|
---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23114A0352023-04-24024 April 2023 Revision of Two Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23061A0592023-03-0202 March 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21187A3012021-07-0606 July 2021 Operating Corp., Revision of Three Procedures and Three Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan2021-05-25025 May 2021 License Amendment Request (LAR) for Revision to the Emergency Plan ML21098A0542021-04-0808 April 2021 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21014A0462021-01-12012 January 2021 Operating Corp. - Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20336A0772020-11-30030 November 2020 Operating Cor - Revision of Six Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20245E4152020-09-0101 September 2020 Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20153A4122020-05-28028 May 2020 Revision of Three Forms That Implement the Radiological Emergency Response Plan (RERP) ML20105A4712020-04-14014 April 2020 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20009C8962019-12-31031 December 2019 Summary of Changes to One Form That Implements the Radiological Emergency Response Plan ML19323D2442019-11-12012 November 2019 Revision of Two Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18352A7662018-12-13013 December 2018 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18352A7652018-12-13013 December 2018 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18178A1732018-06-21021 June 2018 Revision of Three Procedures That Implement the Radiological Emergency Response Plan ML18143B4872018-05-15015 May 2018 Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) WO 18-0016, License Amendment Request for Revision to the Emergency Plan2018-05-0909 May 2018 License Amendment Request for Revision to the Emergency Plan ML18135A1462018-05-0909 May 2018 Attachments I to V: Evaluation of Proposed Changes, Emergency Plan Change Summary, ERO Position Matrix, Summary of Shift Staffing and Letter of Consultation and Concurrence from Off-Site Response Organizations Ack of Opportunity ML18031A0982018-01-22022 January 2018 Summary of Changes to One Form That Implements the Wolf Creek Generating Station Radiological Emergency Response Plan ML18031A0952018-01-22022 January 2018 Revision of One Form That Implements the Radiological Emergency Response Plan ML17346A6772017-12-0606 December 2017 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML17207A1062017-07-20020 July 2017 Summary of Changes to One Form (Epf 06-004-11, Rev. 5)that Implements the Radiological Emergency Response Plan ML17079A2332017-03-13013 March 2017 Revision of Three Forms That Implement the Radiological Emergency Response Plan (RERP) ML16363A1192016-12-13013 December 2016 Submittal of Revision 18A to Procedure AP 06-002, Radiological Emergency Response Plan. NEI 99-01, Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2016-09-30030 September 2016 Wolf Creek Nuclear Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors WO 16-0045, Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2016-09-30030 September 2016 Operating Corporation Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors NEI 99-01, Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document2016-09-12012 September 2016 Wolf Creek Generating Station Proposed Revised EAL Technical Basis Document ML16279A3272016-09-12012 September 2016 Proposed Revised EAL Technical Basis Document ML16208A1042016-07-13013 July 2016 Revision of Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16174A1262016-06-15015 June 2016 Revision of Two Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML16139A8922016-05-0505 May 2016 Revision of Four Forms Which Implement the Radiological Emergency Response Plan 2024-03-01
[Table view] Category:Letter
MONTHYEARML24306A2192024-11-0101 November 2024 Results of the Steam Generator Tube Inservice Inspection During the 26th Refueling Outage to Reflect TSTF-577 Reporting Requirements IR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 2024-09-06
[Table view] |
Text
P.O. Box 411 l Burlington, KS 66839 l 620-364-8831 Ron Benham Director Nuclear and Regulatory Affairs July 6, 2021 RA 21-0049 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket No. 50-482: Revision of Three Procedures and Three Forms that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
Commissioners and Staff:
In accordance with 10 CFR 50.54(q)(5), WCGS is submitting a change to the emergency plan. Three procedures and three forms that implement the WCGS RERP have been revised. The revised documents are identified below:
Procedures Effective Dates EPP 06-008, Rev. 1B June 8, 2021 EPP 06-012, Rev. 17B June 8, 2021 EPP 06-019, Rev. 10 June 8, 2021 Forms Effective Dates EPF 06-019-01, Rev. 7 June 8, 2021 EPF 06-019-02, Rev. 3 June 8, 2021 EPF 06-019-03, Rev. 2 June 8, 2021 The attached summary of the changes to the implementing procedures and the implementing forms explain that these changes do not reduce the effectiveness of the WCGS RERP.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely, Ron Benham RDB/rlt
Attachment:
Summary of Changes to Three Procedures and Three Forms that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) cc:
S. S. Lee (NRC), w/a S. A. Morris (NRC), w/a N. OKeefe (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a
Attachment to RA 21-0049 Page 1 of 2 Summary of Changes to Three Procedures and Three Forms that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
- 1. Procedure, EPP 06-008, Re-Entry Recovery and Termination Operations, Rev.
1B Procedure EPP 06-008 is being changed to incorporate changes that are administrative in nature. Changes are being made to update a previously approved organization title, update reference titles, make an editorial change associated with the use of acronyms, and corrected the title of a support agreement.
The change does not reduce the effectiveness of the Emergency Plan.
- 2. Procedure, EPP 06-012, Dose Assessment, Rev. 17B The Emergency Dose Calculation Program Spent Fuel Pool (SFP) option allows the operator to calculate releasable activity from a fire in the SFP. This activity is based on values from the most recent refueling outage. The procedure guidance references the SFP refuel data. The tables that provide this SFP refuel data tables have been updated. The procedure is being changed to reflect the updated data.
The change does not reduce the effectiveness of the Emergency Plan.
- 3. Procedure, EPP 06-019, Alert and Notification System Sirens, Rev. 10 Procedure EPP 06-019 is being superseded by Procedure AI 06-003, Coffey County Alert and Notification Sirens.
- A new Alert and Notification System (ANS) that uses Integrated Public Alert Warning System (IPAWS)/Wireless Emergency Alerting (WEA) and IPAWS/EAS (Emergency Alert System) is now the primary means to initiate alerting and notification of the public during an emergency at Wolf Creek. IPAWS/WEA and IPAWS/EAS replace the use of outdoor sirens and tone alert radios as the primary ANS. Route alerting remains as the back-up means for alert and notification.
- The sirens will be utilized by Coffey County for other notifications such as fire or tornado.
- EPP 06-019 was used for the creation of AI 06-003 with multiple changes that resulted in a rewrite of the procedure.
- AI 06-003 is not considered a procedure that is part of the RERP as the sirens are no longer the credited method for notification.
The change does not reduce the effectiveness of the Emergency Plan.
- 4. Form, EPF 06-019-01, ANS Siren Semi-Annual Maintenance, Rev. 7 Form EPF 06-019-01 is being superseded by AIF 06-003-01, Coffey County Siren Annual Maintenance.
The change does not reduce the effectiveness of the Emergency Plan.
- 5. Form, EPF 06-019-02, ANS Siren Test Report, Rev. 3 Form EPF 06-019-02 is being superseded by AIF 06-003-02, Coffey County Siren Test Report.
Attachment to RA 20-0049 Page 2 of 2 The change does not reduce the effectiveness of the Emergency Plan.
- 6. Form, EPF 06-019-03, ANS Siren Battery Maintenance, Rev. 2 Form EPF 06-019-03 is being superseded by AIF 06-003-03, Coffey County Siren Battery Maintenance.
The change does not reduce the effectiveness of the Emergency Plan.