Revision of Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
ML16208A104
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/13/2016
From: Hafenstine C
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA 16-0054 EPF 06-002-04, Rev. 1, EPP 06-001, Rev. 25, EPP 06-002, Rev. 39, EPP 06-003, Rev. 24
Download: ML16208A104 (3)


Text

Cynthia R. Hafenstine Manager Regulatory Affairs July 13, 2016 RA 16-0054 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: Revision of Three Procedures and One Form that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

Gentlemen:

Three procedures and one form that implement the WCGS RERP have been revised. The revised documents are identified below:

Procedures Effective Dates Form Effective Date EPP 06-001, Rev. 25 June 15, 2016 EPF 06-002-04, Rev. 1 June 15, 2016 EPP 06-002, Rev. 39 June 15, 2016 EPP 06-003, Rev. 24 June 15, 2016 The attached summary of the changes to the implementing procedures and to the implementing form explains that these changes do not reduce the effectiveness of the WCGS RERP. This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.

&;~~t.MtJ~

Cynthia R. Hafenstine CRH/rlt

Attachment:

Summary of Changes to Three Procedures and One Form That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) cc: K. M. Kennedy (NRC), w/a C. F. Lyon (NRC), w/a N. H. Taylor (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 /Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET

Attachment fo RA 16-0054 Page 1 of 2 Summary of Changes to Three Procedures and One Form That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP)

1. Procedure EPP 06-001, "Control Room Operations," Rev. 25 Editorial changes were made to improve the clarity of guidance for evacuation of personnel in step 7.2.2.2.d and to improve the formality of guidance in step 7.2.11 for communicating with the Control Room when command-and-control duties are transferred to an emergency manager. New step 7.2.12 was added to improve plant status updates for Control Room personnel.

The changes to procedure EPP 06-001 support improvement of communication between the Shift Manager and Control Room personnel and compliance with 10 CFR Part 50, Appendix E, Section IV.A.2 and 10 CFR 50.47(b)(1). Therefore, these changes to procedure EPP 06-001 do not reduce the effectiveness of the WCGS RERP.

2. Procedure EPP 06-002, "Technical Support Center Operations," Rev. 39 Multiple changes to multiple procedural steps were made to improve the Site Emergency Manager's communication of important information within the Technical Support Center (TSC) and with other emergency response facilities by emphasizing command-and-control and event status updates. This procedure was also changed to enhance the guidance for announcing the activation status of the TSC and the status of responsibility for command-and-control.

The changes to procedure EPP 06-002 enhance guidance for the Site Emergency Manager and the TSC Administrative Coordinator in support of compliance with 10 CFR Part 50, Appendix E, Section IV.A.2. Therefore, the changes to procedure EPP 06-002 do not reduce the effectiveness of the WCGS RERP.

3. Procedure EPP 06-003, "Emergency Operations Facility Operations," Rev. 24 Multiple changes to multiple procedural steps were made to improve the Off-Site Emergency Manager's communication of important information within the Emergency Operations Facility (EOF) and interaction with external emergency response organization leaders by emphasizing command-and-control and event status updates. This procedure was also changed to enhance the guidance for announcing the activation status of the EOF and the status of responsibility for command-and-control.

The changes to procedure EPP 06-003 enhance guidance for the Off-Site Emergency Manager and the EOF Administrative Coordinator in support of compliance with 10 CFR Part 50, Appendix E, Section IV.A.2. Therefore, the changes to procedure EPP 06-003 do not reduce the effectiveness of the WCGS RERP.

Attachment to RA 16-0054 Page 2 of 2

4. Form EPF 06-002-04, "Facility Briefing," Rev. 1 This form was revised and expanded to improve communication by Site Emergency Managers and Off-Site Emergency Managers within and between emergency response facilities. The changes to form EPF 06-002-04 enhance guidance for the Off-Site Emergency Manager and the EOF Administrative Coordinator in support of compliance with 10 CFR Part 50, Appendix E, Section IV.A.2. Therefore, these changes do not reduce the effectiveness of the WCGS RERP.