MONTHYEARML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML22339A0022022-12-0505 December 2022 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML22221A2562022-08-0808 August 2022 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21349A9162021-08-19019 August 2021 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20336A0772020-11-30030 November 2020 Operating Cor - Revision of Six Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20191A0772020-07-0808 July 2020 Revision of Three Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20149K4512020-05-28028 May 2020 Revision of Five Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20118C3902020-04-26026 April 2020 Revision of Four Procedures and Fourteen Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML19346D6692019-12-0505 December 2019 Summary of Changes to Two Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML19308B4122019-10-28028 October 2019 CFR 50.54(q)(5) Procedure Change Summary Analysis ML19247C0712019-08-29029 August 2019 Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan ML19238A0682019-08-15015 August 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19225C6852019-08-0101 August 2019 Errata for Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) ML19162A1752019-06-0606 June 2019 10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML19100A1322019-03-28028 March 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19036A6162019-01-30030 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML19009A0942019-01-0303 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML18344A0512018-12-0303 December 2018 Summary of Changes to Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) ML18318A3152018-11-0606 November 2018 Summary of Changes to Four Procedures and One Form That Implement the Radiological Emergency Response Plan ML18283A3252018-10-0202 October 2018 Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18268A1362018-09-18018 September 2018 Revision of Four Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML18268A1372018-09-18018 September 2018 Summary of Changes to Four Procedures and Four Forms That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) ML18178A1742018-06-21021 June 2018 Summary of Changes to Three Procedures That Implement Radiological Emergency Response Plan ML18093A4542018-03-22022 March 2018 Revision of One Form That Implements the Radiological Emergency Response Plan ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML18024A4742018-01-11011 January 2018 Submittal of Radiological Emergency Plan Annex Revisions ML18024A4762018-01-11011 January 2018 Attachments 1-4: 10CFR50.54(q)(5) Procedure Change Summary Analysis, EP-AA-1007, Rev. 33, EP-AA-1008, Rev 30 and EP-AA-1012, Rev. 4 ML18026A6202018-01-0404 January 2018 Transmittal of Revision 9A of EPP 06-006 Procedure That Implements the Radiological Emergency Response Plan (RERP) ML18026A6212018-01-0404 January 2018 Attachment to RA 18-0001, Summary of Changes to One Procedure EPP 06-006, Rev. 9A That Implements the Radiological Emergency Response Plan (RERP) ML17332A0402017-11-15015 November 2017 Summary of Changes to Five Procedures and Seven Forms That Implement Radiological Emergency Response Plan ML17271A1782017-09-21021 September 2017 Radiological Emergency Plan Annex and Addendum Revisions ML17137A3962017-05-0909 May 2017 Summary of Changes to a Procedure That Implements the Radiological Emergency Response Plan (RERP) ML17045A4742017-02-0909 February 2017 Revision of a Procedure That Implements the Radiological Emergency Response Plan ML17041A2922017-02-0101 February 2017 Revision 32 to EP-AA-1007, Radiological Emergency Plan Annex and 10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML17037D2002017-02-0101 February 2017 Revision 32 to EP-AA-1007, Radiological Emergency Plan Annex ML16300A2112016-10-18018 October 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan (RERP) ML16267A4602016-09-14014 September 2016 Submittal of Revision 4 to Radiological Emergency Plan EP-AA-1007, Addendum 3 ML16263A3502016-09-13013 September 2016 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16208A1042016-07-13013 July 2016 Revision of Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16190A3852016-07-0808 July 2016 EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure ML16139A8922016-05-0505 May 2016 Revision of Four Forms Which Implement the Radiological Emergency Response Plan ML16117A2782016-04-14014 April 2016 Revision of Two Procedures and One Form That Implement the Radiological Emergency Response Plan ML16061A0132016-02-25025 February 2016 Revision of Two Forms That Implement the Radiological Emergency Response Plan ML16049A2592016-02-11011 February 2016 EP-AA-1007, Addendum 3, Revision 3, Emergency Action Levels for Pbaps. ML16020A3952016-01-14014 January 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan, Including Revision 3 to Procedure EPP 06-023 and Revision 3 to Form Epf 06-023-01 ML16028A1722016-01-14014 January 2016 EP-AA-1007, Addendum 3, Revision 2, Emergency Action Levels for Pbaps. RA-15-112, Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390)2015-12-15015 December 2015 Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390) 2024-07-24
[Table view] Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 IR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement 2024-09-06
[Table view] |
Text
Dustin T. Hamman Director Nuclear and Regulatory Affairs August 19, 2023 000084
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-482 and 72-79: Revision of One Procedure that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
Commissioners and Staff:
In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), WCGS is submitting a change to the emergency plan. Specifically, one procedure that implements the WCGS RERP has been revised. The revised document is identified below:
Procedure Effective Date EPP 06-009, Rev. 13 July 24, 2023
The attached summary of the changes to the implementing procedure explains these changes do not reduce the effectiveness of the WCGS RERP.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely,
Dustin T. Hamman
DTH/nwl
Attachment:
Summary of Changes to One Procedure that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
cc: S. S. Lee (NRC), w/a J. D. Monninger, (NRC), w/a G. E. Werner (NRC), w/a Director of Division of Fuel Management (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a WC Licensing Correspondence, wo/a - RA 23-000084
P.O. Box 411 l Burlington, KS 66839 l 620-364-8831
Attachment to 000084 Page 1 of 1
Summary of Changes to One Procedure that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
- 1. Procedure EPP 06-009, DRILL AND EXERCISE REQUIREMENTS, Rev. 13
Procedure EPP 06-009 has been revised. This change is in response to EP Program exit meeting held on January 26, 2023, NRC Inspection Report 2023-001, the NRC inspector indicated that WCGS will receive an NRC-Identified Green Non-Cited Violation (NCV) of 10 CFR 50.54(q)(2) for the failure to maintain the effectiveness of the Emergency Plan by not conducting annual medical drills.
New guidance is being added to Section 7.1.9 Medical Emergency Drills to align with the Letters of Agreement with Coffey County Hospital and Newman Regional Health. These agreements require that Wolf Creek Nuclear Operating Corporation (WCNOC) personnel with expertise in radiological practices accompany the transportation of a contaminated, injured individual from Wolf Creek to the hospital during drills and exercises.
Also, a minor word change is being made to the step that describes the Medical Emergency Drills; should include is being changed to include. This change aligns to the station emergency plan.
These changes do not reduce the effectiveness of the Wolf Creek Radiological Emergency Response Plan.