| {{#Wiki_filter:OPERATXNG STATUS Corrected Copy OPERAT1NG DATA REPORT DOCKET NO 50-335 DATE 5/12/87 COMPLETED BY No Wo GRANT TELEPHONE 305/694/4432 1.UNXT NAME: ST~LUCXE UNIT 1.REF ORTING PERIOD: APRIL 1987 3+LICENSED THERMAL POWER (MWT)o'700 4i NAMEF'LATE RATXNG (GROSS MWE)o 850 5 DESIGN ELECTRICAL RATXNG (NET MWE)'30 6i MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)~872 7.MAXXMlJM DEPENDABLE CAPACITY (NET MWE)i 839 8 XF CHANGES OCCUR XN CAPACXTY RATXNGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS: 9i POWER LEVEL TO WHXCH RESTRICTED'F ANY (NET MWE>iOi REASONS FOR RESTRICTIONS~ | | {{#Wiki_filter:Corrected Copy OPERAT1NG DATA REPORT DOCKET NO 50 335 DATE 5/12/87 COMPLETED BY No Wo GRANT TELEPHONE 305/694/4432 OPERATXNG STATUS |
| IF ANY+, MONTHLY-YTD-CUMULATIVE i.ii HOURS XN REPORT PERIOD+12 o NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14 i HOURS GENERATOR ON-LINE 15, UNXT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17, GROSS ELFCTRXCAL ENERGY GERERATED (MWH):18.NET ELECTRICAL ENERGY GENERATED (MWH)19+UNXT SERVICE FACTOR 20'NIT AVAXLABXLXTY FACTOR 21.CAF'ACITY FACTOR (USXNG MDC NET)+2, CAPAC1TY FACTOR.(USXNG DER NET)23, UNIT FORCED OUTAGE RATE 24+SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 7-19 431i8 0+0 354i9 0 832420 276860 255319 49i4 49o4 42o3 42o8 0 2879 1320i4 OiO 1243o4 0 3221412 1072660 1004940 43+2 43o2 4io6 42oi I o I 90791 i 0 ,65893'205i3 65399+1 39o3 166440603 54557805 51490763 72'72'70+8 69i5 25.XF SHlJT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP::8802220122 880216 ,P.DR,*DOCK, 0.500.0250 | | '30 |
| :R..'.....'DCD., | | : 1. UNXT NAME: ST ~ LUCXE UNIT 1 |
| 0 t C QPFRATTNG STAT!JS Corrected Copy QPERATXNG DATA'EPORT DOCVET NO 50-389 DATE 5/12/87 COMPLETED BY Ni Ho GRANT TELEPHONE 305/694/4432 io Ul'!:KT NAME: ST.LUCXE UNXT 2 F;FPQRTXNG PER:KQD;, APRXL 1987 3 I T.'CENSED THERMAL PQ~AER (HHT)'700 NAMEPL'ATE RATING (GROSS HWE): 850 5.DES'KGN EL.ECTRXCAL RATING (NET MME): 830 6o HAXXHIJH DEPENDABLE CAPACITY'GROSS HHE)o 882 7~MA'~~:KHlIH DI:.PEh!DABLE CAP'ACXTY (NET MME)+839 8.TF I';HANGES 0!:CLJP XN CAPACITY RATXNGS (XTEMS NUMBER 3 THROUGH 7)SINf E LAS I REPORT GIVE REASONS'.POWDER LI=VFL TO'WHICH RESTRICTED~ | | . REF ORTING PERIOD: |
| IF ANY (NET MME)10~REASOhjS FOR F<ESTFcICTXQNS | | 3+ LICENSED THERMAL POWER (MWT)o'700 APRIL 4i NAMEF'LATE RATXNG (GROSS MWE)o 1987 850 5 DESIGN ELECTRICAL RATXNG (NET MWE) 6i MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) ~ 872 |
| ~XF ANY'ONTHLY-YTD-CUM!JLATXVE 1 1 o HOURS XN REPORT PERIOD: 12'IJHBER OF HOURS PEACTOR HAS'RITICAL 13, RFACTOR I'ESERVE SHIJTDQHN HOURS 14 o HOl JRS GENERATOR QN-LINE 15 UNIT RESERVE SHUTDO'AN'HOURS 16'ROSS Tl-IEPHAL ENERGY GENERATED (MHH)17.GROSS EL.ECTRICAL ENERGY.GERERATED (MNH)18, hlET ELECTRICAL ENFRGY GENERATED (MMH)19.I Jh/I'1 SERVICE FACTOR 2eo UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPAC:KTY FACTOR (!JSING DER NET),':.3, l,lh!TT FORCED.OLJTAGE RATE 24.SHiJTOOWNS SrHEDULED OVER NEXT 6 MONTHS;, 719 699+3 ,OiO 692e7 0 1815961 607870.575632 96i3 96+3 95o4 96o5 3.7 2879 2828.2 OiO 2808'0 7467711 2513800 2384166 97i6 97+6'98o7 99+8 2.4 32688+0 28203i8 OiO 27636+7 0 71505612 23907950'2601'770 84i5 84i5 84+9 84 i 5 25,i'.!;F SHlJ!I>Q'4N*T END OF RFPORT PERIOD~ESTXHATED DATE OF STARTUP: | | : 7. MAXXMlJM DEPENDABLE CAPACITY (NET MWE) i 839 8 XF CHANGES OCCUR XN CAPACXTY RATXNGS (ITEMS NUMBER 3 THROUGH 7) |
| 0'1W I rP'}} | | SINCE LAST REPORT ~ GIVE REASONS: |
| | 9i POWER LEVEL TO WHXCH RESTRICTED'F ANY (NET MWE> |
| | iOi REASONS FOR RESTRICTIONS~ IF ANY+, |
| | MONTHLY -YTD- CUMULATIVE i.ii HOURS XN REPORT PERIOD+ 7-19 2879 90791 i 0 12 o NUMBER OF HOURS REACTOR WAS CRITICAL 431i8 1320i4 ,65893' |
| | : 13. REACTOR RESERVE SHUTDOWN HOURS 0+0 OiO 205i3 14 i HOURS GENERATOR ON-LINE 354i9 1243o4 65399+1 15, UNXT RESERVE SHUTDOWN HOURS 0 0 39o3 |
| | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 832420 3221412 166440603 17, GROSS ELFCTRXCAL ENERGY GERERATED (MWH) 276860 1072660 54557805 |
| | :18. NET ELECTRICAL ENERGY GENERATED (MWH) 255319 1004940 51490763 19+ UNXT SERVICE FACTOR 49i4 43+2 72' 20'NIT AVAXLABXLXTYFACTOR 49o4 43o2 72' |
| | : 21. CAF'ACITY FACTOR (USXNG MDC NET) 42o3 4io6 70+8 |
| | +2, CAPAC1TY FACTOR. (USXNG DER NET) 42o8 42oi 69i5 23, UNIT FORCED OUTAGE RATE 0 o I I |
| | 24+ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS |
| | : 25. XF SHlJT DOWN AT END OF REPORT PERIOD ~ ESTIMATED DATE OF STARTUP: |
| | :8802220122 880216 |
| | ,P.DR,*DOCK, 0.500.0250 |
| | :R ..'.....'DCD., |
| | |
| | 0 t |
| | C |
| | |
| | Corrected Copy QPERATXNG DATA'EPORT DOCVET NO 50 389 DATE 5/12/87 COMPLETED BY Ni Ho GRANT TELEPHONE 305/694/4432 QPFRATTNG STAT!JS io Ul'!:KT NAME: ST. LUCXE UNXT 2 3 |
| | F;FPQRTXNG PER:KQD;, |
| | I T.'CENSED THERMAL PQ~AER NAMEPL'ATE RATING (GROSS HWE): |
| | (HHT)'700 APRXL 1987 850 |
| | : 5. DES'KGN EL.ECTRXCAL RATING (NET MME): 830 6o HAXXHIJH DEPENDABLE CAPACITY'GROSS HHE) o 882 7~ MA'~~:KHlIH DI:.PEh!DABLE CAP'ACXTY (NET MME) + 839 |
| | : 8. TF I';HANGES 0!:CLJP XN CAPACITY RATXNGS (XTEMS NUMBER 3 THROUGH 7) |
| | SINfE LAS I REPORT GIVE REASONS'. |
| | POWDER LI=VFL TO 'WHICH RESTRICTED~ IF ANY (NET MME) 10 ~ REASOhjS FOR F<ESTFcICTXQNS ~ XF ANY |
| | 'ONTHLY -YTD- CUM!JLATXVE 11 o HOURS XN REPORT PERIOD: 719 2879 32688+0 12'IJHBER OF HOURS PEACTOR HAS'RITICAL 699+3 2828.2 28203i8 13, RFACTOR I'ESERVE SHIJTDQHN HOURS ,OiO OiO OiO 14 o HOl JRS GENERATOR QN-LINE 692e7 2808' 27636+7 15 UNIT RESERVE SHUTDO'AN 'HOURS 0 0 0 16 'ROSS Tl-IEPHAL ENERGY GENERATED (MHH) 1815961 7467711 71505612 |
| | : 17. GROSS EL.ECTRICAL ENERGY. GERERATED (MNH) 607870 2513800 23907950'2601'770 18, hlET ELECTRICAL ENFRGY GENERATED (MMH) .575632 2384166 |
| | : 19. I Jh/I'1 SERVICE FACTOR 96i3 97i6 84i5 2eo UNIT AVAILABILITYFACTOR 96+3 97+6 84i5 |
| | : 21. CAPACITY FACTOR (USING MDC NET) 95o4 '98o7 84+9 |
| | : 22. CAPAC:KTY FACTOR (!JSING DER NET) 96o5 99+8 84 i 5 |
| | ,':.3, l,lh!TT FORCED. OLJTAGE RATE 3.7 |
| | : 24. SHiJTOOWNS SrHEDULED OVER NEXT 6 MONTHS ;, 2.4 25,i '.!;F SHlJ! I>Q'4N *T END OF RFPORT PERIOD ~ ESTXHATED DATE OF STARTUP: |
| | |
| | 0 |
| | '1W I |
| | rP'}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
Corrected Copy OPERAT1NG DATA REPORT DOCKET NO 50 335 DATE 5/12/87 COMPLETED BY No Wo GRANT TELEPHONE 305/694/4432 OPERATXNG STATUS
'30
- 1. UNXT NAME: ST ~ LUCXE UNIT 1
. REF ORTING PERIOD:
3+ LICENSED THERMAL POWER (MWT)o'700 APRIL 4i NAMEF'LATE RATXNG (GROSS MWE)o 1987 850 5 DESIGN ELECTRICAL RATXNG (NET MWE) 6i MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) ~ 872
- 7. MAXXMlJM DEPENDABLE CAPACITY (NET MWE) i 839 8 XF CHANGES OCCUR XN CAPACXTY RATXNGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT ~ GIVE REASONS:
9i POWER LEVEL TO WHXCH RESTRICTED'F ANY (NET MWE>
iOi REASONS FOR RESTRICTIONS~ IF ANY+,
MONTHLY -YTD- CUMULATIVE i.ii HOURS XN REPORT PERIOD+ 7-19 2879 90791 i 0 12 o NUMBER OF HOURS REACTOR WAS CRITICAL 431i8 1320i4 ,65893'
- 13. REACTOR RESERVE SHUTDOWN HOURS 0+0 OiO 205i3 14 i HOURS GENERATOR ON-LINE 354i9 1243o4 65399+1 15, UNXT RESERVE SHUTDOWN HOURS 0 0 39o3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 832420 3221412 166440603 17, GROSS ELFCTRXCAL ENERGY GERERATED (MWH) 276860 1072660 54557805
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 255319 1004940 51490763 19+ UNXT SERVICE FACTOR 49i4 43+2 72' 20'NIT AVAXLABXLXTYFACTOR 49o4 43o2 72'
- 21. CAF'ACITY FACTOR (USXNG MDC NET) 42o3 4io6 70+8
+2, CAPAC1TY FACTOR. (USXNG DER NET) 42o8 42oi 69i5 23, UNIT FORCED OUTAGE RATE 0 o I I
24+ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. XF SHlJT DOWN AT END OF REPORT PERIOD ~ ESTIMATED DATE OF STARTUP:
- 8802220122 880216
,P.DR,*DOCK, 0.500.0250
- R ..'.....'DCD.,
0 t
C
Corrected Copy QPERATXNG DATA'EPORT DOCVET NO 50 389 DATE 5/12/87 COMPLETED BY Ni Ho GRANT TELEPHONE 305/694/4432 QPFRATTNG STAT!JS io Ul'!:KT NAME: ST. LUCXE UNXT 2 3
F;FPQRTXNG PER:KQD;,
I T.'CENSED THERMAL PQ~AER NAMEPL'ATE RATING (GROSS HWE):
(HHT)'700 APRXL 1987 850
- 5. DES'KGN EL.ECTRXCAL RATING (NET MME): 830 6o HAXXHIJH DEPENDABLE CAPACITY'GROSS HHE) o 882 7~ MA'~~:KHlIH DI:.PEh!DABLE CAP'ACXTY (NET MME) + 839
- 8. TF I';HANGES 0!:CLJP XN CAPACITY RATXNGS (XTEMS NUMBER 3 THROUGH 7)
SINfE LAS I REPORT GIVE REASONS'.
POWDER LI=VFL TO 'WHICH RESTRICTED~ IF ANY (NET MME) 10 ~ REASOhjS FOR F<ESTFcICTXQNS ~ XF ANY
'ONTHLY -YTD- CUM!JLATXVE 11 o HOURS XN REPORT PERIOD: 719 2879 32688+0 12'IJHBER OF HOURS PEACTOR HAS'RITICAL 699+3 2828.2 28203i8 13, RFACTOR I'ESERVE SHIJTDQHN HOURS ,OiO OiO OiO 14 o HOl JRS GENERATOR QN-LINE 692e7 2808' 27636+7 15 UNIT RESERVE SHUTDO'AN 'HOURS 0 0 0 16 'ROSS Tl-IEPHAL ENERGY GENERATED (MHH) 1815961 7467711 71505612
- 17. GROSS EL.ECTRICAL ENERGY. GERERATED (MNH) 607870 2513800 23907950'2601'770 18, hlET ELECTRICAL ENFRGY GENERATED (MMH) .575632 2384166
- 19. I Jh/I'1 SERVICE FACTOR 96i3 97i6 84i5 2eo UNIT AVAILABILITYFACTOR 96+3 97+6 84i5
- 21. CAPACITY FACTOR (USING MDC NET) 95o4 '98o7 84+9
- 22. CAPAC:KTY FACTOR (!JSING DER NET) 96o5 99+8 84 i 5
,':.3, l,lh!TT FORCED. OLJTAGE RATE 3.7
- 24. SHiJTOOWNS SrHEDULED OVER NEXT 6 MONTHS ;, 2.4 25,i '.!;F SHlJ! I>Q'4N *T END OF RFPORT PERIOD ~ ESTXHATED DATE OF STARTUP:
0