July 02, 2024
SUBJECT:
WOLF CREEK GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000482/2024401
Dear Jaime McCoy:
On June 13, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000482 License No. NPF-42
Enclosure:
As stated
Inspection Report
Docket No.
05000482
License No.
Report No.
Enterprise Identifier:
I-2024-401-0014
Licensee:
Wolf Creek Nuclear Operating Corporation
Facility:
Wolf Creek Generating Station
Location:
Burlington, KS
Inspection Dates:
June 10, 2024 to June 13, 2024
Inspectors:
R. Lanfear, Physical Security Inspector
T. Weir, Physical Security Inspector
Approved By:
Ray L. Kellar, P.E., Chief
Physical Security Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated January 1, 2024
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All requirements
71130.07 - Security Training
The inspectors evaluated the security training program. The following elements were evaluated from this IP dated January 2, 2024:
Security Training (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: 6 Requirements (02.10, 02.11a, 02.12a-b, 02.13a-b)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 13, 2024, the inspectors presented the security baseline inspection results to Jaime McCoy and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
10028966, 10029912
Corrective Action
Documents
Resulting from
Inspection
10033990,
10034236,10034307,
10034311, 10034314,
10034318, 10034193,
10034312, 10034277
Procedures
AI 27-006
Safety / Security Interface
Procedures
AI-15D-027
Ongoing Monitoring & Vulnerability Analysis (OM&VA)
Procedures
SEC 01-101
Security Equipment Issue
46A
Procedures
SEC 01-101
Security Communications
46A
Procedures
SEC 01-108A
Security System Performance Testing
Self-
Assessments
23-01-SEC/CS
Quality Assurance Audit Report
03/03/2023
Work Orders
23-483723-000
Perform Camera PMs at each of the Security OP
locations
09/27/2023
Work Orders
Security System CPUA server and associated
components Semiannual PM testing
04/20/2024
Work Orders
Perform Security Gate 1 lift tables SCQB10 and SCQB11
Lubrication and Inspection
05/13/2024
Corrective Action
Documents
10016192, 10016204,
10022937
Condition Report
09/22/2022
Corrective Action
Documents
Resulting from
Inspection
10034272, 10034273,
10034276, 10034309
Miscellaneous
Course of Fire
Day Handgun
09/26/2022
Miscellaneous
Course of Fire
Day Rifle
09/26/2022
Miscellaneous
Course of Fire
Low Light Handgun
09/26/2022
Miscellaneous
Course of Fire
Low Light Rifle
09/26/2022
Miscellaneous
Course of Fire
Thermal Rifle
09/26/2022
Procedures
Wolf Creek Security Training Desktop
Rev. 19
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Wolf Creek Security Plan, Training and Qualification Plan,
Safeguards Contingency Plan, Independent Spent Fuel
Storage Installation
Procedures
AI 30E-005
Instructor Qualification Requirements
Rev. 42
Procedures
SEC 01-401
Security Personnel Critical Tasks
Rev. 26
Procedures
SEC 01-402
Security Personnel Training and Qualification
Rev. 50
Procedures
SEC 01-403
Security Personnel Medical Qualifications
Rev. 32
Procedures
SEC 01-415
Systematic Approach to Security Training
Rev. 0
Self-
Assessments
23-01-SEC/CS
QUALITY ASSURANCE AUDIT REPORT
03/17/2023
Self-
Assessments
QH-2024-2627
NRC Security Baseline Inspection Readiness Assessment
Checklist IP 71130.07
2/22/2024