Forwards Safety Evaluation Granting 6 Month,Temporary Change to Tech Spec Bases B 3/4.7.6, Control Room Air Conditioning Sys Until Appropriate Changes Incorporated Into Limiting Conditions for Operation & Surveillance Requirements
ML20207F314
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/09/1988
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20207F316 List:
References
TAC-67852, NUDOCS 8808180260
Download: ML20207F314 (3)


Text

'

August 9,1988 Docket No. 50-382 Mr. J. G. Dewease Senior Vice President - Nuclear Operations Louisiana Power and Light Company 317 Baronne Street, Mail Unit 17 New Orleans, Louisiana 70112

Dear Mr. Dewease:

SUBJECT:

CONTROL ROOM AIR CONDITIONING, BASES CHANGE (TACNO.67852)

By letu r dated March 28, 1988, the Louisiana Power and I.ight Company proposed a revision to the Technical Specification (TS) Bases, B 3/4.7.6, "Control Room Air Conditioning System." The propcsed change would allow a Control Room Air Handling Unit and Emergency Filtration Unit in opposite trains to be credited for system operability.

The purpose of the proposed revision is to more accurately reflect the control room air conditioning system design in the TS bases. Based on our review, we

, have determined that the proposed change is acceptable on a temporary basis until appropriate changes are incorporated into the TS Limiting Conditions for Operation and Surveillance Requirements. We have discussed this apprcach with your staff and it is our understanding that they are amenable to investigating possible changes to the TS to accoirplish the same purpose. The change to the Bases is effective for six months from the date of this letter and may be ex--

tended by letter from this office on the demonstration'of best efforts by LP&L.

Our Safety Evaluation is enclosed for your information.

Sincerely, '

/t/

David L. Wigginton, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects

Enclosures:

N 1) Safety Evaluation '

osNS 2) Bases Pages B 3/4 7-3 880- and B 3/4 7-4 OS co o ec r/ enclosures:

or See next page

$S oo DISTRIBUTION P (DocketJHe ** NRr PDR Local PDR PD4 Reading

@g L. Rubenstein J. Calvo P. Noonan D. Win g'o a OGC-Rockville E. Jordan B. Giimes ACRS(ginton 10)

PD4 Plant File PD4/L DD4/PM PD4/D/MG PNoona DWig inton:sr/kb JCalvo (q $ '

08/$/88 08/ /88 08/9/B8 p [*

\

i

l ga tuo a uq[*g UNITED STATES

$ g NUCLEAR REGULATORY COMMISSION i 7e j WASHINGTON, D. C. 20555 ,

% ,,,,, # August 9,1988 Docket No. 50-382 Mr. J. G. Dewease Senior Vice President - Nuclear Operations Louisiana Power and Light Company 317 Baronne Street, Mail Unit 17 New Orleans, Louisiana 70112

Dear Mr. Dewease:

SUBJECT:

CONTROL ROOM AIR CONDITIONING; BASES CHANGE (TAC NO. 67852)

By letter dated March 28, 1988, the Louisiana Power and Light Company proposed a revision to the Technical Specification (TS) Bases, B 3/4.7.6, "Control Roon Air Conditioning System." The proposed change would allow a Centrol Room Air Handling Unit and Emergency Filtration Unit in opposite trains to be credited for system operability. i The purpose of the proposed revision is to more accurately reflect the control room air conditioning system design in the TS bases. Based on rur review, we have determined that the proposed chr.nge is acceptable on a temp cary basis until appropriate changes are incorporated into the TS Limiting Conditions for Operation and Surveillance Requirements. We have discussed this approach with your staff and it is our understanding that they are amenable to investigating possible changes to the TS to accorrplish the same purpose. The change to the Bases is effective for six months from the date of this letter and may be ex-tended by letter from this office on the demonstration of best efforts by LPAL.

Our Safety Evaluation is enclosed for your information.

Sincerely.

David '.. Wi g nton, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects l

Enclosures:

1) Safety Evaluation ,
2) Bases Pages B 3/4 7-3 i and B 3/4 7-4 cc w/ enclosures: I See next page l l

l

Mr. Jerrold G. Dewease -

Waterford 3  :

Louisiana Power & Light Company cc:

W. Malcolm Stevenson, Esq. Regional Mministrator, Region IV Monroe & Leinan U.S. Nuclear Regulatory Comission 1432 Whitney Building Office of Executive Director for New Orleans, Louisiana 70103 Operations 611 Ryan Plaza Drive, Suite 1000 Mr. E. Blake Arlington, Texas 76011 Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Mr. William H. Spell, Administrator Washington, D.C. 20037 Nuclear Energy Divisien Office of Environmental Affairs Resident Inspector /Waterford NPS Post Office Box 14690 Post Office Box 822 Baton Rouge, Louisiana 70898 Killona, Louisiana 70066 Mr. Ralph T. Lally President, Police Jury Manager of Quality Assurance St. Charles Parish Middle South Services, Inc. Hahnyt11e, Louisiana 70057 Post Office Box 61000 New Orleans, Louisiana 70161 Chairman William A. Cross Louisiana Public Service Commission Bethesda Licensing Office One American Place, Suite 1630 3 Metro Center Baton Rouge, Lcuisiana 70825-1697 Suite 610 Mr. R. F. Burski, Acting Nuclear Safety and Regulatory Affairs Manager Louisiana Power & Light Company 317 Baronne Street New Orleans, Louisiana 70112 i