Ack Receipt of 890213 Response to Violations Noted in Insp Rept 50-482/88-40
ML20235R873
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/27/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 8903030456
Download: ML20235R873 (2)


See also: IR 05000482/1988040

Text

- .

-

.

6- *C

FEB 2 71989

In Reply Refer To: .

Docket: STN 50-482/88-40 l

Wolf Creek Nuclear Operating Corporation

ATTN: Bart D. Withers

l President and Chief Executive Officer

F.O. Box 411

Burlington, kansas 66839

1

Gentlemen:

Thank you for your letter of February 13, 1989, in response to our letter l

.

and inspection report dated January 6, 1989. We have reviewed your reply and

1

find it responsive to the concerns raised in our inspection report. We will l

!

review the implementation of your corrective actions during a future 1

l inspection.

Sincerely, j

Original Signed By, l

A. D. Beadi

L. J. Callan, Director {

Division of Reactor Projects j

CC:

Wolf Creek Nuclear Operating Corporation

ATTN: Otto Maynard, Manager

of Licensing

P.O. Box 411

Burlington, Kansas 66839

Wolf Creek Nuclear Operating Corporation

ATTN: Gary Boyer, Plant Manager

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Commission

ATTN: Robert D. Elliott, Chief Engineer

Fourth Floor, Docking State Of fice Building

Topeka, Kansas 66612-1571

(c 's continued)

4r'tPB C:S RP6 C:RPB C:DRP/ 7

' Terc/ch RJEvc ftt BMurray

D kP

EJHoller L Gdilan

b M /89  % #pt/89 ,g / g/89 2 /27/89 2 /27 /89

'Y\

8903030456 090227 \\

PDR ADOCK 050004 2

,

TLS5

. . .

. .. 1

Wolf Greek' Nuclear Operating Corporation -2-

Program Manager

FEMA Region 7

911 Walnut Street, Room 200

Kansas City, Missouri 64106

Kansas Radiation Control Program Director

bcc to DMB (IE-35)

bcc distrib by RIV:

R. D. Martin, RA

l Myron Karman, ELD, MNBB (1)

Resident Inspector

Section Chief, DRP/D)

DRP

RPB-DRSS

l RIV File

l DRS

l MIS System

RSTS Operator

~

i

i Lisa Shea, RM/ALF

l Inspector

l

Section Chief

B. Murray

R. L. Bangart

l

R. E. Hall

Project Engineer, DRP/D

B.DeFayette, RIII

Callaway, RIII

D. Pickett, NRR Project Manager

l

l

l

l

_______

-

~

.

"

% ' er

=g

n-~o. w-

..

,

.

W$LF CREEK )"" 2

NUCLEAR OPERATING CORPORATION '

~

sart o. witner.

presio.ni and

February 13, 1989

cNet Executive Office'

WM 89-0045

U. S. Nuclear Regulatory Commission

ATTN: Document Control Desk

Mail Station PI-137

Washington, D. C. 20555

Reference: Letter dated January 6, 1989 from L.J. Callan, NRC, to

B.D. Withers, WCNOC

Subj ect : Docket No. 50-482: Response to Inspection Report

482/88-40

Gentlemen:

This letter provides Wolf Creek Nuclear Operating Corporation's (WCNOC) schedule

for correcting the emergency preparedness program exercise weaknesses 482/8840-

01, 02, and 03 which were documented in the reference.

Weakness 482/8840-01 concerning Dose Equivalent Iodine-131 information not being

provided to the shift supervisor has been corrected. This weakness was reviewed

and considered closed in the inspection conducted by Mr. Nemen M. Terc during

the period January 31 through February 2, 1989.

Weakness 482/8840-02 concerning the Radiological Release Information System will

be corrected by August 31, 1939.

Weakness 482/8840-03 concerning the guidance provided by the Technical Support

Center staf f to the control room operators on implementing procedure EMG ES-Il i

j

will be corrected by June 1, 1989. l

4

If you have any questions concerning this matter, please contact me or j

l

Mr. O. L. Maynard of my staff. '

Very truly yours, 1

.

Bart D. Withers

President a nri

Chief Exd ye Officer

BDW/11k

cc: B. L. Bartlett (NRC)

l E. J. Holler (NRC)

l R. D. Martin (NRC)

l D. V. Pickett (NRC)

N. M. Terc (NRC)

PO Box 411/ Durhngton. KS 66839 / Phone- (316) 364-8831

An Equal Oppartumsy Empk>ye, u f +1 CIVET

_ _ _ _ _ _ _