Forwards Errata Sheet Identifying Errors in Insp Rept 50-346/88-12 on 880504-0902.Insp Closing Date Identified in Rept Mistakenly Recorded as 880802 in Several Locations
ML20207L527
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/11/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
References
NUDOCS 8810170337
Download: ML20207L527 (2)


See also: IR 05000346/1988012

Text

._. -

_,

,k UNITED STATES

g, _ ##foug[*,, NUCLEAR REGULATORY COMMISSION

g ( o RECION lit

5- !f 7,, ROOSEVELT RO AD

  • CLEN ELLYN ILUNO15 66lD

.....

'OCT 1 i tasa

Docket No. 50-346

Toledo Edison Company

ATTN: Mr. Donala Shelton

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

'

On September 22, 1988, Inspection Report No. 50-346/88012(DRP)wassenttoyou

documenting inspections conducted from May 4, 1988 through September 2, 1988.

However, the inspection period closing date identified in the inspection

report was mistakenly recorded as August 2,1988 at several locations in the

report and its associated cover letter. Attached to this letter is an errata

sheet identifying the location where those errors occurred.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the attached errata sheet will be placed in the NRC Public

Document Room.

We will gladly discuss any questions you have concerning this letter.

Sincerely,

%;14=w

Edward G. Greenman, Director

Division of Reactor Projects

Enclosure: Errata Sheet

for Inspection Report

No.50-346/88012(DRP)

cc w/ enclosure:

L. Storz, Plant Manager

rDC0/DCS(AIDS)s

1.icensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Conmission

8810170337 G81011 * I

PDR ADOCK 05000346

O PDC

I

.

.

.

.

ATTACHMENT

Errata Sheet for Inspection Report No. 50-346/88012

r

Pajle Lin0 Now Reads 'hould Read

1 (Cover 3 May 4 through August 2,1988, May 4 through September 2

Letter)

1 (Notice of 1 As a result of the inspection As a result of the inspection

Violation) conducted on May 4, through conducted on May 4, through

August 2, 1988, and September 2, 1988, and l

1(Inspection 10 Inspection conducted: May 4 through Inspection conducted: May 4

Report) August 2, 1988 through September 2,1988

1 (Inspection 17 Inspection on May 4, through Inspection on May 4, through

Report) August 2, 1988 September 2, 1988

2 (Inspection 18 Denotes those persons present at Denotes those persons present

Report) the exit meeting on Augus', 1, 1988 at the exit meeting on

September 1, 1988 ,

f

!

l

i

I

l

l

'

1

1

!

I

.