Category:Emergency Preparedness-Emergency Plan
MONTHYEARML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23114A0352023-04-24024 April 2023 Revision of Two Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23061A0592023-03-0202 March 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21187A3012021-07-0606 July 2021 Operating Corp., Revision of Three Procedures and Three Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan2021-05-25025 May 2021 License Amendment Request (LAR) for Revision to the Emergency Plan ML21098A0542021-04-0808 April 2021 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21014A0462021-01-12012 January 2021 Operating Corp. - Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20336A0772020-11-30030 November 2020 Operating Cor - Revision of Six Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20245E4152020-09-0101 September 2020 Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20153A4122020-05-28028 May 2020 Revision of Three Forms That Implement the Radiological Emergency Response Plan (RERP) ML20105A4712020-04-14014 April 2020 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20009C8962019-12-31031 December 2019 Summary of Changes to One Form That Implements the Radiological Emergency Response Plan ML19323D2442019-11-12012 November 2019 Revision of Two Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18352A7662018-12-13013 December 2018 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18352A7652018-12-13013 December 2018 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18178A1732018-06-21021 June 2018 Revision of Three Procedures That Implement the Radiological Emergency Response Plan ML18143B4872018-05-15015 May 2018 Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) WO 18-0016, License Amendment Request for Revision to the Emergency Plan2018-05-0909 May 2018 License Amendment Request for Revision to the Emergency Plan ML18135A1462018-05-0909 May 2018 Attachments I to V: Evaluation of Proposed Changes, Emergency Plan Change Summary, ERO Position Matrix, Summary of Shift Staffing and Letter of Consultation and Concurrence from Off-Site Response Organizations Ack of Opportunity ML18031A0982018-01-22022 January 2018 Summary of Changes to One Form That Implements the Wolf Creek Generating Station Radiological Emergency Response Plan ML18031A0952018-01-22022 January 2018 Revision of One Form That Implements the Radiological Emergency Response Plan ML17346A6772017-12-0606 December 2017 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML17207A1062017-07-20020 July 2017 Summary of Changes to One Form (Epf 06-004-11, Rev. 5)that Implements the Radiological Emergency Response Plan ML17079A2332017-03-13013 March 2017 Revision of Three Forms That Implement the Radiological Emergency Response Plan (RERP) ML16363A1192016-12-13013 December 2016 Submittal of Revision 18A to Procedure AP 06-002, Radiological Emergency Response Plan. NEI 99-01, Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2016-09-30030 September 2016 Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors WO 16-0045, Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2016-09-30030 September 2016 Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors NEI 99-01, Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document2016-09-12012 September 2016 Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document ML16279A3272016-09-12012 September 2016 Proposed Revised EAL Technical Basis Document ML16208A1042016-07-13013 July 2016 Revision of Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16174A1262016-06-15015 June 2016 Revision of Two Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML16139A8922016-05-0505 May 2016 Revision of Four Forms Which Implement the Radiological Emergency Response Plan 2024-03-01
[Table view] Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML22339A0022022-12-0505 December 2022 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML22221A2562022-08-0808 August 2022 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21349A9162021-08-19019 August 2021 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20336A0772020-11-30030 November 2020 Operating Cor - Revision of Six Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20191A0772020-07-0808 July 2020 Revision of Three Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20149K4512020-05-28028 May 2020 Revision of Five Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20118C3902020-04-26026 April 2020 Revision of Four Procedures and Fourteen Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML19346D6692019-12-0505 December 2019 Summary of Changes to Two Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML19247C0712019-08-29029 August 2019 Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan ML19238A0682019-08-15015 August 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19225C6852019-08-0101 August 2019 Errata for Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) ML19100A1322019-03-28028 March 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19036A6162019-01-30030 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML19009A0942019-01-0303 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML18344A0512018-12-0303 December 2018 Summary of Changes to Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) ML18318A3152018-11-0606 November 2018 Summary of Changes to Four Procedures and One Form That Implement the Radiological Emergency Response Plan ML18283A3252018-10-0202 October 2018 Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18268A1362018-09-18018 September 2018 Revision of Four Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML18268A1372018-09-18018 September 2018 Summary of Changes to Four Procedures and Four Forms That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) ML18178A1742018-06-21021 June 2018 Summary of Changes to Three Procedures That Implement Radiological Emergency Response Plan ML18093A4542018-03-22022 March 2018 Revision of One Form That Implements the Radiological Emergency Response Plan ML18026A6212018-01-0404 January 2018 Attachment to RA 18-0001, Summary of Changes to One Procedure EPP 06-006, Rev. 9A That Implements the Radiological Emergency Response Plan (RERP) ML18026A6202018-01-0404 January 2018 Transmittal of Revision 9A of EPP 06-006 Procedure That Implements the Radiological Emergency Response Plan (RERP) ML17332A0402017-11-15015 November 2017 Summary of Changes to Five Procedures and Seven Forms That Implement Radiological Emergency Response Plan ML17137A3962017-05-0909 May 2017 Summary of Changes to a Procedure That Implements the Radiological Emergency Response Plan (RERP) ML17045A4742017-02-0909 February 2017 Revision of a Procedure That Implements the Radiological Emergency Response Plan ML16300A2112016-10-18018 October 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan (RERP) ML16263A3502016-09-13013 September 2016 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16208A1042016-07-13013 July 2016 Revision of Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16139A8922016-05-0505 May 2016 Revision of Four Forms Which Implement the Radiological Emergency Response Plan ML16117A2782016-04-14014 April 2016 Revision of Two Procedures and One Form That Implement the Radiological Emergency Response Plan ML16061A0132016-02-25025 February 2016 Revision of Two Forms That Implement the Radiological Emergency Response Plan ML16020A3952016-01-14014 January 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan, Including Revision 3 to Procedure EPP 06-023 and Revision 3 to Form Epf 06-023-01 ML15357A0612015-12-10010 December 2015 Revision 14 to Form That Implements the Radiological Emergency Response Plan (Rerp), Epf 06-018-011, Technical Support Center Inventory Checklist. ML15013A2132015-01-0606 January 2015 Revision 16 to Radiological Emergency Response Plan, AP 06-002 ML0531104872005-10-28028 October 2005 Radiological Emergency Response Plant AP 06-002, Revision 7 ML0407607322004-03-10010 March 2004 Revision 6 to EPP 06-012, Dose Assessment. Corrected Copy ML0410604082004-03-0808 March 2004 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms ML0402202942004-01-14014 January 2004 Revision 4 to EPP 06-11, Emergency Team Formation and Control, and Revision 3 to EPP 06-013, Exposure Control and Personnel Protection. ML0331802382003-11-0505 November 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms ML0328701392003-10-0303 October 2003 Radiological Emergency Response Plan Implementing Procedures and Forms ML0323704602003-08-0808 August 2003 Revised Epips, Including Epf 06-001-07, Rev. 0 and Epf 06-018-03, Rev. 3 ML0319706682003-07-0909 July 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedure & Forms ML0314304642003-05-16016 May 2003 Changes to Wolf Creek Radiological Emergency Response Plan Implementing Procedures and Forms ML0311305242003-04-17017 April 2003 Changes to Wolf Creek Generating Station - Radiological Emergency Response Plan Implementing Procedures & Forms ML0307002152003-03-0404 March 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures & Forms. Includes EPP 06-001, Revision 4, EPP 06-002, Revision 8, EPP 06-003, Revision 6, EPP 06-004, Revision 7, EPP 06-006, Revision 2 ML0302204832003-01-13013 January 2003 Changes to Wolf, Radiological Emergency Response Plan Implementing Procedures 2024-07-24
[Table view] Category:Letter
MONTHYEARML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, “Preparation and Scheduling of Operator Licensing Examinations” ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24036A0092024-02-14014 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0075 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24036A1852024-02-0505 February 2024 Correction to 2022 Annual Radioactive Effluent Release Report - Report 46 ML24032A1742024-02-0202 February 2024 Withdrawal of Requested Licensing Action Exemption from Specific Provisions in 10 CFR 73.55 ML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 2024-07-31
[Table view] |
Text
Cynthia R. Hafenstine Manager Regulatory Affairs July 13, 2016 RA 16-0054 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: Revision of Three Procedures and One Form that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
Gentlemen:
Three procedures and one form that implement the WCGS RERP have been revised. The revised documents are identified below:
Procedures Effective Dates Form Effective Date EPP 06-001, Rev. 25 June 15, 2016 EPF 06-002-04, Rev. 1 June 15, 2016 EPP 06-002, Rev. 39 June 15, 2016 EPP 06-003, Rev. 24 June 15, 2016 The attached summary of the changes to the implementing procedures and to the implementing form explains that these changes do not reduce the effectiveness of the WCGS RERP. This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
&;~~t.MtJ~
Cynthia R. Hafenstine CRH/rlt
Attachment:
Summary of Changes to Three Procedures and One Form That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) cc: K. M. Kennedy (NRC), w/a C. F. Lyon (NRC), w/a N. H. Taylor (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 /Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
Attachment fo RA 16-0054 Page 1 of 2 Summary of Changes to Three Procedures and One Form That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP)
- 1. Procedure EPP 06-001, "Control Room Operations," Rev. 25 Editorial changes were made to improve the clarity of guidance for evacuation of personnel in step 7.2.2.2.d and to improve the formality of guidance in step 7.2.11 for communicating with the Control Room when command-and-control duties are transferred to an emergency manager. New step 7.2.12 was added to improve plant status updates for Control Room personnel.
The changes to procedure EPP 06-001 support improvement of communication between the Shift Manager and Control Room personnel and compliance with 10 CFR Part 50, Appendix E, Section IV.A.2 and 10 CFR 50.47(b)(1). Therefore, these changes to procedure EPP 06-001 do not reduce the effectiveness of the WCGS RERP.
- 2. Procedure EPP 06-002, "Technical Support Center Operations," Rev. 39 Multiple changes to multiple procedural steps were made to improve the Site Emergency Manager's communication of important information within the Technical Support Center (TSC) and with other emergency response facilities by emphasizing command-and-control and event status updates. This procedure was also changed to enhance the guidance for announcing the activation status of the TSC and the status of responsibility for command-and-control.
The changes to procedure EPP 06-002 enhance guidance for the Site Emergency Manager and the TSC Administrative Coordinator in support of compliance with 10 CFR Part 50, Appendix E, Section IV.A.2. Therefore, the changes to procedure EPP 06-002 do not reduce the effectiveness of the WCGS RERP.
- 3. Procedure EPP 06-003, "Emergency Operations Facility Operations," Rev. 24 Multiple changes to multiple procedural steps were made to improve the Off-Site Emergency Manager's communication of important information within the Emergency Operations Facility (EOF) and interaction with external emergency response organization leaders by emphasizing command-and-control and event status updates. This procedure was also changed to enhance the guidance for announcing the activation status of the EOF and the status of responsibility for command-and-control.
The changes to procedure EPP 06-003 enhance guidance for the Off-Site Emergency Manager and the EOF Administrative Coordinator in support of compliance with 10 CFR Part 50, Appendix E, Section IV.A.2. Therefore, the changes to procedure EPP 06-003 do not reduce the effectiveness of the WCGS RERP.
Attachment to RA 16-0054 Page 2 of 2
- 4. Form EPF 06-002-04, "Facility Briefing," Rev. 1 This form was revised and expanded to improve communication by Site Emergency Managers and Off-Site Emergency Managers within and between emergency response facilities. The changes to form EPF 06-002-04 enhance guidance for the Off-Site Emergency Manager and the EOF Administrative Coordinator in support of compliance with 10 CFR Part 50, Appendix E, Section IV.A.2. Therefore, these changes do not reduce the effectiveness of the WCGS RERP.