MONTHYEARML23263A9972024-02-0202 February 2024 Watermarked - DG-5072 - Rev 0 of RG 5.90 - Guidance for Alternative Physical Security Requirements for Small Modular Reactors and Non-Light-Water Reactors ML23286A2682024-02-0202 February 2024 Watermarked - DG-5074 - Access Authorization - Econcurrence Version Clean (02-03-23) ML23286A2822024-02-0202 February 2024 Watermarked - DG-5076 - Physical Protection for Part 53 - 10-13-23 ML23286A2512024-02-0202 February 2024 Watermarked DG-5073 - Fitness for Duty Program for Part 53 - 10-13-23 ML23286A2862024-02-0202 February 2024 Watermarked - DG-5078, Fatigue Management for Nuclear Power Plant Personnel -10-13-23 ML23286A2782024-02-0202 February 2024 Watermarked - DG-5075 - Cyber Security 10-13-23 ML23194A1942023-08-31031 August 2023 Draft Regulatory Guide DG-1404, Revision 1 (RG 1.253 Rev 0) Guidance on Ticap for Non-LWRs ML23012A2422023-02-28028 February 2023 DG-1374 RG 1.152 Rev 4 Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML22165A0722023-02-28028 February 2023 DG-4027, Draft Regulatory Guide 4.2 Supplement 1, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, Revision 2 ML23018A2932023-02-16016 February 2023 Draft Regulatory Guide DG-1418 (RG 1.212 Rev 2), Sizing Large Lead-Acid Storage Batteries. (ACRS Copy) Regulatory Guide 5.892022-11-0101 November 2022 Rev.0, Fitness-for-Duty Programs for Commercial Power Reactor and Category I Special Nuclear Material Licensees ML22067A0142022-03-31031 March 2022 Rev 3 ACRS Spent Fuel Heat Generation in an ISFSI ML22048B8222022-02-18018 February 2022 DG-1389 (ACRS Version for 3-16-22 Meeting) - Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors ML22040A0822021-10-30030 October 2021 Document to Support ACRS Subcommittee Meeting - Redline RG 1.57, Rev 3, Design Limits and Loading Combinations for Metal Primary Reactor Containment System Components ML21167A3512021-06-0101 June 2021 Rev 5 Final Watermarked for ACRS ML21092A1512021-05-0505 May 2021 Rev. 4 ACRS Version ML21092A1342021-05-0505 May 2021 Rev. 2 ACRS Version ML21181A2492021-04-30030 April 2021 Watermark for ACRS Fc Meeting RG 1.9 Rev 5 ML21006A3352021-04-0101 April 2021 DG 1381 for Rev 0 of RG 1.244 - Control of Heavy Loads for Nuclear Facilities ML20168A8832021-04-0101 April 2021 DG-1371, Proposed Rev 6 of RG 1.26, Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants ML21006A3372021-04-0101 April 2021 Regulatory Analysis - DG 1381 - Control of Heavy Loads for Nuclear Facilities ML21083A2892021-02-28028 February 2021 Draft for Acrs Review ML21048A4482021-02-17017 February 2021 Rev. 2 ML20120A6292021-01-31031 January 2021 Operation and Maintenance Code Case Acceptability, ASME OM Code, Revision 4, (DG-1368) ML20120A6332021-01-31031 January 2021 Design, Fabrication, and Materials Code Case Acceptability, ASME Section III, Revision 39, (DG-1366) ML20120A6272021-01-31031 January 2021 ASME Code Cases Not Approved for Use, Revision 7 (DG-1369) ML20120A6312021-01-31031 January 2021 Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 20, (DG-1367) ML21011A2312021-01-31031 January 2021 Rev 4 (Draft for ACRS Fc Review on 2-3-21) ML21012A1972021-01-12012 January 2021 a Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion, RG 1.208, Revision 0 Regulatory Guide 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities2020-12-31031 December 2020 Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20183A4232020-12-31031 December 2020 Draft Regulatory Guide DG-1361 (Proposed Rev. 2 to Reg. Guide 1.89), Environmental Qualification of Certain Electrical Equipment Important to Safety for Nuclear Power Plants ML20238B8732020-12-29029 December 2020 Public Comment Resolutions on DG-1362 for RG 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20282A2982020-12-0404 December 2020 DG-3055, Rev 0, Regulatory Guide (RG) 3.76, Implementation of Aging Management Requirements for Spent Fuel Storage Renewals ML20282A2992020-12-0404 December 2020 Regulatory Analysis for DG-3055, Rev 0, Regulatory Guide (RG) 3.76, Implementation of Aging Management Requirements for Spent Fuel Storage Renewals ML20210M0472020-12-0101 December 2020 Draft Regulation Guide DG-1288: Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspections of Piping ML20231A8562020-11-30030 November 2020 Draft Regulatory Guide DG-1360, Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants ML20231A8352020-11-30030 November 2020 Draft Regulatory Guide DG-1359, Fire Protection for Nuclear Power Plants ML20307A0462020-11-0202 November 2020 Draft for ACRS Public Meeting, RG 1.200, R3, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20210M0442020-10-28028 October 2020 Regulatory Analysis: Draft Regulatory Guide DG-1288 - an Approach for Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspection of Piping (Proposed Revision 2 of Regulatory Guide 1.178, Dated September 2003) ML20154K5842020-09-17017 September 2020 Results of Periodic Review of Regulatory Guide (RG) 1.78 ML20182A7882020-08-31031 August 2020 DG 1373 for RG 1.240 - Fresh and Spent Fuel Pool Criticality Analyses ML20055G8232020-08-0707 August 2020 DG 1363 for Proposed Rev 4 to Regulatory Guide (RG) 1.105 - Setpoints for Safety-Related Instrumentation Regulatory Guide 3.152020-07-31031 July 2020 Regulatory Guide 3.15. Rev 2, Standard Format and Content of License Applications for Receipt and Storage of Unirradiated Power Reactor Fuel and Associated Radioactive Material at a Nuclear Power Plant Regulatory Guide 1.2362020-07-30030 July 2020 Draft for ACRS Review ML20119A6142020-04-28028 April 2020 Response to Comments for RG 1.236 for ACRS ML20105A4672020-04-14014 April 2020 Memo to OCA - for Revision 1 of Regulatory Guide 8.39, Release of Patients Administered Radioactive Material ML20099F0262020-04-0707 April 2020 Public Comment Resolution Table for DG 1341 (Regulatory Guide (RG) 1.188, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses, Rev. 2 ML19206A4892020-02-0606 February 2020 Draft Regulatory Guide DG-1287, an Approach for Plant-Specific, risk-Informed Decisionmaking: Technical Specifications ML19116A0772019-08-31031 August 2019 Draft Regulatory Guide DG-5040, Urine Specimen Collection and Test Results Review Under 10 CFR Part 26, Fitness for Duty Programs. ML19203A0892019-07-31031 July 2019 Assessment of the Continued Adequacy of Revision 2 of Regulatory Guide 1.99 - Technical Letter Report 2024-02-02
[Table view]Some use of "" in your query was not closed by a matching "". |
October 1974
-Nl U.S. ATOMIC ENERGY COMMISSION
REGULATORY GUIDE
DIRECTORATE OF RIGULATORY STANDARDS
'REGULATORY GUIDE.9.3 INFORMATION NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION
WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS
FOR NUCLEAR POWER PLANTS
A. INTRODUCTION
items and any related changes that have occurred or are planned to occur since submission iof the As required by the December 19, 1970, amendments construction permit application:
to the Atomic Energy Act of 1954, the Atomic Energy Commission conducts antitrust reviews with respect to a. Anticipated excess or shortage in generating construction permits and operating licenses it issues for capacity resources not expected at the construc commercial nuclear facilities. The Commission must tion permit stage. Reasons for the excess or
"under certain circumstances, make a finding as to shortage along with data on how the excess will be whether the activities under the permit or license would allocated, distributed, or otherwise utiize4 or how create or maintain a situation inconsistent with the the shortage will be obtained.
antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines b. New power pools or coordinating groups or such review is advisable on the ground that significant changes in structure, activities, policies, practices, changes in the licensee's activities or proposed activities or membership of power pools or coordinating have occurred subsequent to the previous antitrust groups in which the licensee was, is, or will be a review conducted by the Attorney General and the participant.
Commission at the construction permit stage. This rejulatory guide identifies -the type of information that c. Changes in transmission with respect to!(l) the the Regulatory staff considers germane for a decision as nuclear plant, (2) interconnections, or (3)
to whether a second antitrust review is required at the connections to wholesale customers.
operating license stage.
d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and B. INFORMATION NEEDED BY THE AEC basis for such changes should be included.
REGULATORY STAFF IN CONNECTION
e. Changes In design, provisions, or conditions of rate WITH ITS ANTITRUST REVIEW schedules and remasons for such changes. Rate OF OPERATING LICENSE APPLICATIONS increases or decreases are not necessary.
FOR NUCLEAR POWER PLANTS
f. List of all (I) new wholesale customers, (2)
transfers from one rate schedule to another,
1. To assist the regulatory staff in Its review, an including copies of schedules not previously applicant for a license to operate a commercial furnished, (3) changes in licensee's service area, nuclear power plant should consider the following and (4) licensee's acquisitions or mergers.
UWAEC REGULATORY GUIDES Copin of aukle my be obtainpd by .q t kdImcl*m,b drivilom desird , WeeUS.Ammic Em p ComnrIAon. Vdngton. D9. 20564.
Adutsey GuOvldan ba to m rlp med soke muitale w fte pub*ic Amne mn: Director OfRegulato*y Stuncdrd. Comirmns ried ugagtiews for
"t06 s 1*mm
010 AEC s t gmnphnutte eg q = e by d"
e a New"tor e10f1In Iuomw nUIn fdds areNrou-rage* d shoavidbe wit so Ow Secrmtmy pu ohif. Camnewluon. US. Atomic Energy oeon..C. 20645.
orni*
e. WinonW
d. C = ubtlons. to isinete a fuone eSaletig dic problem. or poeulated aucidm, . w o proI-" guidmiem g Antion: Socketirel and Servim Section.
sopme'S. eieery Goultn an tt metlttuee for rqubtlom ened ecomnm wkj Uým b m 0qqie
d. ed gluiee
@N;hd diffe fem U out in I Mbpkln am Isied In ow lotowir "n bd brow om:
d. m .ahwnm
- ~ee~r t ap k g wor~* by d. Cseum.
tm* 010. ators eacm I. Poducw
2. neemrcd WdTom Rtaectors
7. lmmortatlose
&3.F.k eMd e Its
0" L OW4etom Heah PAM"4. = bnv 9~010l. spl t w. Amttrnt eview omteesom 4s ml bl waitl ift w gepohm.
aW IL Mie wd PaeM Portoal 5.
I& eertw
g List of those generating capacity additions 2. licensees whose construction permits Include con committed for operation after the nuclear facility, ditions pertaining to antitrust aspects should list and including ownership rights or power output' discuss those actions or policies which have been allocations. Implemented In accordance with such conditions.
3. Fve copies of a separate document entitled
"Information for Antitrust Review of Operating h. Sumrma'y of requests or indications of Interest by License Application" and containing the above other electric power wholesale or retail dis requested information should be submitted when the tributors, and licensee's response, for any typ, of operating license application documents are sub electric service or cooperative venture or study. mitted or a soon thereafter as possible.
9.3-2 t