ML22221A256

From kanterella
Jump to navigation Jump to search
Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
ML22221A256
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/08/2022
From: Hamman D
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA 22-0061
Download: ML22221A256 (2)


Text

Dustin T. Hamman Director Nuclear and Regulatory Affairs August 08, 2022 RA 22-0061 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Docket No. 50-482: Revision of One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

Commissioners and Staff:

In accordance with 10 CFR 50.54(q)(5), WCGS is submitting a change to the emergency plan.

Specifically, one form that implements the WCGS RERP has been revised. The revised document is identified below:

Forms Effective Dates EPF 06-001-08, Rev. 3 July 11, 2022 The attached summary of the changes to the implementing form explains that these changes do not reduce the effectiveness of the WCGS RERP.

This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.

Sincerely, Dustin Hamman DTH/

Attachment:

Summary of Changes to One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) cc: S. S. Lee (NRC), w/a S. A. Morris, (NRC), w/a G. E. Werner (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a

Attachment to RA 22-0061 Page 1 of 1 Summary of Changes to One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

1. Form EPF 06-001-08, OFF-SITE COMMUNICATOR CHECKLIST, Rev. 3 Form EPF 06-001-08 is being revised to remove the need to distinguish between normal and non-normal working hour for ERO notifications. The standardization of the TSC activation to 75 minutes negates the need to distinguish between normal and non-normal working hours. The automatic dialing system (ADS) is to be used for ERO notification at all times.

This change includes two administrative changes. In the Emergency Notifications block, Coffey County was changed to Coffey County Sheriff and Westar Generation Operations was changed to Evergy Generation Operations. These changes are being made to be consistent with the Immediate and Follow-up Emergency Notification forms.

These changes do not reduce the effectiveness of the Emergency Plan.