ML20198C291
ML20198C291 | |
Person / Time | |
---|---|
Site: | Byron, Comanche Peak, 05000000 |
Issue date: | 05/19/1986 |
From: | Funches J Office of Nuclear Reactor Regulation |
To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
Shared Package | |
ML20197G029 | List: |
References | |
CON-#190-9842, RTR-REGGD-09.003, RTR-REGGD-9.003 A, NUDOCS 8605220376 | |
Download: ML20198C291 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999
[Table view]Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy 1999-09-08 Category:NRC TO UTILITY MONTHYEARML20062G5471990-11-26026 November 1990
[Table view]Forwards Summary of NRC Understanding of Current Status of Unimplemented GSIs at Facility ML20217A1551990-11-14014 November 1990 Forwards Safety Insp Rept 50-455/90-22 on 901002-1107. Violations Noted ML20217A4431990-11-14014 November 1990 Forwards Safety Insp Rept 50-455/90-21 on 900910-11,24-26 & 1107.No Violations Noted ML20058H5501990-11-14014 November 1990 Forwards Insp Repts 50-445/90-40 & 50-446/90-40 on 900918- 1030.Violations Noted But Not Cited IR 05000445/19900371990-11-0808 November 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/90-37 & 50-446/90-37 ML20058G1521990-11-0505 November 1990 Discusses Util 900529 Response to 900402 Notice of Violation.Violations 445/8923-V-01 & 446/8923-V-01 Closed, Per Insp Repts 50-445/89-23 & 50-446/89-23 ML20058G3241990-11-0505 November 1990 Forwards Page 9 of Insp Repts 50-454/90-16 & 50-455/90-15. Page Erroneously Deleted from Original Rept ML20058G4791990-10-31031 October 1990 Forwards Summary of 901022 Meeting W/Util in Arlington,Tx Re Secondary Plant Reliability Problems at Unit 1 ML20058E7141990-10-30030 October 1990 Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant ML20058E6931990-10-29029 October 1990 Forwards Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 901010 ML20058D0261990-10-26026 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/90-36 & 50-446/90-36 ML20058A7121990-10-19019 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/90-16 & 50-446/90-16 on 900806 ML20058A0971990-10-10010 October 1990 Forwards Insp Repts 50-445/90-31 & 50-446/90-31 on 900807- 0918 & Notice of Violation ML20062B2211990-10-0909 October 1990 Requests Response to Question Re Facility Cold Overpressure Mitigation Sys Actuation During Accident Events.Response Requested by 901214 ML20059N4711990-10-0303 October 1990 Ack Receipt of Forwarding Rev 8 to Physical Security Plan.Changes Consistent w/10CFR50.54(p) ML20059M2101990-09-25025 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet ML20059K3361990-09-17017 September 1990 Forwards Insp Repts 50-445/90-36 & 50-446/90-36 on 900820- 24 & Notice of Violation ML20059L3051990-09-14014 September 1990 Forwards SER Re Util 900706 Request for Relief Concerning Inservice Testing Program.Relief Granted from Testing Requirements Which Would Impose Undue Hardship If Immediate Compliance Was Imposed ML20059L4531990-09-14014 September 1990 Forwards Suppl to SER Re Results of Inservice Testing Program Changes Based on Review of 881221 & 890203 Submittals.Changes Acceptable ML20059K3581990-09-13013 September 1990 Ack Receipt of 900820 Revised Response to Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57 ML20059K3561990-09-13013 September 1990 Ack Receipt of 900904 Response to Violations Noted in Insp Repts 50-445/90-22 & 50-446/90-22 ML20059J9861990-09-13013 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Exam to Be Administered on 901010.Results of Exam Should Be Available within 3 Wks of Completion ML20059J6171990-09-11011 September 1990 Forwards Insp Repts 50-445/90-30 & 50-446/90-30 on 900723- 0802.No Violations or Deviations Noted ML20059J2451990-09-10010 September 1990 Forwards Insp Repts 50-445/90-29 & 50-446/90-29 on 900723-27.No Violations Noted ML20059E2301990-08-31031 August 1990 Forwards Insp Repts 50-445/90-26 & 50-446/90-26 on 900705-0807.No Violations or Deviations Noted ML20059E1141990-08-30030 August 1990 Forwards Safety Insp Repts 50-454/90-16 & 50-455/90-15 on 900814-17.No Violations Noted ML20059F3021990-08-30030 August 1990 Forwards Insp Repts 50-445/90-28 & 50-446/90-28 on 900716-20.No Violations or Deviations Noted ML20059D6511990-08-29029 August 1990 Forwards Insp Repts 50-445/90-34 & 50-446/90-34 on 900731- 0807 & Notice of Violation.Action Already Taken to Correct Hot Standby Operating Procedure Inadequacies & No Response to Violation Required ML20059D7791990-08-28028 August 1990 Forwards Investigation Synopsis Re Alleged Attempt to Inhibit Employee from Bringing Safety Concerns to Nrc. Investigation Completed in Apr 1990 ML20056B2681990-08-22022 August 1990 Advises That 881130,890313,0526 & 0920 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss Acceptable ML20059B4271990-08-17017 August 1990 Forwards Safety Insp Repts 50-454/90-17 & 50-455/90-16 on 900701-0811.No Violations Noted ML20059A5891990-08-15015 August 1990 Ack Receipt of 900730 Response to Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19 ML20059A2401990-08-14014 August 1990 Advises That Operator & Senior Operator Licensing Exams Scheduled for Wk of 901203.Preliminary License Applications Should Be Submitted at Least 30 Days Before First Exam Dates in Order to Review Training & Experience of Candidates ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20058L9911990-08-0606 August 1990 Forwards SERs of Responses & Associated Science Application Intl Corp 900614 Technical Evaluation Rept SAIC-89/1640 Re Station Blackout.Revised Response Addressing Areas of Nonconformance Should Be Submitted within 60 Days ML20058M2271990-08-0606 August 1990 Forwards Insp Repts 50-445/90-16 & 50-446/90-16 on 900423-27.Unresolved Item Identified.Inspector Determined That Key Emergency Response Personnel Not Always Proficient in Some Duties ML20058M2441990-08-0303 August 1990 Forwards Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0703 & Notice of Violation.Written Response Requested Based on Specifics Contained in Notice ML20056A4981990-08-0101 August 1990 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls ML20056A1741990-07-30030 July 1990 Advises That Written & Operating Licensing Exams Scheduled for Wk of 901126.Licensee Should Furnish Ref Matl Listed in Encl 1 by 900904 ML20056A1161990-07-27027 July 1990 Forwards Summary of 900717 Meeting in Region IV Ofc Re Const Restart for Unit 2.List of Attendees & Viewgraphs Also Encl ML20055J1481990-07-27027 July 1990 Forwards Performance Assessment Repts 50-445/90-20 & 50-446/90-02 on 900529-0615.Startup Test Program Conducted in Safe & Prof Manner & Facility Operation Could Proceed Above 50% Power ML20055J4311990-07-26026 July 1990 Advises That 900601 Rev 7 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Portions of Plan Administrative in Nature & Do Not Reduce Plan Effectiveness ML20056A0441990-07-25025 July 1990 Grants Temporary Waiver of Compliance from Tech Specs 3.3.2 & 3.6.2.1 Re Containment Spray Sys in Order to Repair & Test Containment Pressure Transmitter 1-PT-0934 W/Unit in Hot Standby ML20055G8701990-07-20020 July 1990 Forwards Insp Repts 50-445/90-23 & 50-446/90-23 on 900618-22.No Violations or Deviations Noted ML20055J1521990-07-20020 July 1990 Forwards Final SALP Repts 50-454/90-01 & 50-455/90-01 for Nov 1989 - Mar 1990 ML20055G7671990-07-20020 July 1990 Ack Receipt of in Response to 900705 Telcon Re Acceptability of THERMO-LAG Fire Barrier Matl.Correspondence Reviewed & Matter Closed ML20055G6661990-07-18018 July 1990 Confirms 900802 Enforcement Conference in Region III Ofc to Discuss Ofc of Investigations & Regional Findings Re Lack of Control of Operability Determinations Involving Emergency Diesel Generators at Plant.Listed Items to Be Discussed ML20055G3301990-07-17017 July 1990 Forwards Safety Insp Repts 50-454/90-14 & 50-455/90-13 on 900513-0630.No Violations Noted ML20055G0541990-07-13013 July 1990 Forwards Insp Repts 50-445/90-24 & 50-446/90-24 on 900618-22 & 25-28.No Violations or Deviations Identified ML20056A0051990-07-11011 July 1990 Advises That NRC Draft Document Re Concerns Associated W/ Util 891229 Response to Insp Repts 50-445/89-60 & 50-446/89-60 Being Placed in Pdr.Opinions in Draft Do Not Constitute Final Agency Position 1990-09-25 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M2871999-10-21021 October 1999
[Table view]Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196K0161999-06-30030 June 1999 Discusses 990622 Meeting at Byron Nuclear Power Station in Byron,Il.Purpose of Visit Was to Meet with PRA Staff to Discuss Ceco Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20207G0601999-06-0707 June 1999 Provides Updated Info Re Number of Failures Associated with Initial Operator License Exam Administered from 980914-0918. NRC Will Review Progress Wrt Corrective Actions During Future Insps ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207G0421999-06-0404 June 1999 Forwards Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.Violations Identified & Being Treated as non-cited Violations ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised 1999-09-08 |
Text
3 -
x +
o
', 1 F NAY1986 Mr. William G. Counsil Executive Vice President Texas Utilities Generating Co.
Skyway Tower-400 North Olive Street, LB-81 1 Dallas, Texas 75201 Re: Comanche Peak Steam Electric Station, Unit 1, Docket No. 50-445A;
- Antitrust Operating License Review; Responses to Regulatory Guide 9.3
Dear Mr. Counsil:
Due to the substantial lapse of time since the antitrust settlement in the captioned case and the scheduled fuel loading for Comanche Peak, the NRC staff would appreciate it if Texas Utilities Electric Company, acting as the lead applicant, would provide responses to the Commission's Regulatory Guide 9.3 (copy enclosed) pertaining to the applicants' changed activity since the September 15, 1980 antitrust settlement. (Though the settlement agreement before the Nuclear Regulatory Commission was not finalized until May 6, 1982, the elements of the settlement were presented to Commission staff in September
~o f 1980.) -Your answer to Item B.2 of Regulatory Guide 9.3 should include those actions or policies which have been implemented in accordance with the antitrust settlement. (This response should be specific, giving names, dates and particulars pursuant to the implementation of the license conditions accompanying the antitrust settlement.)
Please provide these data for all applicants within 60 days of the date of this letter. If you have any questions concerning this request, contact William M. Lambe of my staff at (301) 492-7707.
Thank you for your assistance in this matter.
Sincerely, Origins 1 Signet W Jesse Fusshes -
Jesse L. Funches, Director Planning and Program Analysis Staff Office of Nuclear Reactor Regulation
[
1
Enclosure:
As stated Distribution PRAB r/f & 5/f AVietti, PM JFunches MRushbrook, LA LSolander NRCPDR, LPOR WLambe 2 0ccket.. File' J BVogler *SEE PREVIOUS CONCURP.ENCES
, OFC :PRAB jr l :PRAB" : PPA 5" :0 ELD" : : :
//
- 1 : : : : : :
E K:WLastle/dtf : L5olander :JFunches :BVogler : : :