{{Adams | |||
| number = ML20154S711 | |||
| issue date = 09/26/1988 | |||
| title = Ack Receipt of 880829 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/88-19 | |||
| author name = Callan L | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | |||
| addressee name = Withers B | |||
| addressee affiliation = WOLF CREEK NUCLEAR OPERATING CORP. | |||
| docket = 05000482 | |||
| license number = | |||
| contact person = | |||
| document report number = NUDOCS 8810050141 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | |||
| page count = 2 | |||
}} | |||
See also: [[see also::IR 05000482/1988019]] | |||
=Text= | |||
{{#Wiki_filter:. .. | |||
, | |||
. . | |||
SEP 2 61988 | |||
In Reply Refer To: | |||
Dodket: STN 50-482/88-19 | |||
Wolf Creek Nuclea.' Operating Corporation | |||
ATTN: Bart D. Withers | |||
President and Chief Executive Officer | |||
P.O. Box 411 | |||
Burlington, Kansas 66839 | |||
Gentlemen: | |||
Thank you for your letter of August 29, 1988, in response to our letter and | |||
Notice of Violation dated July 29, 1988. We have reviewed your reply and find | |||
it responsive to the concerns raised in our Notice of Violation. We will review | |||
the implementation of your corrective actions during a future inspection to | |||
determine that full compliance has been achieved and will be maintaiaed. | |||
Sincerely. | |||
Original Signed Sy: | |||
L J; CALLAN | |||
88100b0141 000926 | |||
PDR | |||
0 | |||
ADocKosoog4t[ 1.. J. Callan, Director | |||
Division of Reactor Projects | |||
cc: | |||
Wolf Cree ( Nuclear Operating Corporation | |||
ATTh: Otto Maycard, Manager | |||
of Licensing | |||
P,0. Box 411 | |||
Burlington, Kansas 65839 | |||
Wolf Creek Nuclear Operating Corporation | |||
ATTN: Gary Boyer, Plant Manager | |||
P.O. Box 411 | |||
Burlington, Kansas 66839 | |||
Kansas Corporation Comission | |||
ATTN: Robert D. Elliott, Chief Engineer | |||
Fourth Floor. Docking State Office Building | |||
Topeka, Kansas 66612-1571 | |||
Kansas Radiation Control Program Director | |||
bec to DMB (IE01) _ | |||
RIV:PSA .-ji C YS D:b | |||
ATHowellydf DDCharrberlain LJCallan \ | |||
9/h/88 9/2 6/88 9/'lh88 | |||
6{b | |||
. . . | |||
. . | |||
Wolf Creek Nuclear Operating -2- | |||
Corporation | |||
bec distrib. by RIV: | |||
RRI R. D. Martin, RA | |||
SectionChief(DRP/A) DRP | |||
RPB-DRSS B. DeFayette, RIII | |||
RIV File SRI, Callaway, RIII | |||
MIS System RSTS Operator | |||
Project Engineer, DRP/A Lisa Slea, RM/ALF | |||
P. O'Connor, NRR Project Manager | |||
DRS | |||
' | |||
l | |||
, | |||
., | |||
.. | |||
i | |||
a | |||
. ,. | |||
* | |||
... ' | |||
, | |||
. | |||
- | |||
'!~~4._.. | |||
s /, J | |||
W4) NUCLEAR OPERATING i - | |||
L | |||
' | |||
'j | |||
s ut o. w e ers | |||
m ene - | |||
*** August 29, 1988 | |||
VM 83-0212 | |||
U. S. Nuclear Regulatory Com:nission | |||
ATTH: Doc urnen t Control Desk | |||
Mail Station Pl-137 | |||
Washington, D. C. 20555 | |||
Reference: Letter dated July 29, 1988 from L. J. Callan, NRC, to | |||
B. D. Withers, WCHOC | |||
Subject Docket No. 50-482 : Response to Violation 482/8819-01 | |||
Gent ietsen : | |||
Attached is Wolf Creek Nuclear Operating Corporation's response to violation , | |||
482/8819-01 which was docu:sented in the Reference. Violation 482/8819-01 | |||
involved a f ailure to complete the required fire impairment control permit | |||
for two fire doors. | |||
If you have any questionr. cuncerning this artter, please contact ro e or | |||
Mr. O. L. M.syna:d o f my sta f f. | |||
Very truly yours, | |||
' | |||
' | |||
Bart D. Withers | |||
Prealdent and | |||
Chiaf Executive Officer | |||
B DW/,l ad | |||
Attachraent | |||
ces B. L. Bartsett (HRC), w/a | |||
D. D. Chamberl. tin' (NRC), w/a | |||
R. D. Martin (NRC), w/a | |||
P. W. O'Connor ( NRC), w/a (2) | |||
, | |||
4949 %620g zPP r 0 ,m. . , , ,,,on. x. t, n ,rsce. <>,t> 3 4 3, | |||
, m-..-, t,-, ou | |||
'h , -) | |||
. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __ - _ _ - _ - _ _ _ _ _ _ _ - _ _ _. | |||
; | |||
e . . o | |||
' | |||
s * e | |||
' | |||
Attachment to WM 88-0212 | |||
* | |||
Page 1 of 1 | |||
'. . | |||
' | |||
. | |||
Violation (482 /8819-01): Failure to Follow Procedure | |||
F_ipling: . | |||
i | |||
Technical Specification 6.8.1 requires that written procedures be , [ | |||
< | |||
established, implemented, and maintained for the fire protection program. 4 | |||
Procedure ADM 13-103, Revision 5, "Fire protection: Impairment Control," ! | |||
implements procedures for impaired fire protection equipment including { | |||
requires that fire protetton | |||
~ | |||
4 degraded fire doors. ADM 13-103, Section 4, ' | |||
impairment control permit forms be prepared for all fire protection system | |||
impairments. In addition, Section 4 requires that entries be made in the t | |||
fire protection impairment control log for the impairments. ! | |||
l | |||
( | |||
i contrary to the above, on June 6, 1988 Fire Doors 13261 and 13281 were j | |||
i observed to be standing open. Neither fire protection im pairment control i | |||
permits nnr log entries had been completed for those doors. I | |||
a | |||
I Reason for Violation: | |||
I i | |||
: Fire doors 13261 and 13281 were lef t open by operations personnel without ; | |||
the required fire protection impairment control permits or los entries due i | |||
' | |||
to incorrectly interpreting the requirements of ADM 13-103. The involved ; | |||
! operations pwesonnel believed it was acceptable to leave the duors open : | |||
without a fire impairment pe rmit when in the area performine, Technical | |||
Specification sutveillance tests since the operator was fire watch ; | |||
, | |||
qualified. | |||
< | |||
l Cos vective _Sys Wich inve Been taken and Results Achf.eved | |||
' | |||
! Thst "vire Protaction Impairment Control" procedure, ADM 13-103, has been , | |||
i reviced to clearly identify the requirement fer obtalaing fire impairment i | |||
perait any r N a fire door is to be left open. The Operations Supervisor l | |||
l | |||
! | |||
instructed all Operations personnel by memo of the reqvirement to isst.e a ! | |||
' | |||
l tire im pa iree n': wnenever any fire door is le f t open for any reason, except | |||
l normal passage. , | |||
i | |||
prrectiv_e__Sf eos Which Will Be Taken To Avoid Further Violations | |||
* | |||
. | |||
! In addition to the corrective steps discussed above, the procedure change to ! | |||
ADM 13'-103 was placed in operations required reading as required reading l | |||
l entry number 88-160 to reinforce the memo sent to all Operations personnel. ! | |||
; | |||
l | |||
I | |||
Date When Full Compilance Will Be_ Achieved: | |||
Full ecwspliance has been achieved. | |||
: | |||
. | |||
! | |||
I ; | |||
* | |||
' | |||
I | |||
i : | |||
i i | |||
; | |||
L | |||
i | |||
l | |||
; ; | |||
}} |
Revision as of 14:11, 2 January 2021
ML20154S711 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 09/26/1988 |
From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
References | |
NUDOCS 8810050141 | |
Download: ML20154S711 (2) | |
See also: IR 05000482/1988019
Text
. ..
,
. .
SEP 2 61988
In Reply Refer To:
Dodket: STN 50-482/88-19
Wolf Creek Nuclea.' Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
Thank you for your letter of August 29, 1988, in response to our letter and
Notice of Violation dated July 29, 1988. We have reviewed your reply and find
it responsive to the concerns raised in our Notice of Violation. We will review
the implementation of your corrective actions during a future inspection to
determine that full compliance has been achieved and will be maintaiaed.
Sincerely.
Original Signed Sy:
L J; CALLAN
88100b0141 000926
0
ADocKosoog4t[ 1.. J. Callan, Director
Division of Reactor Projects
cc:
Wolf Cree ( Nuclear Operating Corporation
ATTh: Otto Maycard, Manager
of Licensing
P,0. Box 411
Burlington, Kansas 65839
Wolf Creek Nuclear Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Comission
ATTN: Robert D. Elliott, Chief Engineer
Fourth Floor. Docking State Office Building
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE01) _
RIV:PSA .-ji C YS D:b
ATHowellydf DDCharrberlain LJCallan \
9/h/88 9/2 6/88 9/'lh88
6{b
. . .
. .
Wolf Creek Nuclear Operating -2-
Corporation
bec distrib. by RIV:
RRI R. D. Martin, RA
SectionChief(DRP/A) DRP
RPB-DRSS B. DeFayette, RIII
RIV File SRI, Callaway, RIII
MIS System RSTS Operator
Project Engineer, DRP/A Lisa Slea, RM/ALF
P. O'Connor, NRR Project Manager
'
l
,
.,
..
i
a
. ,.
... '
,
.
-
'!~~4._..
s /, J
W4) NUCLEAR OPERATING i -
L
'
'j
s ut o. w e ers
m ene -
- August 29, 1988
VM 83-0212
U. S. Nuclear Regulatory Com:nission
ATTH: Doc urnen t Control Desk
Mail Station Pl-137
Washington, D. C. 20555
Reference: Letter dated July 29, 1988 from L. J. Callan, NRC, to
B. D. Withers, WCHOC
Subject Docket No. 50-482 : Response to Violation 482/8819-01
Gent ietsen :
Attached is Wolf Creek Nuclear Operating Corporation's response to violation ,
482/8819-01 which was docu:sented in the Reference. Violation 482/8819-01
involved a f ailure to complete the required fire impairment control permit
for two fire doors.
If you have any questionr. cuncerning this artter, please contact ro e or
Mr. O. L. M.syna:d o f my sta f f.
Very truly yours,
'
'
Bart D. Withers
Prealdent and
Chiaf Executive Officer
B DW/,l ad
Attachraent
ces B. L. Bartsett (HRC), w/a
D. D. Chamberl. tin' (NRC), w/a
R. D. Martin (NRC), w/a
P. W. O'Connor ( NRC), w/a (2)
,
4949 %620g zPP r 0 ,m. . , , ,,,on. x. t, n ,rsce. <>,t> 3 4 3,
, m-..-, t,-, ou
'h , -)
. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __ - _ _ - _ - _ _ _ _ _ _ _ - _ _ _.
e . . o
'
s * e
'
Attachment to WM 88-0212
Page 1 of 1
'. .
'
.
Violation (482 /8819-01): Failure to Follow Procedure
F_ipling: .
i
Technical Specification 6.8.1 requires that written procedures be , [
<
established, implemented, and maintained for the fire protection program. 4
Procedure ADM 13-103, Revision 5, "Fire protection: Impairment Control," !
implements procedures for impaired fire protection equipment including {
requires that fire protetton
~
4 degraded fire doors. ADM 13-103, Section 4, '
impairment control permit forms be prepared for all fire protection system
impairments. In addition, Section 4 requires that entries be made in the t
fire protection impairment control log for the impairments. !
l
(
i contrary to the above, on June 6, 1988 Fire Doors 13261 and 13281 were j
i observed to be standing open. Neither fire protection im pairment control i
permits nnr log entries had been completed for those doors. I
a
I Reason for Violation:
I i
- Fire doors 13261 and 13281 were lef t open by operations personnel without ;
the required fire protection impairment control permits or los entries due i
'
to incorrectly interpreting the requirements of ADM 13-103. The involved ;
! operations pwesonnel believed it was acceptable to leave the duors open :
without a fire impairment pe rmit when in the area performine, Technical
Specification sutveillance tests since the operator was fire watch ;
,
qualified.
<
l Cos vective _Sys Wich inve Been taken and Results Achf.eved
'
! Thst "vire Protaction Impairment Control" procedure, ADM 13-103, has been ,
i reviced to clearly identify the requirement fer obtalaing fire impairment i
perait any r N a fire door is to be left open. The Operations Supervisor l
l
!
instructed all Operations personnel by memo of the reqvirement to isst.e a !
'
l tire im pa iree n': wnenever any fire door is le f t open for any reason, except
l normal passage. ,
i
prrectiv_e__Sf eos Which Will Be Taken To Avoid Further Violations
.
! In addition to the corrective steps discussed above, the procedure change to !
ADM 13'-103 was placed in operations required reading as required reading l
l entry number 88-160 to reinforce the memo sent to all Operations personnel. !
l
I
Date When Full Compilance Will Be_ Achieved:
Full ecwspliance has been achieved.
.
!