ML20155D354

From kanterella
Jump to navigation Jump to search

Requests Addl Info to Complete Review of Intraplant Communications Sys,Including Description of Tests,Summary Test Results & Conclusions & Installation Date of Changes to Communication Sys Fire Water Pumphouse by 860430
ML20155D354
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/02/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
References
TAC-60468, NUDOCS 8604170300
Download: ML20155D354 (4)


Text

. a APR IW Docket No. 50-436 , DISTRIBUTION 2DocketF11e4 BGrimes NRC PDR JPartlow Mr. Oliver D. Kingsley, Jr. Local PDR LKintner Vice President, Nuclear Operations PD#4 Reading P0Brien Mississippi Power & Light Company RB m ero ACRS (10)

P.O. Box 23054 Young, OELD Jackson, Mississippi 39205 EJordan

Dear Mr. Kingsley:

SUBJECT:

GRAND GULF, UNIT 1, INTRAPLANT COMMUNICATIONS SYSTEMS By letter dated January 10, 1986, Mississippi Power & Light Company stated that the licensee had completed testing of intraplant communication systems.

These systems provide communication between the control room and plant areas from which plant personnel may need to communicate with control room operators to mitigate the consequences of an event and attain a safe plant shutdown. The submittal also stated that communications from two plant areas (the fire water pumphouse and the diesel generator buildings) were inadequate. An interim means of communication in the areas, use of portable VHF radios, was proposed and a design change for these two areas was initiated. This submittal was made in accordance with the requirements of License Condition 2.C.(24).

The NRC staff is reviewing the January 10, 1986 submittal and finds that additional information is needed to complete its review. Provide a description of the tests, a sumary of the test results and conclusions. Provide also, a d m ription and installation date of changes to the communications system in the fire water pumphouse and the diesel generator buildings. The staff finds that the proposed use of UHF radios for these two areas is adequate as an interim means of communication.

In order to meet the schedule for review of this licensing action you are requested to provide this information by April 30, 1986. If you cannot meet this date, please advise the NRC Project Manager, L. L. Kintner within 7 days of receipt of this letter.

l The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, l

8604170300 8604G2 Original Sisatd bv l PDR ADOCK 050C0416 p PDR Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing cc: See next ptge P PD#4/D LKintner:lb WButler

/,t/86 p/2 /86

a nc 8 o UNITED STATES

[ 3 3 -fq/(',j NUCLEAR REGULATORY COMMISSION

.3 Vf . ,E WASHING TON, D. C. 20555 N .v(/ ... M 2M Docket No. 50-416 Mr. Oliver D. Kingsley, Jr.

Vice President, Nuclear Operations Mississippi Power & Light Company P.O. Box 23054 Jackson, Mississippi 39205

Dear Mr. Kingsley:

SUBJECT:

GRAND GULF, UNIT 1, INTRAPLANT COMMUNICATIONS SYSTEMS By letter dated January 10, 1986, Mississippi Power & Light Company stated that the licensee had completed testing of intraplant cnnmunication systems.

These systems provide communication between the control room and plant areas from which plant personnel may need to communicate with control room operators to mitigate the consequences of an event and attain a safe plant shutdown. The submittal also stated that communications from two plant areas (the fire water ,

pumphouse and the diesel generator buildings) were inadequate. An interim  !

means of communication in the areas, use of portable l'HF radios, was proposed and a design change for these two areas was initiated. This submittal was made in accordance with the requirements of License Condition 2.C.(24).

The NRC staff is reviewing the January 10, 1986 submittal and finds that additional infonnation is needed to complete its review. Provide a description of the tests, a summary of the test results and conclusions. Provide also, a description and installation date of changes to the communications system in the fire water pumphouse and the diesel generator buildings. The staff finds that the proposed use of UHF radios for these two areas is adequate as an interim means of communication.

l In order to meet the schedule for review of this licensing action you are requested to provide this information by April 30, 1986. If you cannot meet this date, please advise the NRC Project Manager, L. L. Kintner within 7 days of receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing cc: See next page

t 1

Mr. Oliver D. Kingsley, Jr.

Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc: -

Robert B. McGehee, Esquire .

The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire

' Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W. Jackson, Mississippi 39201 Washington, D. C. 20036 ,

Attorney General i

, Mr. Ralph T. Lally Gartin Building 1

Manager of Quality Assurance Jackson, Mississippi 39205

, Middle South Services, Inc. '

P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources Nuclear Licensing and Safety Bureau of Pollution Control Mississippi Power & Light Company Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.

Mr. R. W. Jackson, Project Engineer State Health Officer Br.5tel Power Corporation State Board of Health li 40 Shady Grove Road P.O. Box 1700 I G'.ithersburg, Maryland 20877-1454 Jackson, Mississippi 39205

! Mr. Ross C. Butcher Prcsident i Senior Resident Inspector Clatoorne County Board of Supervisors

.i U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Mr. Ted H. Cloninger Vice President, Nuclear Engineering

> Regional Administrator, Region II and Support i

U.S. Nuclear Regulatory Commission, Mississippi Power & Light Company 101 Marietta Street, N.'l., Suite 2900 Post Office Box 23054 Atlanta, Georgia 30323 Jackson, Mississippi 39205 l Mr. J. E. Cross i Grand Gulf Nuclear Station Site Director Mississippi Power & Light Company

, P.O. Box 756 Port Gibson, Mississippi 39150 Mr. C. R. Hutchinson GGNS General Manager Mississippi Power & Light Company Post Office Box 756 Port Gibson, Mississippi 39150 1

_ , , - _ _ _ . - . _ , , . . - . . , _ __ ___,.,___,J_ . , . . , _ _ _ . . . . , , . . . . . . . _ _ . . _, _ . . .

,- _ ~ - - . . . . _

. . ~ -

  • APR S1W Docket No. 50-416 DISTRIBUTION Docket File BGrimes NRC PDR JPartlow Mr. Oliver D. Kingsley, Jr. Local PDR LKintner Vice President, Nuclear Operations , PD#4 Reading P0Brien Mississippi Power & Light Company RBernero ACRS (10)

P.O. Box 23054 Young, OELD Jackson, Mississippi 39205 EJordan 4

Dear Mr. Kingsley:

SUBJECT:

GRAND GULF, UNIT 1, INTRAPLANT COMMUNICATIONS SYSTEMS By letter dated January 10, 1986, Mississippi Power & Light Company stated that the licensee had completed testing of intraplant communication systems.

! These systems provide comunication between the control room and plant areas i from which plant personnel may need to communicate with control room operators i

to mitigate the consequences of an event and attain a safe plant shutdown. The i submittsl also stated that communications from two plant areas (the fire water pumphouse and the diesel generator buildings) were inadequate. An interim means of communication in the areas, use of portable UHF radios, was proposed and a design change for these two areas was initiated. This submittal was t

, made in accordance with the requirements of License Condition 2.C.(24).

The NRC staff is reviewing the January 10, 1986 submittal and finds that additional information is needed to complete its review. Provide a description of the tests, a sumary of the test results and conclusions. Provide also, a description and installation date of changes to the communications system in the fire water pumphouse and the diesel generator buildings. The staff finds that the proposed use of UHF radios for these two areas is adequate as an interim means of communication. .

In order to meet the schedule for review of this licensing action you are requested to provide this information by April 30, 1986. If you cannot meet this date, please advise the NRC Project Manager, L. L. Kintner within 7 days of receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect

fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, j orlainalasned by Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing 6

cc: See next page P PD#4/D i

LKintner:lb ~ WButler

/, t/86 p/2 /86 i

e--- w,.~-,m,, e- ,- - , .,-..,-.-,.---,-,.nm -,n-,,. , , , , , , . - , , ,ne-,,,n,. .n----....e-,--,,_'a--vnn.,- , ,.w~.