IR 05000482/2024005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005)
ML24227B004
Person / Time
Site: Wolf Creek, Peach Bottom  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/14/2024
From: Greg Werner
NRC/RGN-IV/DORS/PBB
To: Reasoner C
Wolf Creek
References
IR 2024005
Download: ML24227B004 (1)


Text

August 14, 2024

SUBJECT:

UPDATED INSPECTION PLAN FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2024005)

Dear Cleve Reasoner:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Wolf Creek Generating Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC has completed the onsite portion of Inspection Procedure 92702, Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders, during the third quarter of 2024. This inspection was associated with Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 (ML19092A335). The results of this inspection will be communicated in the NRC Integrated Inspection Report 05000482/2024003. The NRC will conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, scheduled for January 2025.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system ADAMS, which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact David Proulx at (817) 200-1561 with any questions you have regarding this letter.

Sincerely, Gregory E. Werner, Chief Projects Branch B Division of Operating Reactor Safety Docket Nos. 05000482; 07200079 License No. NPF-42 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Werner, Gregory on 08/14/24

ML24227B004 SUNSI Review By: PON ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

NRC-002 OFFICE SPE: DORS/B BC: DORS/B NAME DProulx GWerner SIGNATURE

/RA/

/RA/

DATE 08/01/2024 08/14/2024

Site Inspection Activity Plan Wolf Creek 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count WC IP 92702, Follow-up on Traditional Enforcement Actions - Confirmatory Order

1 7/15/2024 7/26/2024 IP 92702 CONF 001697 Enforcement Related Order Follow-Up-Only RP 5,8

1 7/22/2024 7/26/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

7/22/2024 7/26/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

7/22/2024 7/26/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation WC 2024 PI&R Inspection

1 7/22/2024 7/26/2024 IP 71152B 000747 Problem Identification and Resolution EP Program & PI Inspection (2024) - WC

1 8/5/2024 8/9/2024 IP 71114.02 000717 Alert and Notification System Testing

8/5/2024 8/9/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

8/5/2024 8/9/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

8/5/2024 8/9/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness

8/5/2024 8/9/2024 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - WC

1 8/26/2024 8/30/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

9/16/2024 9/20/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Comprehensive Engineering Team Inspection - Wolf Creek

1 10/21/2024 10/25/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

11/4/2024 11/8/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)

1 11/18/2024 11/22/2024 IP 71130.02 000734 Access Control

11/18/2024 11/22/2024 IP 71130.09 001656 Security Plan Changes

11/18/2024 11/22/2024 IP 71151 001338 Performance Indicator Verification License Renewal 71003 - WC (Phase 2)

1 1/20/2025 1/24/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal

2/3/2025 2/7/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal MC&A - WC

1 2/24/2025 2/28/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

Commercial Grade Dedication Inspection - Wolf Creek

1 3/24/2025 3/28/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

4/7/2025 4/11/2025 IP 71111.21N.03 001808 Commercial Grade Dedication Prepared on 8/13/2024 1:48:31 PM 1 of 3

Site Inspection Activity Plan Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)

1 3/31/2025 4/4/2025 IP 71130.02 000734 Access Control

3/31/2025 4/4/2025 IP 71130.09 001656 Security Plan Changes

3/31/2025 4/4/2025 IP 71151 001338 Performance Indicator Verification Cyber Security Inspection - WC

1 5/12/2025 5/16/2025 IP 71130.10 000741 Cybersecurity EP 2025 Biennial Exercise & PI Inspection - WC

1 6/2/2025 6/6/2025 IP 71114.01 000716 Exercise Evaluation

6/2/2025 6/6/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

6/2/2025 6/6/2025 IP 71151 001397 Performance Indicator Verification Security Protective Strategy (71130.05) and Target Sets (71130.14)

1 6/23/2025 6/27/2025 IP 71130.05 000737 Protective Strategy Evaluation

6/23/2025 6/27/2025 IP 71130.14 000743 Review of Power Reactor Target Sets WC 2025 INITIAL EXAM

1 7/6/2025 7/12/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

8/17/2025 8/23/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Inservice Inspection-WC

1 10/6/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,4,PI - WC

1 10/13/2025 10/17/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

10/13/2025 10/17/2025 IP 71124.04 000728 Occupational Dose Assessment

10/13/2025 10/17/2025 IP 71151 000746 Performance Indicator Verification Age-Related Degradation Inspection - Wolf Creek

1 3/30/2026 4/3/2026 IP 71111.21N.04 001832 Age-Related Degradation

4/13/2026 4/17/2026 IP 71111.21N.04 001832 Age-Related Degradation RP 1,4,PI - WC

1 4/13/2026 4/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

4/13/2026 4/17/2026 IP 71124.04 000728 Occupational Dose Assessment

4/13/2026 4/17/2026 IP 71151 000746 Performance Indicator Verification RP 5,6,7,8 - WC

1 6/8/2026 6/12/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation

6/8/2026 6/12/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

6/8/2026 6/12/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program

6/8/2026 6/12/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation WC 2026 BRQ

Prepared on 8/13/2024 1:48:31 PM 2 of 3

Site Inspection Activity Plan

6/21/2026 6/27/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance License Renewal-WC 71003 (Phase 3)

1 6/22/2026 6/26/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal Prepared on 8/13/2024 1:48:31 PM 3 of 3