#REDIRECT [[IR 05000445/1985011]]
{{Adams
| number = ML20140F027
| issue date = 03/12/1986
| title = Ack Receipt of 851111,1217,860109,15 & 0213 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/85-11 & 50-446/86-06.Corrective Actions Will Be Inspected During Future Insp
| author name = Johnson E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Counsil W
| addressee affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| docket = 05000445, 05000446
| license number =
| contact person =
| document report number = NUDOCS 8603280332
| package number = ML20140F030
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000446/1986006]]
 
=Text=
{{#Wiki_filter:..                          . _ _            _ _ _ _ _ _ . _ _ _ _ _ _ _
      '4  *
          In Reply Refer To:                    MAR 12 W
          Dockets:  50-445/85-11
                    50-446/86-06
          Texas Utilities Generating Company
          ATTN: Mr. W. G. Counsil
                  Executive Vice President
          400 North Olive, L.B. 81
          Dallas, Texas 75201
          Gentlemen:
          Thank you for our letters dated November 11, 1985, December 17, 1985, January 9,
          1986, January 15, 1986, and February 13, 1986, in response to our letters dated
          October 11, 1985, and December 19, 1985. As a result of our review, we have
          no further questions regarding your response to the Notice of Violation and
          Item B of the Notice of Deviation. We will inspect your corrective actions
          during a future inspection. We continue to be in need of additior.al
          information regarding item A of the Notice of Deviation as discussed with your
          Mr. T. G. Tyler at the site on March 7, 1986.
          Please provide the supplemental information within 20 days of the date of this
          letter.
                                                                        Sincerely,
                                                                                    f
                                                                                      "! steed ny
                                                                                        I thnan
                                                                        E. H. Johnson, Director
                                                                        Division of Reactor Safety
                                                                              and Projects
          Texas Utilities Electric Company
          ATTN: J. W. Beck, Vice President Licensing
                  Quality Assurance and Nuclear Fuels
          Skyway Tower
          400 North Olive Street
          Lock Box 81
          Dallas, Texas    75201
i
'
          Renea Hicks
          Assistant Attorney General
          Environmental Protection Division
          P. O. Box 12548
          Austin, Texas 76711
  1      Texas Radiation Control Program Director
          RIV:CPGk                    DRSP k
          TFWesterman:gb              EHJohnson
          $/p /86                    3/g/86                                                      g[
                      8603280332 860312                                                              l
                      PDR
                      O
                            ADOCK 050 g 5                                                              'l
 
.  .
  Texas Utilities Generating    2
      Company
  Sec to DMB (IE01)
  bcc distrib. by RIi:
  *RPS                      * MIS System
  *RRI-0PS                  *RSTS Operator
  *RRI-CONST                *R&SPB
  *T. F. Westerman, CPTG      DRSP
  V. Noonan, NRR              R. Martin, RA
  S. Treby, ELD            *RSB
  *RIV File                    J. Taylor, IE
  *D. Weiss, LFMB (AR-2015)    R. Heishman, IE
  *w/766
 
        .        .
    .
  *
                                                                                                    Log # TXX-4619
  ,                                        TEXAS UTILITIES GENERATING COMPANY                    F i1e # 10130 -
                                        .amv vo-=. .      wo.w ouv= r.=rr. i_.. .. . DMha. MEAS M .        IR 85-11
          wuw a couait
                                                                November 11, 1985                      .
        [RECWTrVE VtCS P8ES' DENT
                          Mr. R. P. Denise
                                                                                            TM@EDWM 3
                          Division of Reactor Safety and Projects
                          U. S. Nuclear Regulatory Commission                                      NOV20125          ,e
                          Region IV                                                              ,
                                                                                                                        j
                          611 Ryan Plaza ~ Drive, Suite 1000                                -
                                                                                                                        g
                          Arlington, Texas 76012
                          SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
                                        DOCKET N05. 50-445 AND 50-446
                                        RESPONSE TO NRC NOTICE OF VIOLATION
                                        INSPECTION REPORT NO.: 50-445/85-11.
                          Dear Mr. Denise:
                          We have reviewed your letter dated October 11, 1985 concerning the
                          inspection conducted by Mr. T. F. Westerman and other members of the Region
                          IV Comanche Peak Group during the period June 22 - August 31,.1985. This
                          inspection covered activities authorized by NRC Construction Permits
                          CPPR-126 and CPPR-127 for Comanche Peak Units 1 and 2.
4
                        We have responded to the Notice of Violation in the attachment to this
                          letter. To aid in the understanding of our response, we have repeated the
                        Notice of Violation followed by the response. We consider the enclosed
                          information to he responsive to the Inspectors' findings.
                        With regard to Appendix B (Notice of Deviation) of your letter, we are
                        currently investigating these findings. The progress made to date has not
                        been sufficient to provide an adequate response and to properly address the
                        additional questions contained in the fourth paragraph of your letter. The
                        response to the Notice of Deviation is scheduled to be submitted by
                        December 11, 1985.
                                                                                      Very truly yours,
                                                                                              .
                                                                                      W. G. Counsil
                        JWA/grr
                                                                                                                          q9
                        Attachment                                                                                      4 \*
                                                                                                                    o
                        c- Region IV (Original + 1 copy)
                                  Director, Inspection and Enforcement (15 copies)                        \
                                  U. S. Nuclear Regulatory Commission                                    9;                  ,
                                                                                                                                l
                                  Washington, D.C. 20555                                            f                        ;
                                  Mr. V. S. Noonan                                                    #a                      '
                                  Mr. D. L. Kelley
      .  l                                  a arvssion or rexas vrzurses ms.scasc couraur
                                                - _ _ . __
 
  - _ _ _ _ - _ _ _ _ - _ _ . _ _ _ _                        _ _ _ .  ___ _ _ _              _
                                        .
.                                      .        .
    .
    .
  '                                                                                        ATTACHMENT
                                                                          FAILURE TO REPORT NONCONFORMING
                                                                                  CONDITIONS IN A PROMPT MANNER
                                                  Failure to Report Nonconforming Conditions in a Prompt Manner:                    )
                                                  Criterion XVI of Appendix B to 10 CFR Part 50 states, in part, " Measures shall
                                                  be established to assure that conditions adversa to quality, such as failures,
                                                  malfunctions, deficiencies. deviations, defective material and equipment, and
                                                  nonconformances are promptly identified and corrected. . .".
                                                  Paragraph 3.1.1 of Procedure CP-QP-16.0, Revision 17, dated July 1,1985, states,
                                                  in part, "When a nonconforming condition is identified, the individual shall
                                                  immediately apply a Hold Tag, when practical. . . .". Paragraph 3.1.2 of this
                                                  procedure states, in part, " Nonconforming conditions shall be reported on the
                                                  NCR form . . . .".
                                                  Contrary to the above, during a NRC witnessed reinspection on August 6-7, 1985,
                                                  of essential lighting system ESB1-42 (Unit 1, safeguards building, elevation 773
                                                  ft.) by an Evaluation Research Corporation (ERC) inspector and a TUGCO QC
                                                  inspector, nonconforming hardware items were identified with respect to design
                                                  document requirements. The identified nonconforming items were outside of
                                                  the defined ERC reinspection activity scope and the TUGCO inspector stated
                                                  that they would be documented on a NCR form. As of August .29,1985, a NCR
                                                  had not been written, a hold tag had not been applied and NRC followup established
                                                  that a documented record of the nonconforming items had not been maintained.
                                                  This is a Severity Level IV violation (Supplement II) (445/8511-V-01).
                                                  Corrective Steps which have been taken and the results achieved:
                                                  The Inspector involved has been instructed to document ' deviations from site
                                                  procedures and design requirements in accordance with CP-QP-16.0
                                                  "Nonconformances", in a prompt, expeditious manner. The Inspector was further
                                                  advised that should future instance of work load prohibit timely reporting, his
                                                  immediate supervisor should be notified for initiation of appropriate action.
                                                  NCR # E-85-100993x has been initiated (8/30/85) to resolve the deficiencies
                                                  identified during ERC reinspections conducted on August 6-7, 1985
                                                  Corrective Steps which have been taken to preclude repetition:
                                                  To preclude further problems of this nature, Inspectors have been assigned to
                                                  support the CPRT Program on a permanent, full-time basis.
                                                  Date when full compliance was achieved:
                                                    Personnel assignments were effective on 9/2/85.
          .
                                          . . .
                                                                                      _. _
}}

Revision as of 08:44, 1 August 2020

Ack Receipt of 851111,1217,860109,15 & 0213 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/85-11 & 50-446/86-06.Corrective Actions Will Be Inspected During Future Insp
ML20140F027
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/12/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20140F030 List:
References
NUDOCS 8603280332
Download: ML20140F027 (2)


See also: IR 05000446/1986006

Text

.. . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _

'4 *

In Reply Refer To: MAR 12 W

Dockets: 50-445/85-11

50-446/86-06

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

Thank you for our letters dated November 11, 1985, December 17, 1985, January 9,

1986, January 15, 1986, and February 13, 1986, in response to our letters dated

October 11, 1985, and December 19, 1985. As a result of our review, we have

no further questions regarding your response to the Notice of Violation and

Item B of the Notice of Deviation. We will inspect your corrective actions

during a future inspection. We continue to be in need of additior.al

information regarding item A of the Notice of Deviation as discussed with your

Mr. T. G. Tyler at the site on March 7, 1986.

Please provide the supplemental information within 20 days of the date of this

letter.

Sincerely,

f

"! steed ny

I thnan

E. H. Johnson, Director

Division of Reactor Safety

and Projects

Texas Utilities Electric Company

ATTN: J. W. Beck, Vice President Licensing

Quality Assurance and Nuclear Fuels

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

i

'

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P. O. Box 12548

Austin, Texas 76711

1 Texas Radiation Control Program Director

RIV:CPGk DRSP k

TFWesterman:gb EHJohnson

$/p /86 3/g/86 g[

8603280332 860312 l

PDR

O

ADOCK 050 g 5 'l

. .

Texas Utilities Generating 2

Company

Sec to DMB (IE01)

bcc distrib. by RIi:

  • RPS * MIS System
  • RRI-0PS *RSTS Operator
  • RRI-CONST *R&SPB
  • T. F. Westerman, CPTG DRSP

V. Noonan, NRR R. Martin, RA

S. Treby, ELD *RSB

  • RIV File J. Taylor, IE
  • D. Weiss, LFMB (AR-2015) R. Heishman, IE
  • w/766

. .

.

Log # TXX-4619

, TEXAS UTILITIES GENERATING COMPANY F i1e # 10130 -

.amv vo-=. . wo.w ouv= r.=rr. i_.. .. . DMha. MEAS M . IR 85-11

wuw a couait

November 11, 1985 .

[RECWTrVE VtCS P8ES' DENT

Mr. R. P. Denise

TM@EDWM 3

Division of Reactor Safety and Projects

U. S. Nuclear Regulatory Commission NOV20125 ,e

Region IV ,

j

611 Ryan Plaza ~ Drive, Suite 1000 -

g

Arlington, Texas 76012

SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446

RESPONSE TO NRC NOTICE OF VIOLATION

INSPECTION REPORT NO.: 50-445/85-11.

Dear Mr. Denise:

We have reviewed your letter dated October 11, 1985 concerning the

inspection conducted by Mr. T. F. Westerman and other members of the Region

IV Comanche Peak Group during the period June 22 - August 31,.1985. This

inspection covered activities authorized by NRC Construction Permits

CPPR-126 and CPPR-127 for Comanche Peak Units 1 and 2.

4

We have responded to the Notice of Violation in the attachment to this

letter. To aid in the understanding of our response, we have repeated the

Notice of Violation followed by the response. We consider the enclosed

information to he responsive to the Inspectors' findings.

With regard to Appendix B (Notice of Deviation) of your letter, we are

currently investigating these findings. The progress made to date has not

been sufficient to provide an adequate response and to properly address the

additional questions contained in the fourth paragraph of your letter. The

response to the Notice of Deviation is scheduled to be submitted by

December 11, 1985.

Very truly yours,

.

W. G. Counsil

JWA/grr

q9

Attachment 4 \*

o

c- Region IV (Original + 1 copy)

Director, Inspection and Enforcement (15 copies) \

U. S. Nuclear Regulatory Commission 9; ,

l

Washington, D.C. 20555 f  ;

Mr. V. S. Noonan #a '

Mr. D. L. Kelley

. l a arvssion or rexas vrzurses ms.scasc couraur

- _ _ . __

- _ _ _ _ - _ _ _ _ - _ _ . _ _ _ _ _ _ _ . ___ _ _ _ _

.

. . .

.

.

' ATTACHMENT

FAILURE TO REPORT NONCONFORMING

CONDITIONS IN A PROMPT MANNER

Failure to Report Nonconforming Conditions in a Prompt Manner: )

Criterion XVI of Appendix B to 10 CFR Part 50 states, in part, " Measures shall

be established to assure that conditions adversa to quality, such as failures,

malfunctions, deficiencies. deviations, defective material and equipment, and

nonconformances are promptly identified and corrected. . .".

Paragraph 3.1.1 of Procedure CP-QP-16.0, Revision 17, dated July 1,1985, states,

in part, "When a nonconforming condition is identified, the individual shall

immediately apply a Hold Tag, when practical. . . .". Paragraph 3.1.2 of this

procedure states, in part, " Nonconforming conditions shall be reported on the

NCR form . . . .".

Contrary to the above, during a NRC witnessed reinspection on August 6-7, 1985,

of essential lighting system ESB1-42 (Unit 1, safeguards building, elevation 773

ft.) by an Evaluation Research Corporation (ERC) inspector and a TUGCO QC

inspector, nonconforming hardware items were identified with respect to design

document requirements. The identified nonconforming items were outside of

the defined ERC reinspection activity scope and the TUGCO inspector stated

that they would be documented on a NCR form. As of August .29,1985, a NCR

had not been written, a hold tag had not been applied and NRC followup established

that a documented record of the nonconforming items had not been maintained.

This is a Severity Level IV violation (Supplement II) (445/8511-V-01).

Corrective Steps which have been taken and the results achieved:

The Inspector involved has been instructed to document ' deviations from site

procedures and design requirements in accordance with CP-QP-16.0

"Nonconformances", in a prompt, expeditious manner. The Inspector was further

advised that should future instance of work load prohibit timely reporting, his

immediate supervisor should be notified for initiation of appropriate action.

NCR # E-85-100993x has been initiated (8/30/85) to resolve the deficiencies

identified during ERC reinspections conducted on August 6-7, 1985

Corrective Steps which have been taken to preclude repetition:

To preclude further problems of this nature, Inspectors have been assigned to

support the CPRT Program on a permanent, full-time basis.

Date when full compliance was achieved:

Personnel assignments were effective on 9/2/85.

.

. . .

_. _