units 1 and 2 are in good condition, and that the containments are capable of withstanding the designated loadings. We, l
therefore,. find your response to this issue to be acceptable and consider it closed.
Sincerely, b[
Paul C. Shemanski, Project Manager Project Directorate 111-2 Division of Reactor Projects - 111, IV, V and Special Projects cc:
See next page
j Mr. Thomas J. Kovech LaSalle County Nuclear Power Station Conunonwealth Edison Company Units 1 & 2 cc:
Phillip P. Steptoe, Esquire John W. McCaffrey Sidley and Austin Chief, Public Utilities Division One First National Plaza SOIC
~
Chicager Illinois 60603 100 West Randolph Street s"
Chicago, Illinois 60601 Assistant Attorney General 100 West Randolph Street Suite 12 Chicago, Illinois 60601 1
Resident Inspector /LaSalle, NPS U.SJ Nuclear Regulatory Commission
~
Rural Route No. 1 P. O. Box 214 Marseilles, Illinois 61341 Chairman
.LaSalle County Board of Supervisors LaSalle County Courthouse Ottawa, Illinois 61350 Attorney General 500 South 2nd Street Springfield, Illinois 62701 L
Chairman Illinois Cosumrce Commission Leland Building 527 East Capitol Avenue Springfield, Illinois 62706 Mr. Michael C. Parker, Chief Division of Engineering i
Illinois Department of Nuclear Safety l
1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Cosmission 799 Roosevelt Road, Bldg. f4 Glen Ellyn, Illinois 60137 l
1 l
.