SEP 2 61988
In Reply Refer To:
Dodket:
STN 50-482/88-19
Wolf Creek Nuclea.' Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
Thank you for your letter of August 29, 1988, in response to our letter and
Notice of Violation dated July 29, 1988. We have reviewed your reply and find
it responsive to the concerns raised in our Notice of Violation. We will review
the implementation of your corrective actions during a future inspection to
determine that full compliance has been achieved and will be maintaiaed.
Sincerely.
Original Signed Sy:
L J; CALLAN
88100b0141 000926
ADocKosoog4t[
1..
J. Callan, Director
0
Division of Reactor Projects
cc:
Wolf Cree ( Nuclear Operating Corporation
ATTh: Otto Maycard, Manager
of Licensing
P,0. Box 411
Burlington, Kansas 65839
Wolf Creek Nuclear Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Comission
ATTN:
Robert D. Elliott, Chief Engineer
Fourth Floor. Docking State Office Building
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE01)
_
RIV:PSA .-ji
C YS
D:b
\\
ATHowellydf
DDCharrberlain
LJCallan
6{b
9/h/88
9/2 6/88
9/'lh88
.
. .
.
.
Wolf Creek Nuclear Operating
-2-
Corporation
bec distrib. by RIV:
RRI
R. D. Martin, RA
SectionChief(DRP/A)
RPB-DRSS
B. DeFayette, RIII
RIV File
SRI, Callaway, RIII
MIS System
RSTS Operator
Project Engineer, DRP/A
Lisa Slea, RM/ALF
P. O'Connor, NRR Project Manager
'
l
,
.,
..
i
a
.
,.
W4) NUCLEAR OPERATING
'!~~4._.. /, J
...
'
,
s
-
.
L
'j
i
-
'
s ut o. w e ers
m ene
-
August 29, 1988
VM 83-0212
U. S. Nuclear Regulatory Com:nission
ATTH:
Doc urnen t Control Desk
Mail Station Pl-137
Washington, D. C. 20555
Reference: Letter dated July 29, 1988 from L. J. Callan, NRC, to
B. D. Withers, WCHOC
Subject
Docket No. 50-482 : Response to Violation 482/8819-01
Gent ietsen :
Attached is Wolf Creek Nuclear Operating Corporation's response to violation
,
482/8819-01 which was docu:sented in the Reference.
Violation 482/8819-01
f ailure to complete the required fire impairment control permit
involved a
for two fire doors.
If you have any questionr. cuncerning this artter,
please contact ro e or
Mr. O. L. M.syna:d o f my sta f f.
Very truly yours,
'
Bart D. Withers
Prealdent and
'
Chiaf Executive Officer
B DW/,l ad
Attachraent
ces
B. L. Bartsett (HRC), w/a
D. D. Chamberl. tin' (NRC), w/a
R. D. Martin (NRC), w/a
P. W. O'Connor ( NRC), w/a (2)
,
4949 %620g zPP
r 0 ,m. . , ,
,,,on. x. t, n ,rsce.
<>,t> 3 4
3,
m-..-, t,-, ou
'h
,
-)
,
. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __ - _ _ - _ - _ _ _ _ _ _ _ - _ _
_.
e . . o
'
s
e
'
Attachment to WM 88-0212
'.
Page 1 of 1
.
'
.
Violation (482 /8819-01):
Failure to Follow Procedure
F_ipling:
.
i
requires
that
written
procedures
be ,
[
established,
implemented,
and maintained for the fire protection program.
4
<
Procedure ADM 13-103,
Revision 5,
"Fire protection:
Impairment Control,"
!
implements procedures
for impaired
fire protection equipment including
{
degraded fire doors.
ADM 13-103,
Section 4,
requires that fire protetton
~
4
'
impairment control permit forms be prepared for all fire protection system
impairments.
In addition, Section 4 requires that entries be made in the
t
fire protection impairment control log for the impairments.
!
l
(
i
contrary to the above,
on June 6,
1988
Fire Doors 13261 and 13281 were
j
i
observed to be standing open.
Neither fire protection im pairment control
i
permits nnr log entries had been completed for those doors.
I
a
I
Reason for Violation:
I
i
Fire doors 13261
and 13281 were lef t open by operations personnel without
the required fire protection impairment control permits or los entries due
i
to incorrectly interpreting the requirements of ADM 13-103.
The involved
'
!
operations pwesonnel believed it was acceptable to leave the duors open
without
a
fire impairment pe rmit when in the area performine, Technical
Specification sutveillance tests since the operator was
fire
watch
qualified.
,
<
l
Cos vective _Sys Wich inve Been taken and Results Achf.eved
'
!
Thst "vire Protaction Impairment Control" procedure,
ADM 13-103, has been
,
i
reviced to clearly identify the requirement fer obtalaing
i
l
perait any r N a fire door is to be left open.
The Operations Supervisor
l
!
instructed all Operations personnel by memo of the reqvirement to isst.e a
!
'
l
tire im pa iree n': wnenever any fire door is le f t open for any reason, except
l
normal passage.
,
i
prrectiv_e__Sf eos Which Will Be Taken To Avoid Further Violations
.
!
In addition to the corrective steps discussed above, the procedure change to
!
ADM 13'-103 was placed
in operations required reading as required reading
l
l
entry number 88-160 to reinforce the memo sent to all Operations personnel.
!
l
I
Date When Full Compilance Will Be_ Achieved:
Full ecwspliance has been achieved.
.
!