Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedure & Forms
ML031970668
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/09/2003
From: Moles K
Wolf Creek
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
RA 03-0087
Download: ML031970668 (83)


Text

WOLF CREEK 'NUCLEAR OPERATING CORPORATION Kevin J. Moles Manager Regulatory Affairs JULO 9 2003 RA 03-0087 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms Gentlemen:

In accordance with 10 CFR 50, Appendix E, enclosed are revisions to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing procedures and forns. The following Is a list of the specific enclosures.

PROCEDURES Effective June 13, 2003 EPP 06-002, Revision 9 EPP 06-003, Revision 7 EPP 06-012, Revision 6 (Corrected Copy)

If you have any questions concerning this submittal, please contact me at (620) 364-4126 or Ms. Jennifer Yunk at (620) 364-4272.

Very truly yours, Kevin J. Mol KJM/rdg Enclosures P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Empoyer M/FJHCNVET

RA 03-0087 Page 2 of 2 cc: J. N. Donohew (NRC), wie D. N. Graves (NRC), wole T. P Gwynn (NRC), wle (2)

T. W. Pruett (NRC), wle Senior Emergency Preparedness Inspector (NRC), we Senior Resident Inspector (NRC), wole

CLEAR OPERATING CORPORATION EPP 06-002 TECHNICAL SUPPORT CENTER OPERATIONS Responsible Manager Superintendent Emergency Planning Revision Number 9 Use Category Reference Administrative Controls Procedure No Infrequently Performed Procedure No Program Number 06 DC2 06/13/03

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 1 of 32 TABLE OF CONTENTS SECTION TITLE PAGE 1.0 PURPOSE 2 2.0 SCOPE 2

3.0 REFERENCES

AND COMMITMENTS 2 4.0 DEFINITIONS 3 5.0 RESPONSIBILITIES 4 6.0 PRECAUTIONS/LIMITATIONS 5 7.0 PROCEDURE 6 7.1 Facility Activation 6 7.2 Facility Deactivation 6 7.3 Site Emergency Manager 7 7.4 TSC Operations Coordinator 9 7.5 TSC Administrative Coordinator 10 7.6 TSC Radiological Coordinator 11 7.7 TSC Facility Technician 12 7.8 Maintenance Coordinator 13 7.9 Engineering Coordinator 14 7.10 TSC Operations Recorder 14 7.11 TSC Administrative Assistant 15

7. 12 TSC Team Director 18 7.13 TSC Team Communicators 19 7.14 TSC Emergency Notification System (ENS) Communicator 19 7.15 Engineering Team 20 7.16 Emergency Response Team 20 7.17 Maintenance Assistant 20 7.18 Maintenance Planner 21 7.19 Warehouse Support 21 7.20 Security Coordinator 21 8.0 RECORDS 22 9.0 FORMS 22 ATTACEIMENT A HEPA FILTRATION AND IODINE MONITORING OPERATIONS 23 ATTACEIMENT B OSC RELOCATION SUPPLIES AND EQUIPMENT 25 ATTACHIMENT C TSC DIESEL OPERATIONS 26 ATTACHEMENT D EMERGENCY RESPONSE DATA SYSTEM (ERDS) OPERATIONS 29 ATTACHEMENT E POSITIONS REQUIRED FOR AUGMENTATION 30 ATTACHIMENT F FAX NUMBERS 31 FIGURE 1 TSC ORGANIZATION 32

IRevision:9 Reference Use TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Page 2 of 32 1.0 PURPOSE 1.1 This procedure provides guidelines for the activation of the Technical Support Center (TSC), and the responsibilities and guidance for Emergency Response Organization (ERO) personnel assigned to the TSC.

2.0 SCOPE 2.1 This procedure is implemented following the declaration of an Alert or higher emergency classification. The Shift Manager may request the Site Emergency Manager to activate the TSC during a Notification of Unusual Event.

2.2 This procedure provides direction for positions assigned to the Operations Support Center (OSC) also. Since the OSC is housed in the TSC, for the purpose of this procedure the OSC is part of the TSC.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 Code of Federal Regulations 10 CFR 20 3.1.2 RADIOLOGICAL EMERGENCY TELEPHONE DIRECTORY (RETD) 3.1.3 RADIOLOGICAL EMERGENCY RESPONSE PLAN (RERP) 3.1.4 PIR 2000-3534, TSC Diesel Generator failed to satisfy the requirements of STN KAT-001.

3.2 Commitments 3.2.1 Deleted 3.2.2 RCMS91-142, Failure to Establish and Maintain Habitability in the Emergency Response Facilities 3.2.3 RCMS92-188, Timely Notification of an Emergency and Timely Activation of the TSC and OSC 3.2.4 RCMS97-067, Maintain Priority Board Information Up-To-Date 3.2.5 RCMS97-066, DED To Inform Personnel Of Information Needed To Escalate Classification

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 3 of 32 4.0 DEFINITIONS 4.1 Callout 4.1.1 The methodology which is implemented to provide proper staffing of the ERO.

4.2 Emergency Action Levels (EALs) 4.2.1 Specific parameters or conditions that may be used as thresholds for declaring a particular emergency classification.

4.3 Emergency Classification 4.3.1 A system used to define the severity of emergencies into one of four categories based upon projected or confirmed emergency action levels. Classifications listed in order of increasing severity are as follows:

o Notification of Unusual Event o Alert o Site Area Emergency o General Emergency 4.4 Emergency Conditions 4.4.1 Situations occurring which cause or may threaten to cause radiological hazards affecting the health and safety of employees or the public, or which may result in damage to property.

4.5 Facility Activation 4.5.1 A facility is considered activated when the designated positions are present, the Emergency Manager determines the facility is ready to activate, and declares the facility activated.

4.6 Habitability 4.6.1 Habitable - Radiological / environmental conditions within the facility are not challenged. There are no stay time restrictions for environmental or radiological circumstances.

4.6.2 Degraded - Conditions within the facility do not meet normal facility conditions. This could be due to radiological, environmental, or equipment conditions which may cause some type of hardship for personnel working in the facility.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 4 of 32 4.7 Operations Support Center (OSC) 4.7.1 A staging area located in the TSC for emergency teams to support the emergency response effort.

4.8 Records 4.8.1 Documents such as calculation worksheets, computer printouts, forms, logs, memos, checklists, or any paper used to record data or information during an emergency, drill or exercise which may be used for event reconstruction.

4.9 Technical Support Center (TSC) 4.9.1 The TSC serves as a center outside of the Control Room that acts in support of the command-and-control function and houses the OSC organization. Plant status and diagnostic information are available at this location for use by technical and management personnel in support of control room command-and-control functions.

5.0 RESPONSIBILITIES 5.1 Site Emergency Manager 5.1.1 Coordinate and direct on-site emergency response.

5.1.2 Classify/terminate the emergency in accordance with the Emergency Action Levels (EALs).

5.1.3 Approve radiation exposure greater than the limits of 10CFR20 for on-site ERO personnel.

5.1.4 Establish priorities for accident mitigation and emergency repair.

5.1.5 Declare the TSC activated and establish priorities for TSC personnel.

5.1.6 Approve Emergency Notifications and Protective Action Recommendations until the EOF is activated.

5.2 TSC Operations Coordinator 5.2.1 Coordinate overall emergency response activities with the Control Room staff.

5.3 TSC Administrative Coordinator 5.3.1 Provide support for TSC personnel as needed and direction for the TSC Administrative Assistants.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 5 of 32 5.4 TSC Radiological Coordinator 5.4.1 Provide direction for radiological conditions associated with activities controlled by the TSC.

5.5 TSC Facility Technician 5.5.1 Perform radiological duties in the TSC as directed.

5.6 Maintenance Coordinator 5.6.1 Determine the need for and appoint members to Emergency Response Teams.

5.7 Engineering Coordinator 5.7.1 Directs the assessment and evaluation tasks of the Engineering Team.

6.0 PRECAUTIONS/LIMITATIONS 6.1 The assigned Site Emergency Manager will assume command-and-control functions and will be the top line manager responsible for the emergency until the EOF is activated. TSC activation will be performed as soon as practical and within the times as stated in the following: [Commitment Step 3.2.3]

6.1.1 During off-normal working hours, it is the goal to activate the TSC within 75 minutes of a declaration of an Alert or higher classification.

6.1.2 During normal working hours, it is the goal to activate the TSC within 30 minutes of a declaration of an Alert or higher classification.

6.2 Personnel entering the TSC may be required to perform a whole body frisk at a designated frisking station.

6.3 Teams dispatched from on-site locations may not require an HP Technician as part of the team. However, approval must be obtained from the TSC Radiological Coordinator prior to leaving for the initial and each additional destination.

6.4 Facility evacuation should be considered if there is an actual or projected dose greater than or equal to 5 REM TEDE, unless the Site Emergency Manager authorizes exposures up to 25 REM.

6.5 Personnel in the TSC may be directed to relocate to another suitable location in the event emergency conditions preclude activation or warrant evacuation of the TSC.

6.6 Emergency Response Data System (ERDS) must be activated within 60 minutes of a declaration of an Alert or higher emergency.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 6 of 32 7.0 PROCEDURE 7.1 Facility Activation 7.1.1 Upon notification of an Alert or higher emergency or at the discretion of the Shift Manager during an NUE, assigned ERO team members report to and establish TSC operations as follows:

1. Insert ACAD badge into TSC card reader for accountability.
2. Obtain the position name tag for the assigned position from the TSC or OSC Staffing Board.
3. Print name and ACAD badge number on the Staffing Board where the position badge was located.
4. Proceed to assigned work station and commence with position functions as directed by this procedure.

7.1.2 Personnel should log/record significant emergency response information.

7.1.3 The TSC may be activated when the following positions are present and the Site Emergency Manager determines the facility is ready to activate:

o Site Emergency Manager o TSC Operations Coordinator o TSC Administrative Coordinator o TSC Radiological Coordinator o Maintenance Coordinator 7.1.4 WHEN TSC equipment problems or failures are identified, THEN these problems or failures should be reported to the TSC Administrative Coordinator.

7.1.6 IF the TSC personnel are required to relocate, THEN refer to ATTACHMENT B, OSC RELOCATION SUPPLIES/EQUIPMENT, for a list of supplies to be considered for transport to the relocation area.

7.2 Facility Deactivation 7.2.1 The Site Emergency Manager should inform personnel in the TSC to deactivate.

IRevision:9 Reference Use TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Page 7 of 32 7.2.2 Each TSC position holder should transmit logs and any other documentation generated during the emergency to the TSC Administrative Coordinator.

7.2.3 The TSC Administrative Coordinator should transmit all documentation collected to Emergency Planning.

7.2.4 Each TSC position holder should evaluate the condition of equipment and supplies.

7.2.5 Each TSC position holder should return equipment and supplies to pre-activation status.

7.2.6 Each TSC position holder should report any deficiencies in facility equipment or supplies to the TSC Administrative Coordinator.

7.2.7 The TSC Administrative Coordinator should notify Emergency Planning of any damaged or missing facility equipment.

7.3 Site Emergency Manager 7.3.1 Obtain a turnover briefing from the Shift Manager.

EPF 06-002-01, EMERGENCY MANAGERS TURNOVER SHEET, may be used as an aid for this turnover.

7.3.2 Ensure the following positions have been filled and are ready for TSC activation: [Commitment Step 3.2.3]

o TSC Operations Coordinator o TSC Administrative Coordinator o TSC Radiological Coordinator o Maintenance Coordinator

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 8 of 32 CAUTIONS The following responsibilities are those of the Emergency Managers and may NOT be delegated. These responsibilities may be divided between the Site and Off-site Emergency Managers:

o Emergency Classification o Protective action recommendations o Authorization for notification of off-site authorities o Authorization of Emergency Exposures on-site in excess of 10CFR20 Limits 7.3.3 Assume command-and-control of site emergency response activities from the Shift Manager.

1. IF the EOF is not activated, THEN assume the Notification and Protective Action Recommendations duties until the EOF is activated.
2. Inform the staff in the TSC you have assumed command-and-control and that the TSC is declared activated.
3. Direct the TSC Administrative Coordinator to make a plant announcement that the TSC is activated and the name of the Site Emergency Manager.

7.3.4 Conduct initial and periodic briefings for the TSC staff focusing upon the highest priority items and key parameters which are likely to lead to an escalated emergency classification. [Commitment Step 3.2.5]

7.3.5 Assess plant conditions and evaluate the need to reclassify the emergency in accordance with EPP 06-005, EMERGENCY CLASSIFICATION.

1. Direct the Control Room to make appropriate plant announcements for changing classifications.
2. Direct the Control Room to initiate callout as necessary for the declared emergency.

7.3.6 Coordinate with the TSC Radiological Coordinator on the need to authorize exposure limits in excess of 10CFR20 limits, with NRC concurrence if practical, and the need to recommend ingestion of potassium iodide (KI).

7.3.7 Evaluate and authorize radiation exposure levels for site personnel.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 9 of 32

1. Approve exposures exceeding 2 REM (TEDE).
2. Approve exposures in excess of 10 CFR 20 limits.

7.3.8 Ensure the Shift Manager is updated with status changes and decisions as they happen.

7.3.9 Coordinate shift relief for Control Room and TSC personnel with the EOF.

7.3.10 IF downgrading or terminating an emergency, THEN perform in accordance with EPP 06-008, RECOVERY OPERATIONS.

7.4 TSC Operations Coordinator 7.4.1 Ensure the normal power supply to the TSC is available.

IF unavailable, THEN ensure the Diesel Generator is started in accordance with ATTACHMENT C, TSC DIESEL OPERATIONS.

7.4.2 Ensure the facility clock is synchronized with the Control Room clock.

7.4.3 Post the appropriate Emergency Classification sign.

7.4.4 Inform the Site Emergency Manager of readiness for TSC activation.

7.4.5 Coordinate overall emergency response activities with the Control Room staff.

7.4.6 IF a radioactive release is in progress or imminent, THEN ensure HEPA Filtration and the Iodine Monitor are placed in service in accordance with ATTACHMENT A, HEPA FILTRATION AND IODINE MONITORING STARTUP.

NOTE Emergency Response Data System (ERDS) must be activated within 60 minutes of the declaration of an Alert or higher emergency.

7.4.7 Ensure the Emergency Response Data System (ERDS) has been activated.

1. Instructions for initiating ERDS activation are contained in ATTACHMENT D, EMERGENCY RESPONSE DATA SYSTEM (ERDS) OPERATIONS.

7.4.8 Monitor plant conditions for changes which could affect the emergency classification and notify the Site Emergency Manager of the conditions.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 10 of 32 7.4.9 Evaluate actual or potential radiological releases based on plant conditions. Discuss evaluation with the Site Emergency Manager and TSC Radiological Coordinator.

7.5 TSC Administrative Coordinator 7.5.1 Ensure the Control Room is contacted for status of notifications.

7.5.2 Notify the Site Emergency Manager of readiness for TSC activation.

7.5.3 Ensure TSC accountability is being performed and maintained.

7.5.4 Ensure the State and County are notified that the TSC is activated and that the Site Emergency Manager has assumed command-and-control of the emergency.

7.5.5 Ensure Immediate and Follow-up Notifications are performed in accordance with EPP 06-007, EMERGENCY NOTIFICATIONS.

CAUTION Augmentation must be completed within 60 minutes of the time an Alert or higher emergency has been declared.

7.5.6 Ensure site augmentation has been met. Refer to Attachment E, POSITIONS REQUIRED FOR AUGMENTATION, for augmentation requirements. Call out additional persons as necessary to complete augmentation.

7.5.7 Ensure initial TSC staffing is adequate. IF staffing is not adequate, THEN call out additional personnel.

o For off-hours activation use the ADS report OR the NRECs report to evaluate staffing.

7.5.8 Make arrangements for shift relief and meals.

7.5.9 Ensure the TSC Administrative Assistants are briefed on Site Emergency Manager's updates and emergency status.

7.5.10 Ensure the Security Shift Lieutenant is briefed on plant and radiological conditions that may impact Security operations.

7.5.11 IF a Site Area or General Emergency has been declared, THEN determine from the Security Shift Lieutenant the status of an Exclusion Area Boundary evacuation.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 11 of 32 7.6 TSC Radiological Coordinator 7.6.1 Obtain current radiological status and Protective Action Recommendations made.

7.6.2 Ensure the TSC Facility Technician and one other person to make a team are available. [Commitment Step 3.2.3]

7.6.3 Ensure facility habitability has been established.

7.6.4 Notify the Site Emergency Manager of readiness for facility activation.

7.6.5 Ensure dosimetry devices are placed in the facility or issued to personnel as appropriate in accordance with EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION.

7.6.6 Ensure the Site Emergency Manager is briefed on radiological status for the development of Protective Action Recommendations.

7.6.7 Initiate surveys in accordance with EPP 06-011, EMERGENCY TEAM FORMATION AND CONTROL.

7.6.8 WHEN a Site Area or General Emergency has been declared, THEN direct the west entrance into the TSC be closed and signs posted to prevent entry through that entrance.

7.6.9 Provide the Site Emergency Manager with an evaluation of the conditions potentially requiring personnel exposure in excess of 10 CFR 20 limits.

o IF time permits, THEN initiate EPF 06-013-01, EMERGENCY EXPOSURE AUTHORIZATION.

7.6.10 For actual or projected doses perform the following:

1. IF an actual or projected dose in the facility is 5 REM TEDE, THEN inform the Site Emergency Manager of the need to evacuate the facility. [Commitment Step 3.2.2]
2. IF projected thyroid dose is greater than or equal to 25 REM, THEN recommend the ingestion of KI in accordance with EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION.

7.6.11 Ensure Emergency Response Teams are informed of changing plant conditions, emergency classifications and protective action recommendations which may affect the team's ability to complete assigned activities.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 12 of 32 7.6.12 Complete the Plant Status and Radiological Conditions sections on EPF 06-011-01, PLANT TEAM BRIEFING CHECKLIST. Provide radiological information to the TSC Team Director to be used for Plant Team briefs.

7.6.13 IF off-site medical assistance is needed, THEN ensure Health Physics support requirements are met.

7.6.14 Assist in personnel evacuation by performing the following:

1. Dispatch an HP Technician to the Security Building to establish radiological control and conduct personnel monitoring, if required.
2. Inform Security Shift Lieutenant of appropriate radiological plant data and direction of the plume for dissemination to evacuating personnel.

7.7 TSC Facility Technician 7.7.1 Establish and maintain facility habitability.

1. Ensure all AIR LOCK DOORS are closed.

[Commitment Step 3.2.2]

2. Position a frisker in the facility for habitability monitoring. IF the frisker alarms, THEN take an air sample of the TSC.

o Lead bricks are available for shielding.

o IF readings greater than 100 cpm above background on the general area frisker or greater than background on the General Atomics iodine monitor are noted, THEN an air sample will be taken in accordance with RPP 02-210, RADIATION SURVEY METHODS.

3. Take responsibility for the iodine monitor and perform the following:
a. Change the iodine monitor filters before the unit is placed in operation. Log the flow rate in the Facility Technician log.
b. Check the Ventilation Iodine Monitor hourly for proper operation and log the cpm reading in the Facility Technician log.
c. IF the iodine monitor is inoperable during HEPA filter operation, THEN initiate portable iodine sampling at least hourly in accordance with RPP 02-210, RADIATION SURVEY METHODS.
4. Record the Area Radiation Monitor mR/hr reading in the Facility Technician log.

o IF the area radiation monitor exceeds 20 mR/hr, THEN notify the TSC Radiological Coordinator.

7.7.2 Inform the TSC Radiological Coordinator of all facility habitability surveys.

7.7.3 Identify and label inoperable equipment.

7.7.4 Ensure 10 sets of 0-500 mR and 0-5 R dosimeters are functional and ready for use.

7.7.5 Determine dose margin and respirator qualifications of personnel assigned to Emergency Response Teams.

7.7.76 Ensure the logging in and analysis of all incoming radiological samples.

7.7.7 Review and document dosimetry results of emergency response activities in accordance with EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION.

7.7.8 Discuss the decontamination of on-site personnel with the TSC Radiological Coordinator.

1. Perform decontamination in accordance with RPP 02-310, PERSONNEL DECONTAMINATION.
2. Collect all RPP forms associated with the decontamination activity.

7.8 Maintenarice Coordinator 7.8.1 Verify personnel are present and ready to perform Emergency Response Team tasks. [Comunitment Step 3.2.3]

7.8.2 Provide the Site Emergency Manager with an assessment of pre-emergency maintenance activities.

7.8.3 Coordinate with the Site Emergency Manager to determine what information to list on the Priority Board and maintain the board up-to-date. [Commitment Step 3.2.4]

7.8.4 Obtain the status of and evaluate teams dispatched by the Control Room from the TSC Operations Recorder.

7.8.5 Direct the Maintenance Planners to develop a repair plan for equipment repair.

7.8.6 Determine the scope of Emergency Response Team activities to be performed.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 14 of 32 7.8.7 Initiate EPF 06-011-01, PLANT TEAM BRIEFING CHECKLIST, and coordinate with Maintenance Assistant on field team assignment.

7.8.8 Advise the Site Emergency Manager of Emergency Response Team status.

7.8.9 IF requested, THEN provide the key to the lock box located in the kit room. The key is located in your procedure binder.

7.9 Engineering Coordinator 7.9.1 Coordinate and direct the efforts of the Engineering Team to technically assess plant status and the severity of the emergency conditions.

7.9.2 Direct accident assessment and mitigation activities to be performed in accordance with EPP 06-016, ACCIDENT ASSESSMENT AND MITIGATION.

7.9.3 Advise the TSC Operations Coordinator on technical matters relating to fuel integrity, plant systems, equipment, and instrumentation.

7.9.4 Support maintenance items assigned to Emergency Response Teams.

7.9.5 IF requested, THEN provide the key to the lock box located in the kit room. The key is located in your procedure binder.

7.10 TSC Operations Recorder 7.10.1 Ensure NPIS is operable by verifying time and date in the upper right-hand corner are updating.

NOTES o The Operations Status Board has a goal of being updated at 15 minute intervals.

7.10.2 Maintain the Operations Status Board current by using NPIS Turn-On-Codes SB1 and SB2 OR with data obtained from the Operations Communicator on EPF 06-002-02, OPERATIONS STATUS.

1. Maintain a hard-copy of the NPIS printouts or completed EPF 06-002-02, OPERATIONS STATUS.

7.10.3 Monitor plant status for adverse trends and inform the TSC Operations Coordinator of changes in plant status which could affect the emergency classification.

7.10.4 Track procedure progress, list the procedure being performed by the Control Room.

7.10.5 WHEN transitions are made to the next procedure, THEN notify the TSC Operations Coordinator.

7.10.6 Communicate information, concerning emergency teams dispatched from the Control Room, directly to the TSC Maintenance Coordinator.

7.11 TSC Administrative Assistant 7.11.1 Ensure the operability of phones and radios to be used for County and State notifications. Conduct an initial radio check with Coffey County and the State of Kansas.

7.11.2 Ensure the verification phone is plugged in and operable by checking for a dial tone.

1. The verification phone should only be answered in this facility when it is activated and responsible for notifications.

NOTE Accountability must be completed within 30 minutes from the time the Site Evacuation Alarm is sounded.

7.11.3 Maintain TSC accountability by performing the following:

1. Maintain EPF 06-010-01, ACCOUNTABILITY LOG, OR ensure personnel entering or leaving the TSC use the card reader for tracking all persons not assigned to an Emergency Response Team.
a. Coordinate with the Security Coordinator to obtain accountability reports.
2. Ensure personnel entering and exiting the TSC close the airlock door. [Commitment Step 3.2.2]
3. Monitor the staffing boards for positions not filled and inform the Administrative Coordinator of these positions.
4. WHEN informed that access is being denied to the west entrance of the TSC, THEN ensure the airlock door is closed and relocate to an area appropriate to maintain accountability of the TSC.

7.11.4 Provide assistance to the Site Emergency Manager by performing the following:

1. Maintain EPF 06-002-03, SEQUENCE OF EVENTS, log.

The following are examples of items that should be recorded in the log:

o Time of classifications o Time PARs are made o Time protective actions are implemented o Time protective actions are completed o Time events in the plant happened o Time accountability was completed o Time augmentation was determined complete o Anything the Manager determines important

2. Answer the phone as needed.
3. Provide log keeping assistance for the Site Emergency Manager as directed.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 17 of 32 NOTE Distribution of documents should be to the maroon baskets titled with the appropriate position.

7.11.5 Perform faxing, copying, and distribution as requested.

Use a Fax coversheet for each Fax sent. FAX numbers are listed in ATTACHMENT F, FAX NUMBERS. Perform distribution of the listed documents as follows:

1. EPF 06-007-01, WOLF CREEK GENERATING STATION EMERGENCY NOTIFICATION, to the following:

o Topeka Information Clearinghouse o State of Kansas Public Information Officer o Coffey County EOC o Site Emergency Manager o Administrative Coordinator o Nuclear Regulatory Commission (NRC) o Emergency Notification System (ENS) Communicator o Onsite Public Information Coordinator o EOF.

2. EPF 06-002-03, SEQUENCE OF EVENTS, to the EOF
3. Operations and Radiological Status Boards information to the following:

o Onsite Public Information Coordinator o Emergency Notification System (ENS) Communicator 7.11.6 Provide Off-site communications by performing the following:

1. Contact the Control Room Off-site Communicator to verify the status of notifications.

o Verify the code word, type and time of all notifications and any communication problems o Request faxes of all prior notifications.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 18 of 32

2. IF requested by the Administrative Coordinator, THEN notify Coffey County and the State of Kansas that the TSC is activated. Provide the name of the Site Emergency Manager who has assumed command-and-control and the time of activation.
3. Verify that all information has been completed on Notification forms prior to transmitting.
4. Perform Emergency Notifications in accordance with EPP 06-007, EMERGENCY NOTIFICATIONS.
5. Conduct calls for off-site support as directed by the TSC Administrative Coordinator.
a. Unless the call for off-site support is to obtain assistance for a life threatening situation, do not interrupt the Immediate Notifications. Such calls shall be made coincidentally with Immediate Notifications.
b. Calls for immediate off-site support take precedence over Follow-up Notifications.
c. Provide to Security the names of people coming to the site, the time they are expected and any other information to assist in getting the off-site support through Main Gate North.

7.12 TSC Team Director 7.12.1 Assume control of all teams dispatched from the Control Room except on-shift Nuclear Station Operators.

1. On-shift Nuclear Station Operators remain under Control Room control and are not assigned a team identifier.

7.12.2 Assign each Emergency Response Team with a team identifier.

7.12.3 Inform the TSC Team Communicator of the formation of Emergency Response Teams.

7.12.4 Evaluate the need for Health Physics support for all dispatched teams.

1. Health Physics Technicians will provide the necessary radiological guidance for the task which the team will perform.
2. Health Physics Technicians should provide status updates to the Radiological Coordinator during the time the team is in the field.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 19 of 32 7.12.5 Coordinate with the Maintenance Assistant to complete a brief for Emergency Response Teams.

1. Consider areas to evacuate to, stay times, and possible hazards the team may encounter while performing their task.

7.13 TSC Team Communicators 7.13.1 Ensure that the radio is turned on and selected to the correct channel.

7.13.2 Establish and maintain communications with site Emergency Response Teams.

7.13.3 Verify team identification and membership when Emergency Response Teams establish radio communications.

7.13.4 Inform the teams of changes to plant status and emergency classifications.

7.13.5 Ensure all pertinent directions to the teams from the TSC Team Director are logged.

7.14 TSC Emergency Notification System (ENS) Communicator 7.14.1 Inform the TSC Operations Coordinator that ENS communications are ready to be established.

7.14.2 Establish and maintain continuous communications with the NRC via the ENS Emergency Telecommunications System (ETS) telephone. IF the NRC determines that continuous communications or contact with all facilities is not necessary, THEN communications may be terminated as directed by the NRC.

1. Use of the ETS phone is in accordance with EPP 06-007, EMERGENCY NOTIFICATIONS.

7.14.3 Provide the following information to the NRC:

o Any further degradation in the level of safety of the plant or other worsening plant conditions o The results of ensuing evaluations or assessments of plant conditions o The effectiveness of response or protective measures taken o Any information related to plant behavior that is not understood

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 20 of 32 7.15 Engineering Team 7.15.1 The Engineering Team should monitor NPIS primary plant display for adverse trends.

7.15.2 The Engineering Team should assist with trouble-shooting and restoration of equipment.

7.15.3 The Engineering Team should monitor on-site and off-site electric distribution and sources.

7.15.4 The Engineering Team should assess plant status and the severity of the emergency conditions in accordance with EPP 06-016, ACCIDENT ASSESSMENT AND MITIGATION.

7.15.5 Nuclear Engineer should assess the degree of fuel damage in accordance with EPP 06-017, CORE DAMAGE ASSESSMENT METHODOLOGY.

7.16 Emergency Response Team 7.16.1 Sign your name and position on the Task Board.

7.16.2 Obtain Protective clothing and stage in bag for readiness.

7.16.3 Obtain most recent dose update and respirator qualifications.

7.16.4 Perform operability checks on equipment and instruments before leaving the TSC.

7.16.5 WHEN Chemistry Technicians perform chemical sampling, THEN provide analysis results to the TSC Radiological Coordinator.

7.16.6 Immediately report major anomalies encountered in the plant to the TSC Team Communicator.

7.16.7 Upon return to the TSC, report any anomalies to the TSC Team Director.

7.16.8 Track Emergency Response Team exposure in accordance with EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION.

7.16.9 Team formation and control is in accordance with EPP 06-011, EMERGENCY RESPONSE TEAM FORMATION AND CONTROL.

7.17 Maintenance Assistant 7.17.1 Assign personnel to Emergency Response Teams for equipment repair, surveys, or search and rescue.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 21 of 32 7.17.2 Coordinate with the TSC Team Director and brief Emergency Response Teams on team objectives.

1. Complete EPF 06-011-01, PLANT TEAM BRIEFING CHECKLIST.

7.17.3 IF the team has a search and rescue mission, THEN include the following information in the briefing:

o Number and last known location(s) of missing individual(s) o Possible physical condition of missing individual (s) 7.17.4 Brief the Maintenance Coordinator on the status of Emergency Response Teams.

7.17.5 Consider the necessity of conducting additional briefings of teams dispatched to additional locations once the team has left the TSC.

7.17.6 Debrief Emergency Response Teams in accordance with EPP 06-011, EMERGENCY TEAM FORMATION AND CONTROL.

7.18 Maintenance Planner 7.18.1 Assist in the briefing of Emergency Response Teams and provide maintenance support as appropriate to the Maintenance Coordinator.

7.18.2 Develop repair plans for equipment repairs as directed.

7.19 Warehouse Support 7.19.1 Locate and secure parts and equipment from the warehouse as directed.

7.20 Security Coordinator 7.20.1 Ensure the safety of Security personnel is maintained by coordinating Security activities with activities of the TSC.

7.20.2 Provide coordination of activities including, but not limited to the following:

o Emergency vehicle arrival o Search and rescue outside the PAB o Access to vital areas o EMT support

j Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 22 of 32 o Activities concerning Security 8.0 RECORDS 8.1 Records generated by this procedure during an actual emergency are considered lifetime QA records and shall be forwarded to Emergency Planning at the termination of the emergency.

8.2 Records generated by this procedure during drills or exercises are considered non-QA records and shall be forwarded to Emergency Planning at the termination of the drill or exercise.

9.0 FORMS 9.1 EPF 06-002-01, EMERGENCY MANAGER TURNOVER SHEET 9.2 EPF 06-002-02, OPERATIONS STATUS 9.3 EPF 06-002-03, SEQUENCE OF EVENTS

- END -

ATTACHMENT A (Page 1 of 2)

HEPA FILTRATION AND IODINE MONITORING OPERATIONS NOTES o The HEPA filtration startup panels are located in the northwest corner of the TSC Equipment Room.

o The air handling heater switch is located on top of the HEPA unit directly in front of the Iodine Monitoring Control Panel.

A.1 HEPA FILTRATION STARTUP INSTRUCTIONS A.1.1 On Panel PB-1, Toggle the FILTER/NORMAL switch to FILTER.

1. Verify dampers D-1 and D-2 closed status lights indicate CLOSED.
2. Verify damper D-3 open status light indicates OPEN.
3. IF dampers D-1 and D-2 fail to close or D-3 fails to open, THEN use manual damper controls located in the ductwork to position the dampers. Damper D-1 is located in Janitor Supply Room. Dampers D-2 and D-3 are located in the TSC Equipment Room in the overhead above the Iodine Monitor.

A.1.2 On Disconnect Box next to Panel PB-1, turn HEPA filtration FAN SWITCH to HAND position to start fan.

A.1.3 Turn air handling heater to ON.

A.2 IODINE MONITORING STARTUP INSTRUCTIONS A.2.1 Ensure the Facility Technician has changed the filters prior to starting the iodine monitor and logged the flow rate in the Facility Technician log.

A.2.2 Ensure "PWR ON" indicator is lit.

A.2.3 Close Purge valve.

A.2.4 Verify inlet valve is throttled open.

A.2.5 Press and hold START button.

1. Verify green "ON" light comes on.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 24 of 32 ATTACHMENT A (Page 2 of 2)

HEPA FILTRATION AND IODINE MONITORING OPERATIONS

2. IF vacuum is not between 3" and 10" Hg on the vacuum gauge, THEN adjust the inlet valve to obtain between 3" to 10" Hg on the vacuum gauge.
3. WHEN vacuum is between 3" to 10" Hg on the gauge, THEN release the "START" button.

A.2. 6 Verify LIMIT light is extinguished.

A.2. 7 Verify air flow is between 1.8 and 2.2 cfm.

A.3 HEPA FILTRATION SHUTDOWN INSTRUCTIONS A.3.1 Turn air handling heater to OFF.

A.3.2 On Disconnect Box next to Panel PB-1, turn HEPA filtration FAN SWITCH to OFF position to secure fan.

A.3.3 On Panel PB-1, Toggle the FILTER/NORMAL switch to NORMAL.

1. Verify dampers D-1 and D-2 status lights indicate OPEN.
2. Verify damper D-3 status light indicates CLOSED.
3. IF damper D-1 fails to open, THEN ensure exhaust fan EXF-l located in Janitor Supply Room is running.
4. IF damper D-2 fails to open or damper D-3 fails to close, THEN use manual damper controls located in the ductwork to position the dampers. Dampers D-2 and D-3 are located in the TSC Equipment Room in the overhead above the Iodine Monitor.

A.4 IODINE MONITORING SHUTDOWN INSTRUCTIONS A. 4. 1 Ensure the Facility Technician has logged the flow rate in the Facility Technician log.

A.4.2 Secure the monitor by pushing and releasing the STOP button.

- END -

ATTACHMENT B (Page 1 of 1)

OSC RELOCATION SUPPLIES AND EQUIPMENT B.1 Air Samplers, Friskers, and Survey Meters for Portable Survey Instruments B.2 TLDs, SRD (PICs), Issue Logs, and Dosimeter Chargers for Personnel Dosimetry B.3 Emergency Procedures/Forms B.4 Protective Clothing and Tape B.5 Decontamination Kit B.6 First Aid and Medical Response Kits B.7 Communication Equipment B.8 Step Off Pads, Radiation Signal Ropes and Signs for Radiation Control Area Supplies B.9 SCBA and Full Face (spare cartridges) Respiratory Protection B.10 Zeolite Cartridges, Smears, and A/S Filters for Health Physics Survey Supplies B.11 KI Tablets B.12 Office Supplies, Flashlights, and Batteries

- END -

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 26 of 32 ATTACHMENT C (Page 1 of 3)

TSC DIESEL OPERATIONS C.1 IF the normal power supply to the TSC is not available, THEN ensure the TSC diesel generator is started as follows:

C.1.1 Ensure EMERG GENERATOR INTAKE DAMPER D6 is OPEN OR that the damper actuator arm is loosened allow the damper to fall open.

NOTES o To prevent permanent cranking motor damage, do not crank the diesel for more than thirty seconds continuously. If the diesel does not start within the first thirty seconds, wait one to two minutes before re-cranking.

o Frequency requirements apply only during steady-state conditions with the diesel under a constant load.

C.1.2 At the Diesel Control Panel, start the diesel generator by placing the MANUAL START toggle switch to the PERMISSIVE START position.

1. Verify the following parameters: (Reference 3.1.4) o Oil Pressure GREATER THAN 50 psig o Voltage 450 to 500 volts (all phases) o Frequency 58.8 Hz to 61.2 Hz C.1.3 At the Main Distribution Panel, place breakers for circuits 1 through 14 OFF.

C.1.4 At the MANUAL TRANSFER SWITCH, place the MAIN breaker to OFF.

C.1.5 At the MANUAL TRANSFER SWITCH, place the D/GEN breaker to ON.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 27 of 32 ATTACHMENT C (Page 2 of 3)

TSC DIESEL OPERATIONS NOTES o Allow several seconds for generator load to stabilize before placing the next breaker to the ON position.

o Machine voltage may be adjusted as necessary by use of rheostat adjacent to the diesel generator field breaker located on the D/G.

o Diesel generator coolant temperature should be greater than or equal to 120 F prior to loading the diesel generator.

C.1.6 At the Main Distribution Panel, place breakers 1 through 14 to ON.

NOTE Frequency requirements apply only during steady-state conditions with the diesel under a constant load.

C.1.7 WHEN the diesel is operating under load, THEN the following parameters should be maintained.

(Reference 3.1.4) o Oil Pressure GREATER THAN 50 psig o Voltage 450 to 500 volts (all phases) o Frequency 58.8 Hz to 61.2 Hz C.2 IF the TSC Diesel Generator is no longer needed, THEN shutdown the diesel generator as follows:

C.2.1 At the Main Distribution Panel, place breakers for circuits 1 through 14 OFF.

C.2.2 At the MANUAL TRANSFER SWITCH, place the D/GEN breaker to OFF.

C.2.3 At the MANUAL TRANSFER SWITCH, place the MAIN breaker to ON.

C.2.4 At the Main Distribution Panel, place breakers for circuits 1 through 14 to ON.

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 28 of 32 ATTACHMENT C (Page 3 of 3)

TSC DIESEL OPERATIONS NOTE The Diesel should be allowed to run unloaded for 3 to 5 minutes to cool down.

C.2.5 At the Diesel Control Panel, stop the diesel by placing the MANUAL START toggle switch to OFF.

C.2.6 Ensure the EMERG. GENERATOR INTAKE DAMPER D6 is closed.

C.2.7 Notify the Control Room to perform STN KAT-001, TECHNICAL SUPPORT CENTER DIESEL GENERATOR OPERATION, to ensure the diesel is ready for operation.

- END -

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 29 of 32 ATTACHMENT D (Page 1 of 1)

EMERGENCY RESPONSE DATA SYSTEM (ERDS) OPERATIONS D.1 ERDS Activation D.1.1 In the TSC computer room, perform one of the following using the NPIS Computer:

o Select the E-Plan Menu, then touch the ERDS block on the screen OR o Type the Turn-On code "1ERDS" and press the "Return/Enter" key D.1.2 Follow the prompts until the ERDS is activated.

D.1.3 Notify the TSC Operations Coordinator that ERDS is activated.

D .2 ERDS Deactivation D.2.1 IF directed by the NRC to deactivate ERDS, THEN press "F3" key and follow the prompts.

- END -

ATTACHMENT E (Page 1 of 1)

POSITIONS REQUIRED FOR AUGMENTATION E.1 Augmentation E.1.1 The following 25 positions are required to be filled within 60 minutes of the determination that augmentation is needed:

1 Radiological Coordinator 1 Chemistry Technician 1 Nuclear Engineer 1 Electrical Engineer 1 Mechanical Engineer 1 I&C Technician 2 Mechanical Maintenance 2 Electrical Maintenance 3 Communicators (Any combination from Administrative Assistant, ENS, or HPN positions to make three) 4 Off-site Health Physics Technicians 8 On-site Health Physics Technicians E.1.2 The following 5 positions are required to be filled within 90 minutes of the determination that augmentation is needed:

1 Off-site Emergency Manager 1 Operations Coordinator 1 Radiological Coordinator 1 Administrative Coordinator 1 Facility Technician

- END -

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 31 of 32 ATTACHMENT F (Page 1 of 1)

FAX NUMBERS F.1 FAX to the desired location by using the appropriate number from the table below.

LOCATION WHEN FAX VERIFICATION Coffey County Prior to County 364-5758 364-2123 Dispatcher EOC activation:

Coffey County After County EOC 364-8643 364-2721 EOC activation:

State of Kansas (785) 274-1487 (785) 296-3176 (785) 274-1422 (785) 274-1425 OR

_________________ State Radio State of Kansas (785) 274-1622 (785) 274-1192 PIO NRC Resident 364-8735 Ext. 4575 Inspector Topeka System (785) 575-6010 (785) 575-6078 Dispatch ANI (860) 561-4655 (860) 561-3433 INPO (770) 644-8549 (800) 321-0614 EOF Ext. 5101 Ext. 5100 TSC Ext. 4051 Ext. 4053 Information Prior to (785) 274-1622 (785) 274-1190 Clearinghouse - activation:

Topeka After (785) 267-0742 (785) 267-0603 activation:

- END -

Revision: 9 TECHNICAL SUPPORT CENTER OPERATIONS EPP 06-002 Reference Use Page 32 of 32 FIGURE 1 l TSC ORGANIZATION I

W4LF CREEK NUCLEAR OPERATING CORPORATION EPP 06-003 EMERGENCY OPERATIONS FACILITY OPERATIONS Responsible Manager Superintendent Emergency Planning Revision Number 7 Use Category Reference Administrative Controls Procedure No Infrequently Performed Procedure No Program Number 06 DC2 06/13/03

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 1 of 28 TABLE OF CONTENTS SECTION TITLE PAGE 1.0 PURPOSE 2 2.0 SCOPE 2

3.0 REFERENCES

AND COMMITMENTS 2 4.0 DEFINITIONS 3 5.0 RESPONSIBILITIES 4 6.0 PRECAUTIONS/LIMITATIONS 5 7.0 PROCEDURE 6 7.1 EOF Activation 6 7.2 EOF Deactivation 6 7.3 Off-site Emergency Manager 7 7.4 EOF Operations Coordinator 9 7.5 EOF Administrative Coordinator 10 7.6 EOF Radiological Coordinator 10 7.7 EOF Facility Technician 12 7.8 Dose Assessment Coordinator 13 7.9 Dose Assessment Technician 13 7.10 EOF Operations Recorder 14 7.11 EOF Administrative Assistant 14 7.12 EOF Team Director 17 7.13 EOF Team Communicator 17

1 .7.14 HPN Communicator 18 7.15 Survey Team Technician 18 7.16 Representative at County 19 8.0 RECORDS 19 9.0 FORMS 19 ATTACHMENT A ALTERNATE EOF OPERATIONS 20 ATTACHMENT B EOF DIESEL OPERATION 23 ATTACHMENT C HEPA FILTRATION AND IODINE MONITORING OPERATION 25 ATTACHMENT D FAX NUMBERS 27 FIGURE 1 EMERGENCY OPERATIONS FACILITY ORGANIZATION 28

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 2 of 28 1.0 PURPOSE 1.1 This procedure describes responsibilities and provides guidance for Emergency Response Organization (ERO) personnel, located in the Emergency Operations Facility (EOF), for the activation of the EOF following the declaration of an Alert, Site Area Emergency, General Emergency.

2.0 SCOPE 2.1 This procedure provides direction for ERO positions required to activate and staff the EOF and the Alternate EOF.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 Code of Federal Regulations 10CFR20 3.1.2 Code of Federal Regulations 10CFR50 3.1.3 Kansas State Emergency Operations Plan, Appendix 12 to Annex N.

3.1.4 Letter CO 94-0024, Request for Alternate Emergency Operations Center Information, Docket No. 50-482 3.1.5 PIR TE 91-0676, QA Surveillance TE: 53359 S-1892, Radiological Status Board not Updated to Show Which Protective Action Recommendations were Completed.

3.1.6 PIR 2000-3534, TSC Diesel Generator failed to satisfy the requirements of STN KAT-001.

3.2 Commitments 3.2.1 ITIP 01963, NRC Information Notice 92-32, Problems Identified With Emergency Ventilation Systems For Near Site (Within 10 Miles) Emergency Operations Facilities And Technical Support Centers.

3.2.2 Deleted 3.2.3 PIR TE 91-0715, Failure to Establish and Maintain Habitability in the Emergency Response Facilities.

3.2.4 RCMS Number 91-142, Letter WM 91-0145, Closure of air lock door, NRC Inspection Report 91-19.

3.2.5 RCMS Number 92-188, Letter WM 92-0179, Restructure assignment of responsibilities on activation checklists, NRC Inspection Report Weakness 9214-01

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 3 of 28 4.0 DEFINITIONS 4.1 Alternate Emergency Operations Facility 4.1.1 The alternate EOF is located in Emporia, Kansas at the KPL District Office, 210 E. 2nd Street. The alternate EOF is where management of the overall Wolf Creek Generating Station (WCGS) emergency response will be conducted if the primary EOF has been evacuated.

4.2 Callout 4.2.1 The methodology which is implemented to provide proper staffing of the ERO.

4.3 Emergency Action Levels (EALs) 4.3.1 Specific parameters or conditions that may be used as thresholds for declaring a particular emergency classification.

4.4 Emergency Classification 4.4.1 A system used to define the severity of emergencies into one of four categories based upon projected or confirmed emergency action levels. Classifications listed in order of increasing severity are as follows:

o Notification of Unusual Event o Alert o Site Area Emergency o General Emergency 4.5 Emergency Conditions 4.5.1 Situations occurring which cause or may threaten to cause radiological hazards affecting the health and safety of employees or the public, or which may result in damage to property.

4.6 Emergency Operations Facility (EOF) 4.6.1 The organization represented by FIGURE 1, EMERGENCY OPERATIONS FACILITY ORGANIZATION. The EOF is the near-site emergency response facility from which the management of the overall Wolf Creek Generating Station (WCGS) emergency response is conducted. The EOF is located 2.8 miles northwest of WCGS.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 4 of 28 4.7 Facility Activation 4.7.1 A facility is considered activated when the designated positions are ready to assume the responsibilities assigned to that position and the facility is declared activated.

4.8 Habitability 4.8.1 Habitable - Radiological / environmental conditions within the facility are not challenged. There are no stay time restrictions for environmental or radiological circumstances.

4.8.2 Degraded - Conditions within the facility do not meet normal facility conditions. This could be due to radiological, environmental, or equipment conditions which may cause some type of hardship for personnel working in the facility.

4.9 Operations Support Center (OSC) 4.9.1 A staging area located in the TSC for emergency teams to support the emergency response effort.

4.10 Records 4.10.1 Documents such as calculation worksheets, computer printouts, forms, logs, memos, checklists, or any paper used to record data or information during an emergency, drill or exercise which may be used for event reconstruction.

5.0 RESPONSIBILITIES 5.1 Off-site Emergency Manager 5.1.1 Coordinate and direct off-site emergency response.

5.1.2 Approve radiation exposure greater than the limits of 10CFR20 for off-site ERO personnel.

5.1.3 Direct off-site protective actions.

5.1.4 Declare the EOF activated and establish priorities for EOF personnel.

5.1.5 Approve Protective Action Recommendations.

5.1.6 Approve emergency notifications S. 1. 7 Has authority to supplement or reduce staff.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 5 of 28 5.2 EOF Administrative Coordinator 5.2.1 Provide administrative support for the facility.

5.3 EOF Facility Technician 5.3.1 Establish and monitor facility habitability.

5.4 EOF Radiological Coordinator 5.4.1 Provide direction for radiological conditions associated with activities controlled by the EOF.

5.5 EOF Operations Coordinator 5.5.1 Monitors on site emergency response activities.

6.0 PRECAUTIONS/LIMITATIONS 6.1 Facility evacuation should be considered anytime conditions in the facility would impede the functions of the facility staff during an emergency.

6.1.1 The following are examples of when facility evacuation should be considered:

o If there is an actual or projected dose of 5 REM TEDE, unless the Off-site Emergency Manager authorizes exposures up to 25 REM o The facility is on fire o The facility has no electrical power o The facility HVAC is not functioning properly 6.2 It is the goal to activate the EOF within 90 minutes of a declaration of an Alert or higher emergency. The assigned Off-site Emergency Manager will assume command-and-control functions and will be the top line manager responsible for the emergency.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 6 of 28

<___ 7.0 PROCEDURE CAUTION IF radiological conditions threaten the EOF operation based on actual or projected doses or other hazardous conditions, THEN ensure the EOF is evacuated and the Alternate EOF is staffed and activated.

7.1 EOF Activation 7.1.1 Upon notification of a Alert, or a more severe classification, EOF personnel proceed to and establish operations at the Emergency Operations Facility as follows:

1. Obtain the position name tag for the assigned position from the Staffing Board.
2. Print name and ACAD badge number on the Staffing Board where the position badge was located.
3. Proceed to assigned work station and commence with position functions as directed by this procedure.

7.1.2 Personnel should log/record significant emergency response information.

7.1.3 WHEN the following personnel are present and ready to assume their duties and the facility has been declared activated THEN the EOF is considered activated:

o Off-site Emergency Manager o EOF Operations Coordinator o EOF Radiological Coordinator o EOF Administrative Coordinator o EOF Facility Technician 7.1.4 WHEN equipment problems or failures are identified THEN personnel should report to the EOF Administrative Coordinator.

7.2 EOF Deactivation 7.2.1 The Off-site Emergency Manager should inform personnel in the EOF to deactivate.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 7 of 28 7.2.2 EOF personnel should forward logs and all other documentation generated during the emergency to the EOF Administrative Coordinator.

7.2.3 The EOF Administrative Coordinator should transmit all documentation collected to Emergency Planning.

7.2.4 Each EOF position holder should return equipment and supplies to pre-activation status.

7.2.5 Each EOF position holder should report any deficiencies in equipment or supplies to the EOF Administrative Coordinator.

7.2.6 The EOF Administrative Coordinator should notify Emergency Planning of any damaged or missing equipment.

I 7.3 Off-site Emergency Manager 7.3.1 Obtain a turnover briefing from the Site Emergency Manager. EPF 06-002-01, EMERGENCY MANAGER TURNOVER SHEET, may be used as an aid for this turnover.

7.3.2 Ensure the following positions have been filled and are ready for EOF activation:

o EOF Administrative Coordinator o EOF Operations Coordinator o EOF Radiological Coordinator o Facility Technician CAUTION The following responsibilities are those of the Emergency Managers and may NOT be delegated. These responsibilities may be divided between the Site and Off-site Emergency Managers:

o Emergency Classification o Protective action recommendations o Authorization for notification of off-site authorities o Authorization of Emergency Exposures on-site in excess of 10CFR20 Limits 7.3.3 Assume command-and-control of off-site emergency response activities from the Site Emergency Manager.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 8 of 28

1. Inform the staff in the EOF you have assumed command-and-control and that the EOF is declared activated.
2. Direct the EOF Administrative Coordinator to make a plant announcement that the EOF is activated and the name of the Off-site Emergency Manager.

7.3.4 Ensure that communications are established and maintained with the State of Kansas and Coffey County Emergency Operations Centers (EOCs).

7.3.5 Evaluate plant/radiological status for changes in Emergency Classification per EPP 06-005, EMERGENCY CLASSIFICATION.

7.3.6 Based on plant/radiological evaluation, issue Protective Action Recommendations per EPP 06-006, PROTECTIVE ACTION RECOMMENDATION.

7.3.7 Ensure notifications are made in accordance with EPF 06-007-01, WOLF CREEK GENERATING STATION EMERGENCY NOTIFICATION.

7.3.8 Ensure the EOF, Security, Control Room, TSC, and Wolf Creek Public Information Organization staffs are informed of classification or Protective Action Recommendations changes.

1. Ensure ADS, pagers, and announcements are initiated when required.

NOTE Protective Action Recommendations must be consistent with the dose information.

7.3.9 Coordinate with the EOF Radiological Coordinator on the need to authorize exposure limits in excess of 10CFR20 limits (with NRC concurrence if practical) and the need to recommend ingestion of potassium iodide (KI).

7.3.10 Brief EOF personnel on emergency status.

7.3.11 Interface with the Off-site Public Information Coordinator to provide technical input for news statements.

7.3.12 Coordinate with the EOF Administrative Coordinator the need to procure materials, equipment, personnel to support emergency actions.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 9 of 28 7.3.13 Brief the WCGS Executive Management on plant conditions and any action being carried out to control the emergency.

7.3.14 IF necessary, THEN request Federal Assistance through State officials.

7.3.15 Monitor and determine if facility conditions warrant facility evacuation.

7.3.16 IF downgrading or terminating an emergency, THEN perform in accordance with EPP 06-008, RECOVERY OPERATIONS.

7.4 EOF Operations Coordinator 7.4.1 Ensure the normal power supply to the EOF is available.

IF unavailable, THEN ensure that the Diesel Generator is started in accordance with Attachment B, EOF DIESEL OPERATIONS.

7.4.2 IF a radioactive release is in progress or imminent, THEN ensure the HEPA Filtration and the Iodine Monitor are placed in service in accordance with Attachment C, HEPA FILTRATION AND IODINE MONITORING OPERATION.

7.4.3 Ensure the facility clocks are synchronized to the Control Room clock.

7.4.4 Post the appropriate Emergency Classification signs.

1. One sign in the EOF proper and one sign in the hallway next to the copier.

7.4.5 Obtain plant status from the TSC Operations Coordinator and brief the Off-site Emergency Manager.

a. Advise the Off-site Emergency Manager on technical data and trend analysis relating to fuel integrity, plant systems, equipment and instrumentation.

7.4.6 Inform the Off-site Emergency Manager of readiness for EOF activation.

7.4.7 Monitor plant conditions for changes which could affect the emergency classification and notify the Off-site Emergency Manager of the conditions.

7.4.8 Evaluate actual or potential radiological releases based on plant conditions. Discuss evaluation with the Off-site Emergency Manager and EOF Radiological Coordinator.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS

. ~Reference Use Page 10 of 28

_> 7.5 EOF Administrative Coordinator 7.5.1 Contact TSC Administrative Coordinator for the status of notifications.

7.5.2 Inform the Off-site Emergency Manager of readiness for EOF activation.

7.5.3 Ensure the State and County are notified that the EOF is activated and has taken over command-and-control of the emergency.

7.5.4 Ensure EOF Administrative Assistants perform notifications in accordance with EPP 06-007, EMERGENCY NOTIFICATIONS.

7.5.5 Ensure initial EOF staffing is adequate. IF staffing is not adequate, THEN call out additional personnel.

o For off-hours activation use the ADS report OR the NRECs report to evaluate staffing.

7.5.6 Make arrangements for shift relief and meals.

7.5.7 Provide support to the EOF staff as required, including:

o Clerical and administrative support personnel o Warehouse support, procurement and expediting personnel o Additional communications support and equipment repair services o Personnel, support contractors, etc.

7.6 EOF Radiological Coordinator 7.6.1 Obtain current radiological status and Protective Action Recommendations.

7.6.2 Ensure the Facility Technician is available.

[Commitment Step 3.2.3]

7.6.3 Ensure facility habitability has been established.

7.6.4 Notify the Off-site Emergency Manager of readiness for facility activation.

7.6.5 Ensure dosimetry devices are placed in the facility or issued to personnel as appropriate in accordance with EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 11 of 28 7.6.6 Ensure the Off-site Emergency Manager is briefed on radiological status for the development of Protective Action Recommendations.

7.6.7 Provide the Off-site Emergency Manager with an evaluation of the conditions potentially requiring personnel exposure in excess of 10CFR20 limits.

o IF time permits, THEN initiate EPF 06-013-01, EMERGENCY EXPOSURE AUTHORIZATION.

7.6.8 For actual or projected doses perform the following:

1. IF an actual or projected dose in the facility is greater than or equal to 5 REM TEDE, THEN inform the Off-site Emergency Manager of the need to evacuate the facility.
2. IF projected thyroid dose is greater than or equal to 25 REM, THEN recommend the ingestion of KI in accordance with EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION.

7.6.9 Review and evaluate radiological and meteorological data to assess the consequences of any release of radioactive materials including:

o chemical and radiochemical analysis results o off-site monitoring results o dose projection data 7.6.10 Verify that radiological status information is being provided to dose assessment personnel and that the information is accurate and updated.

7.6.11 Coordinate matters associated with off-site radiological assessment activities with representatives of County, State and Federal Agencies.

1. Brief personnel on incoming data
2. Ensure there are consistent dose calculations between the State and WCNOC
3. Confer with State on directing the placement of Joint Radiological Monitoring Teams (Field Teams)

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 12 of 28 7.7 EOF Facility Technician 7.7.1 Establish and maintain facility habitability.

1. Ensure all AIR LOCK DOORS are closed. [Commitment Step 3.2.4]
2. Position a frisker in the facility for habitability monitoring. IF the frisker alarms, THEN take an air sample of the EOF.

o Lead bricks are available for shielding.

o IF general area frisker readings are greater than 100 cpm above background, or readings on the General Atomics iodine monitor are greater than background, THEN an air sample will be taken in accordance with RPP 02-210, RADIATION SURVEY METHODS.

3. Take responsibility for the iodine monitor and perform the following:
a. Change the iodine monitor filters before the unit is placed in operation. Log the flow rate in the Facility Technician log.
b. Check the Ventilation Iodine Monitor hourly for proper operation and log the cpm reading in the Facility Technician log.
c. IF the General Atomics iodine monitor is inoperable during HEPA filter operation, THEN initiate portable iodine sampling at least hourly in accordance with RPP 02-210, RADIATION SURVEY METHODS.
4. Record the Area Radiation Monitor mR/hr reading in the Facility Technician log.

o IF the area radiation monitor exceeds 20 mR/hr, THEN notify the EOF Radiological Coordinator.

5. IF a release is in progress OR as directed, THEN place a frisker at the facility entrance for personnel monitoring.

7.7.2 Inform the Off-site Emergency Manager of readiness for facility activation.

7.7.3 Inform the EOF Radiological Coordinator of all facility habitability surveys.

7 .7.4 Identify and label inoperable equipment.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 13 of 28 7.7.5 Ensure that the Environmental Garage Area is designated and posted as a radiological controlled area in accordance with RPP 02-215, POSTING OF RADIOLOGICAL CONTROLLED AREAS.

7.8 Dose Assessment Coordinator 7.8.1 Ensure dose assessment equipment is in place and functional (i.e., Computer, etc.)

7.8.2 Review the current Protective Action Recommendations and inform the EOF Radiological Coordinator of any changes based on radiological or meteorological conditions.

7.8.3 Consult with the EOF Operations Coordinator to obtain information regarding actual or potential release paths, sources, and duration.

7.8.4 Implement the requirements of EPP 06-012, DOSE ASSESSMENT, comparing TEDE and thyroid estimates with values in EPP 06-006, PROTECTIVE ACTION RECOMMENDATIONS.

7.8.5 Compare inputs and results with the State dose assessment staff.

7.8.6 Inform the EOF Radiological Coordinator of calculated results.

7.8.7 Assist in the formulation of Protective Action Recommendations.

7.8.8 Review, evaluate and trend off-site radiological monitoring data and off-site dose projections, then brief the EOF Radiological Coordinator.

7.9 Dose Assessment Technician 7.9.1 Ensure Dose Assessment Program is operable.

7.9.2 Determines

o meteorological conditions o System status o Radiological Monitoring System and Meteorological data for changes or indications of a release.

o Possible radioactive release pathways.

o An estimate of off-site dose

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 14 of 28 7.9.3 Inform Dose Assessment Coordinator of results.

7.10 EOF Operations Recorder 7.10.1 Ensure NPIS is operable by verifying time and date in the upper right-hand corner are updating.

NOTES o There is a goal of updating the Operations Status Board at 15 minute intervals.

7.10.2 Maintain the Operations Status Board current by using NPIS Turn-On-Codes SB1 and SB2 OR with data obtained from the Operations Communicator on EPF 06-002-02, OPERATIONS STATUS BOARD.

1. Maintain a hard-copy of the NPIS printouts or completed EPF 06-002-02, OPERATIONS STATUS BOARD.

7.10.3 Monitor plant status for adverse trends and inform the EOF Operations Coordinator of changes in plant status which could affect the emergency classification.

7.10.4 Track procedure progress, list the procedure being performed by the Control Room.

7.10.5 Notify the EOF Operations Coordinator when transitions are made to the next procedure.

7.11 EOF Administrative Assistant 7.11.1 Ensure the operability of phones and radios to be used for County and State notifications. Conduct an initial radio check with Coffey County and the State of Kansas.

7.11.2 Ensure the verification phone is plugged in and operable by checking for a dial tone.

1. The verification phone should only be answered in this facility when it is activated and responsible for notifications.

7.11.3 Maintain EOF accountability by performing the following: [Commitment Step 3.2.3]

1. Lock all outside doors to the building except the door on the southwest side of the building (the one next to the garage door).
2. Ensure airlock doors to the simulator are closed.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 15 of 28

3. Ensure personnel entering or exiting the EOF, who are not listed on a staffing board or a JRMT, are logged on EPP 06-010-01, ACCOUNTABILITY LOG.
4. Obtain approval from the EOF Administrative Coordinator for personnel without identification or unknown personnel prior to them entering the EOF.
5. Perform breath analyzer tests as needed for personnel entering the EOF.

7.11.4 Provide assistance to the Off-site Emergency Manager by performing the following:

1. Maintain EPF 06-002-03, SEQUENCE OF EVENTS, log.

The following are examples of items that should be recorded in the log:

o Time of classifications o Time PARs are made o Time protective actions are implemented o Time protective actions are completed o Time events in the plant happened o Time accountability was completed o Time augmentation was determined complete o Anything the Manager determines important

2. Answer the phone as needed.
3. Provide log keeping assistance for the Off-site Emergency Manager as directed.

NOTE Distribution of documents should be to the maroon baskets at EOF workstations.

7.11.5 Perform faxing, copying, and distribution as requested.

Use a Fax coversheet for each Fax sent. FAX numbers are listed in ATTACHMENT D, FAX NUMBERS. Perform distribution of the listed documents as follows:

1. EPF 06-007-01, WOLF CREEK GENERATING STATION EMERGENCY NOTIFICATION to the following:

o Topeka Information Clearinghouse

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 16 of 28 o State of Kansas Public Information Officer o Coffey County EOC o Administrative Coordinator o Nuclear Regulatory Commission (NRC) o Emergency Notification System (ENS) Communicator o Onsite Public Information Coordinator o TSC

2. EPF 06-002-03, SEQUENCE OF EVENTS, to the TSC.
3. Operations and Radiological Status Boards information to the following:

o Off-Site Public Information Coordinator 7.11.6 Provide Off-site communications by performing the following:

1. Contact the TSC to verify the status of notifications.
2. Perform call-out of EOF positions as necessary to complete staffing for the emergency.
3. Perform Emergency Notifications in accordance with EPP 06-007, EMERGENCY NOTIFICATIONS.
a. Verify that all information has been completed on Notification forms prior to transmitting.
4. Conduct calls for off-site support as directed by the EOF Administrative Coordinator.
a. Unless the call for off-site support is to obtain assistance for a life-threatening situation, do not interrupt the Immediate Notifications. Such calls shall be made coincidentally with Immediate Notifications.
b. Calls for immediate off-site support take precedence over Follow-up Notifications.
c. Provide to Security the names of people coming to the site, the time they are expected and any other information to assist in getting the off-site support through Main Gate North.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 17 of 28 7.12 EOF Team Director 7.12.1 Establish and control field teams in accordance with EPP 06-011, EMERGENCY TEAM FORMATION AND CONTROL.

7.12.2 Obtain and monitor radiological data that may affect the Field Team's ability to complete assigned activities.

1. IF a vehicle needs decontamination, THEN inform the Radiological Coordinator:

o Make arrangements with the Coffey County Radiological Officer (see RETD Section I-E) for decontamination at the County Shop.

o Direct the Team to proceed to the Coffey County Shop, located at 1510 South 6th, Burlington, Kansas, for decontamination.

7.12.3 Assign each Emergency Response Team with a team identifier.

7.12.4 Ensure the logging in and analysis of all incoming radiological samples.

7.12.5 Review and document dosimetry results of emergency response activities in accordance with EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION.

7.13 EOF Team Communicator 7.13.1 Ensure that the radio is turned on and selected to the correct channel.

7.13.2 Notify the EOF Team Director when the Teams are ready to depart.

7.13.3 One communicator should establish and maintain communications with the off-site radiological monitoring teams.

1. Verify team identification and membership when Field Teams establish radio communications.
2. Record survey data taken by Field Teams.

7.13.4 One communicator should maintain the field team status boards, plot the locations of the teams, affix the appropriate stability class isopleths to the map and provide any needed assistance in maintaining the Radiological Status Board.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 18 of 28 7.13.5 Communicate directions from the Team Director, maintaining a record of all transmissions.

7.13.6 Inform the teams of changes to plant status and emergency classifications.

7.13.7 Record team data in accordance with EPP 06-011, EMERGENCY TEAM FORMATION AND CONTROL.

7.13.8 Submit data to EOF Team Director for review and calculation verification.

7.14 Health Physics Network Communicator 7.14.1 Inform the EOF Radiological Coordinator that HPN communications is ready to be established.

7.14.2 WHEN requested by the NRC, THEN establish and maintain continuous communications with the NRC via the Emergency Telecommunications System (ETS).

1. Directions for using the ETS are in EPP 06-007, EMERGENCY NOTIFICATIONS.

7.14.3 Furnish radiological data as requested which may include:

o dose projections off-site o sub zones affected o Protective Action Recommendations 7.14.4 Inform EOF Radiological Coordinator of NRC's areas of concern.

7.15 Survey Team Technician 7.15.1 Establish and maintain communications with the EOF Team Communicator.

7.15.2 Perform monitoring duties in accordance with EPP 06-011, EMERGENCY TEAM FORMATION AND CONTROL

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 19 of 28 7.16 Representative at County NOTES o It is acceptable to initially report to the TSC/EOF to gather information.

o Do not make any commitments to the County without the approval of an Emergency Manager.

7.16.1. At the emergency classification of Alert or higher emergency, report to the County EOC in the basement of the County Courthouse, at 6th and Neosho in Burlington.

7.16.2 Respond to requests from personnel in the County EOC, which may include:

o Clarification of plant, technical and radiological data o Verification of plant, technical, meteorological and radiological data o Justification for Protective Action Recommendations o General inquiries 7.16.3 Keep the Off-site Emergency Manager apprised of the status of the implementation of Protective Action Recommendations.

8.0 RECORDS 8.1 Records generated by this procedure during an actual emergency are considered lifetime QA records and shall be forwarded to Emergency Planning at the termination of the emergency.

8.2 Records generated by this procedure during drills or exercises are considered non-QA records and shall be forwarded to Emergency Planning at the termination of the drill or exercise.

9.0 FORMS 9.1 EPF 06-003-01, RADIOLOGICAL STATUS

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 20 of 28 ATTACHMENT A (Page 1 of 3)

ALTERNATE EOF OPERATIONS A.1 EOF Evacuation A.1.1 Off-site Emergency Manager determines when the EOF must be evacuated, based on actual or projected plant, radiological, or other conditions.

A.1.2 The Off-site Emergency Manager determines

1. Staff needed for the Alternate EOF and the staff to transfer to the TSC
2. Excess staff to be released
3. Supplies or equipment to be relocated to the Alternate EOF
4. Preferred routing A.1.3 Off-site Emergency Manager directs all responsibilities of the EOF staff to revert back to the control of the TSC staff until the Off-site Emergency Manager declares the Alternate EOF activated.

o Dose projections and field team control transfers to, and remains with, the TSC after Alternate EOF activation.

NOTE Phone service may take up to 24 hrs. to be fully functional.

Phones existing in KPL office may be used/shared with the KPL business until Wolf Creek lines are operational.

A.1.4 The EOF Administrative Coordinator should initiate activation of phone service for the Alternate EOF.

o Call Southwestern Bell at 800-734-7630 to request immediate activation of phone lines.

A.1.5 The EOF Administrative Coordinator should dispatch an EOF person to open the Alternate EOF OR Call KPL at 800-794-4780 to request that the Duty Supervisor unlock the Emporia office.

o A key for the Alternate EOF is in the E-Plan Cabinet in the EOF Kit Room.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 21 of 28 ATTACHMENT A (Page 2 of 3)

ALTERNATE EOF OPERATIONS NOTE All evacuation routes will be determined based on the current conditions.

A.1.6 The EOF Radiological Coordinator should determine preferred routing for those traveling to:

o TSC o Alternate EOF o Home or Host County Shelter A.1.7 The EOF Radiological Coordinator should discuss with State dose assessment personnel equipment needed for relocation to the Alternate EOF and inform EOF Administrative Coordinator.

A.1.8 The EOF Radiological Coordinator shall verify that it is radio logically prudent to proceed to the TSC.

A.1.9 The EOF Team Director should ensure extra sampling supplies from the EOF cabinets are delivered to the Forward Staging Area.

A.1.10 Environmental samples will be taken to the State Forward Staging Area when the EOF is deactivated.

A.1.11 The HPN Communicator shall inform the NRC of the deactivation of the EOF and request instructions for re-establishing communications after re-locating to the TSC.

o At the direction of the TSC Radiological Coordinator re-establish HPN contact with the NRC.

A.1.12 The EOF Administrative Assistant shall fax copies of Sequence of Events boards to the TSC/OSC.

A.1.13 The EOF Administrative Assistant shall reconcile accountability as personnel leave the facility.

A.1.14 The Wolf Creek Representative to the County remains at the County Emergency Operations Center (CEOC) and reports to the Site Emergency Manager after EOF deactivation.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 22 of 28 ATTACHMENT A (Page 3 of 3)

ALTERNATE EOF OPERATIONS A.2 Alternate EOF Activation A.2.1 Alternate EOF positions may be staffed through a callout of staff for the next shift.

A.2.2 EOF staffing will be directed by the EOF Administrative Coordinator who may alter assignments as needed.

A.2.3 Personnel and equipment arriving at the Alternate EOF from within the 10-mile EPZ are surveyed for radiological contamination and decontaminated prior to full access to the Alternate EOF as directed by the EOF Radiological Coordinator.

A.2.4 The Off-site Emergency Manager declares the Alternate EOF activated when the following positions are present and a level of readiness has been achieved which allows for the assumption of Alternate EOF responsibilities.

o EOF Administrative Coordinator o EOF Facility Technician o EOF Operations Coordinator o EOF Radiological Coordinator NOTE The numbering system for the Alternate EOF will be a continuation of the sequential number last used in the EOF.

A.2.5 The EOF Administrative Assistant should have the TSC Administrative Assistants fax all completed Immediate and Follow-up Notification Forms, copies of the TSC Sequence of Events board and any News Statements.

- END -

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 23 of 28 ATTACHMENT B (Page 1 of 2)

EOF DIESEL OPERATION NOTES o To prevent permanent cranking motor damage, do not crank the diesel for more than thirty seconds continuously. If the diesel does not start within the first thirty seconds, wait one to two minutes before re-cranking.

o Frequency requirements apply only during steady-state conditions with the diesel under a constant load.

B.1 At the Remote Diesel Control Panel, start the diesel generator by placing the MANUAL START toggle switch to the PERMISSIVE START position. IF the diesel does not start within 30 seconds, THEN return the toggle switch to the OFF position for one to two minutes before re-cranking.

B.1.1 Verify the following parameters: (Reference Step 3.1.6) o Oil Pressure GREATER THAN 50 psig o Voltage 450 to 500 volts (all phases) o Frequency 58.8 Hz to 61.2 Hz B.2 At the EOF Side Main Distribution Panel, place breakers for circuits 1 through 13 OFF.

NOTES o The diesel should be allowed to run unloaded for 3 to 5 minutes for warm-up.

o Allow several seconds for generator load to stabilize before placing the next breaker to the ON position.

B.3 At the MANUAL TRANSFER SWITCH, place the NORMAL SUPPLY breaker to OFF.

B.4 At the MANUAL TRANSFER SWITCH, place the DIESEL GENERATOR breaker to ON.

B.5 At the EOF Side Main Distribution Panel, place breakers for circuits 1 through 13 to ON.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 24 of 28 ATTACHMENT B (Page 2 of 2)

EOF DIESEL OPERATION NOTE Frequency requirements apply only during steady-state conditions with the diesel under a constant load.

B.6 WHEN the diesel is operating under load, THEN monitor the following parameters to ensure they are within acceptable range:

(Reference Step 3.1.6) o Oil Pressure GREATER THAN 50 psig o Voltage 450 to 500 volts (all phases) o Frequency 58.8 Hz to 61.2 Hz B.7 IF the EOF Diesel Generator is no longer needed, THEN ensure shutdown the diesel generator as follows:

B.7.1 At the EOF Side Main Distribution Panel, place breakers for circuits 1 through 13 OFF.

B.7.2 At the MANUAL TRANSFER SWITCH, place the DIESEL GENERATOR breaker to OFF.

B.7.3 At the MANUAL TRANSFER SWITCH, place the NORMAL SUPPLY breaker to ON.

B.7.4 At the EOF Side Main Distribution Panel, place breakers for circuits 1 through 13 to ON.

NOTE The diesel should be allowed to run unloaded for 3 to 5 minutes for cool down.

B.7.5 At the Remote Diesel Control Panel, stop the diesel generator by placing the MANUAL START toggle switch to OFF.

B.7.6 Notify the Control Room to perform STN KAF-001, EOF DIESEL GENERATOR OPERATIONS, to ensure the diesel is ready for operation.

- END -

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 25 of 28 ATTACHMENT C (Page 1 of 2)

HEPA FILTRATION AND IODINE MONITORING OPERATION C.1 HEPA FILTRATION STARTUP INSTRUCTIONS C.1.1 At Power Distribution Panel P-1, located at the north end of the hall going to the Learning Center, turn breaker 22 for the Lunch Room Exhaust Fan to "OFF".

[Commitment 3.2.1]

C.1.2 At Power Distribution Panel P-2, located on the south wall of the Mechanical Equipment Room, turn breaker 30 for the Toilet Exhaust Fan to "OFF".

[Commitment 3.2.1]

C.1.3 At the HEPA Filtration Fan Control Box, located on the east wall of the Mechanical Equipment Room, start the fan by pulling the button out.

C.2 IODINE MONITOR STARTUP INSTRUCTIONS NOTE The iodine monitor startup panels are located on the iodine monitor skid in the Mechanical Equipment Room in the EOF.

C.2.1 Ensure the Facility Technician has changed the filters prior to starting the iodine monitor and logged the flow rate in the Facility Technician log.

C.2.2 Ensure "PWR ON" indicator is lit.

C.2.3 CLOSE Purge Valve.

C.2.4 Verify inlet valve is throttled OPEN.

C.2.5 Press and hold the "START" Button.

1. Verify green "ON" light comes on.
2. IF vacuum is not between 3" and 10" Hg on the vacuum gauge, THEN adjust the inlet valve to obtain between 3" to 10" Hg on the vacuum gauge.
3. WHEN vacuum is between 3" to 10" Hg on the gauge, THEN release the "START" button.

C.2.6 Verify the "LIMIT" light is extinguished.

C.2.7 IF the unit fails to start, THEN reset and try to restart the unit.

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 26 of 28 ATTACHMENT C (Page 2 of 2)

HEPA FILTRATION AND IODINE MONITORING OPERATION C.2.8 Verify top of barrel indicates air flow is between 1.8 and 2.2 cfm.

C.3 HEPA FILTRATION SHUTDOWN INSTRUCTIONS C.3.1 At the HEPA Filtration Fan Control Box, located on the east wall of the Mechanical Equipment Room, secure the fan by pushing the button in.

C.3.2 At Power Distribution Panel P-1, located at the north end of the hall going to the Learning Center, turn breaker 22 for the Lunch Room Exhaust Fan to "ON".

[Commitment 3.2.1]

C.3.3 At Power Distribution Panel P-2, located on the south wall of the Mechanical Equipment Room, turn breaker 30 for the Toilet Exhaust Fan to "ON". [Commitment 3.2.1]

C.4 IODINE MONITOR SHUTDOWN INSTRUCTIONS C.4.1 Ensure the Facility Technician has logged the flow rate in the Facility Technician log.

C.4.2 Secure the iodine monitor by pressing and releasing the "STOP" button.

- END -

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 27 of 28 ATTACHMENT D (Page 1 of 1)

FAX NUMBERS D. 1 FAX to the desired location by using the appropriate number from the table below.

LOCATION WHEN FAX VERIFICATION Coffey County Prior to County 364-5758 364-2123 Dispatcher EOC activation:

Coffey County After County 364-8643 364-2721 EOC EOC activation:

State of Kansas (785) 274-1487 (785) 296-3176 (785) 274-1422 (785) 274-1425 OR State Radio State of Kansas (785) 274-1622 (785) 274-1192 PIO NRC Resident 364-8735 Ext. 4575 Inspector Topeka System (785) 575-6010 (785) 575-6078 Dispatch ANI (860) 561-4655 (860) 561-3433 INPO (770) 644-8549 (800) 321-0614 EOF Ext. 5101 Ext. 5100 TSC Ext. 4051 Ext. 4053 Information Prior to (785) 274-1622 (785) 274-1190 Clearinghouse - activation:

Topeka After (785) 267-0742 (785) 267-0603 activation: II

- END -

Revision: 7 EMERGENCY OPERATIONS FACILITY EPP 06-003 OPERATIONS Reference Use Page 28 of 28 FIGURE 1 EMERGENCY OPERATIONS FACILITY ORGANIZATION CFF-SITEEMERGENCY MANAGER OPERATIONS l l [ RADIOLOGICAL ADMINISTRATIVE COOORDNTRDINATOR COORDINATOR IlMN ADMINISTRATIVE l DSE ASEM ASSISTANT DOEASSESSENT TEAM DIRECTOR COORDINATOR REPRESENJTATIVE AT COUNTY

- END -

CORRECTED COPY 06/13/03 WOLFCREEK NUCLEAR OPERATING CORPORATION EPP 06-012 DOSE ASSESSMENT Responsible Manager Superintendent Emergency Planning Revision Number 6 Use Category Reference Administrative Controls Procedure No Infrequently Performed Procedure No Program Number 06 DC2 02/18/03

TABLE OF CONTENTS SECTION TITLE PAGE 1.0 PURPOSE 2 2.0 SCOPE 2

3.0 REFERENCES

AND COMMITMENTS 2 4.0 DEFINITIONS 3 5.0 RESPONSIBILITIES 4 6.0 PRECAUTIONS/LIMITATIONS 5 7.0 PROCEDURE 6 7.1 Program Description 6 7.2 Program Use 9 7.3 Printer Use 14 8.0 INITIAL ACTIONS 15 9.0 SUBSEQUENT ACTIONS 15 10.0 RECORDS 15 11.0 FORMS 15 ATTACHMENT A NPIS SCREEN DISPLAYS 16 ATTACHMENT B RADIATION MONITOR INFORMATION 17

[Revision:6 Reference Use DOSE ASSESSMENT EPP 06-012 Page 2 of 18 1.0 PURPOSE 1.1 This procedure provides guidance for determining release rates and for estimating off-site dose to the Whole Body and Thyroid.

2.0 SCOPE 2.1 The estimated release rate, total release values, off-site dose rates, and integrated doses to the Whole Body and Thyroid, are used in conjunction with EPP 06-006, PROTECTIVE ACTION RECOMMENDATIONS, as one basis for determining off-site protective actions to be recommended to State and County Officials.

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 CHS AX-G01, SAMPLING OF UNIT AND RADWASTE VENTS FOR RADIOACTIVE GAS AND TRITIUM 3.1.2 EPP 06-006, PROTECTIVE ACTION RECOMMENDATIONS 3.1.3 EPP 06-009, DRILLS AND EXERCISE REQUIREMENTS 3.1.4 EPP 06-011, EMERGENCY TEAM FORMATION AND CONTROL 3.1.5 EPP 06-013, EXPOSURE CONTROL AND PERSONNEL PROTECTION 3.1.6 Radiological Emergency Response Plan (RERP) 3.1.7 Regulatory Guide 1.109, Calculation Of Annual Doses To Man From Routine Release Of Reactor Effluents For The Purpose Of Evaluating Compliance With 10CFR50, Appendix I, (Rev. 1, October, 1977) 3.1.8 Regulatory Guide 1.111, Methods For Estimating Atmospheric Transport And Dispersion Of Gaseous Effluents In Routine Releases From Light Water Cooled Reactors, (Rev. 1, July 1977) 3.1.9 Regulatory Guide 1.145, Atmospheric Dispersion Models For Potential Accident Consequence Assessments At Nuclear Power Plants, (August, 1979) 3.1.10 Regulatory Guide 1.23, Meteorological Programs In Support Of Nuclear Power Plants, (September, 1980) 3.1.11 Regulatory Guide 1.4, Assumptions Used For Evaluating The Potential Radiological Consequences Of A Loss Of Coolant Accident For Pressurized Water Reactors, (Rev.

2, June 1974)

3.2 Commitments 3.2.1 ITIP 00101 (SOER 83-02, Recommendation R12), Ensure Estimates Of Dose Can Be Made For Two-Phase Or Liquid Releases Though S/G Safety And Relief Valves.

4.0 DEFINITIONS 4.1 Emergency Planning Zone (EPZ) 4.1.1 The area around WCGS in which emergency preparedness planning is conducted. The plume exposure EPZ has a radius of approximately 10 miles. The ingestion exposure pathway EPZ has a radius of about 50 miles.

4.2 Exclusion Area 4.2.1 That area within a 1200-meter radius surrounding WCGS in which WCNOC has the authority to determine all activities including exclusion or removal of persons and property from the area.

4.3 Integrated Dose 4.3.1 The amount of ionizing radiation that has been received during a given period of time by a population or group.

4.4 Pasquill Atmospheric Stability Classifications 4.4.1 Are measures of the stability or instability of an air mass based upon the vertical temperature differential between two points.

4.5 Projected Dose 4.5.1 The amount of ionizing radiation that is likely to be received by a population or group if no protective action measures are implemented.

4.6 Projected Integrated Dose 4.6.1 The summation of the Integrated Dose (previous) and the Projected Dose (future).

4.7 Protective Actions 4.7.1 Those emergency measures taken to minimize or prevent radiological exposures to personnel.

4.8 Release Rate 4.8.1 The quantity of radioactive material released to the environment expressed in curies per second (Ci/sec).

Revision: 6 DOSE ASSESSMENT EPP 06-012 ]

Reference Use Page 4 of 18 4.9 Source Term 4.9.1 The calculated quantity of radioactive material available for or being released to the environment.

4.10 X/Q 4.10.1 A factor based on meteorological dispersion characteristics which relates atmospheric radionuclide release rates to offsite air concentrations.

4.11 Nuclear Plant Instrument System (NPIS) 4.11.1 A plant monitoring tool designed to view critical systems and components during normal and accident conditions.

4.12 Dose Assessment Program 4.12.1 A computer program developed at Wolf Creek designed to use site-specific source terms in the performance of Dose Assessment during an accident condition.

5.0 RESPONSIBILITIES 5.1 Shift Manager 5.1.1 Prior to activation of the Emergency Operations Facility (EOF), assures the Shift Chemist implements this procedure.

5.2 Radiological Coordinator 5.2.1 IF vent monitor(s) are inoperable, THEN consider dispatching Plant Team(s) to collect appropriate samples.

5.3 Shift Chemist 5.3.1 At the declaration of an ALERT or higher emergency classification reports to the Control Room to perform emergency dose calculations in accordance with this procedure.

5.4 Dose Assessment Coordinator 5.4.2 Recommends that Offsite Monitoring Teams be dispatched to determine offsite dose rates in accordance with EPP 06-011, EMERGENCY TEAM FORMATION AND CONTROL.

5.4.3 Informs the appropriate TSC or EOF management of the dose rate and projected integrated TEDE and Thyroid doses.

5.5 Dose Assessment Technician 5.5.1 Performs emergency dose calculations in accordance with this procedure.

6.0 PRECAUTIONS/LIMITATIONS 6.1 To confirm that the correct version of the Dose Assessment Program is in use, open the Dose Assessment Program, then click on 'Help' and 'Help About'. The correct version currently in use is Rev. 3.5. If the correct version is not loaded on your computer, it should be removed from your hard drive.

6.2 Offsite dose projection calculations should be performed at least once per hour during the first eight hours after the accident unless it is determined that releases of airborne radioactivity from the plant have been terminated.

NOTE Use 15 minute MET data averages to determine if changes are in progress.

6.3 Offsite dose projection calculations may be updated anytime it is deemed necessary. Offsite dose projection calculations should be updated if any of the following conditions occur:

6.3.1 Release rate increases by more than 25 percent.

6.3.2 Wind direction changes by more than 22.50.

6.3.3 Atmospheric stability classification changes.

6.3.4 Wind speed changes by more than 50 percent.

6.3.5 Prior to any planned releases.

6.4 IF a radiological release is already in progress before a dose assessment calculation is performed, THEN be sure to look at historical release data / trend on the NPIS to determine the maximum release rate, monitor readings, and meteorological conditions.

6.4.1 IF this is not done THEN an under estimation of an emergency dose projection can occur.

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 6 of 18 7.0 PROCEDURE 7.1 Program Description NOTES o Tab and Shift Tab key manipulations may be used to move through a Model Screen.

o Commonly practiced window manipulations may also be used to move through the program.

7.1.1 The following models may be selected by selecting the appropriate tab in the upper right hand corner of the program window.

1. Release Rate Model
2. Design Basis Accident (DBA)
3. SG Tube Rupture
4. Radiation Monitoring System
5. Field Team Data 7.1.2 Information
1. Selection of the INFORMATION heading on the tool bar allows access to the following screens:
a. Dose Projection Report/Dose by Subzone
b. Source Term
2. The Dose Projection Report/Dose by Subzone and Model Screen are two separate program windows and can both be visible at the same time, subject to limitations of screen resolution, and size.
a. The Model Screen includes:
1) MET data section
2) Release data section
3) Performed/Verified signature section
4) Release start time
5) Calculation result section:

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 7 of 18 a) Particulate, Noble Gas and Iodine release rates.

b) Projected Centerline Dose Segment - the results of the data entered above but not summed.

6) PAR section which is based on the Projected Dose Segment as well as the summed doses.

a) Only evacuation recommended subzones are listed.

b. Dose Projection Report/Dose by Subzone Screen includes:
1) Dose Rate to the Whole Body and Thyroid for Exclusion Area Boundary (EAB), 2, 5, and 10 miles in Roentgen per hour (R/hr).
2) Plume arrival time in minutes for EAB, 2, 5, and 10 miles based on wind speed.
3) Estimated hours until evacuation necessary for EAB, 1 REM TEDE or 1 REM thyroid.
4) A list of both TEDE and Thyroid Dose for each subzone.
3. The source term option allows manipulation of DCF information.
a. The source term enables the user to alter the distribution from the USAR Gap and default activities.
1) Selection of the Activity heading on the source term screen tool bar allows the user to zero all activities for manual entry or to return to USAR Gap activities.
2) Selection of the File heading on the source term screen tool bar allows for data file manipulation.

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 8 of 18 NOTE If the containment spray is selected, the program will inquire whether the spray has been on for 30 minutes or more. If the spray has been on for 30 minutes or more, the filtration factor will be utilized; if not, the filtration factor will not be applied.

b. Two additional nuclide distribution factors are available on the source term screen, HEPA filters and Containment Spray.
1) A "Y" entry in the HEPA Filter Box reduces the Iodine Activity 90%. That is, 10% of the Iodine activity is released to the public.
2) A "Y" entry in the Containment Spray Box reduces the Iodine Activity available for release by 75%. That is, 25% of the Iodine activity is released to the public.
3) If both HEPA Filter and Containment Spray are answered "Yes", the Iodine Activity used in the offsite dose projections is reduced to 2.5% of its original activity level.
4) Prior to performing real time calculations, the user must remember to check the source term screen values to ensure projection source term values are appropriate.
4. PARs selection from the Information Menu Bar provides information for review of Protective Action Recommendations.

NOTE The notification form can only be printed if THE DOSE ASSESSMENT PROGRAM is running from the LAN.

5. The File Menu bar provides options to print the Notification form and calculation worksheet.

7.1.3 Data

1. Selection of Data from the Menu Bar allows selection of the following actions:
a. Sort Dose by Subzone

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 9 of 18

b. Sum Dose
c. Perform Calculations
d. Long Range Calculations
2. The Sort Dose by Subzone and Sum Dose actions are self-explanatory.

7.1.4 Calculations

1. The offsite doses will be calculated using the data displayed on the Model Screen.

7.1.5 Long Range Calculations

1. The offsite doses, and farthest evacuation distance will be calculated using the data displayed on the Model Screen.

7.2 Program Use 7.2.1 The Dose Assessment Program will normally be operated from an Icon on the desktop. The program is also available at I:\Shared\EDCP\EDCP.EXE.

7.2.2 Select a Release Model from the tabs in the upper right hand corner of the program screen.

7.2.3 Dose calculations may now be performed. Menu items necessary for operation of the program are selected from the Menu Bar.

NOTE On a total loss of offsite power, certain radiation monitors are still available. See ATTACHMENT B for more information.

7.2.4 Obtain the following information:

1. Plant Status
2. MET data
3. Process Monitor data
4. Effluent Flow rate data

-OR-

5. If no data is available perform a DESIGN BASIS RCS LOCA using:

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 10 of 18

a. DBA Release Rate
b. Unfiltered Release Pathway
c. Stability Class D for daytime or Stability Class F for night time

-OR-

d. If the accident is deemed to be outside of Design Basis and is rapidly escalating, recommend to the Emergency Manager to use EPP 06-006, PROTECTIVE ACTION RECOMMENDATIONS.

7.2.5 Dose Assessment Program MET Information

1. Wind speed can be input as mph, kph, or mps by double-clicking within the box surrounding the input description until the appropriate description is displayed.
2. Projected release duration and time since reactor trip can both be input as hrs., mins., or days by double-clicking within the box surrounding the input description until the appropriate description is displayed.
3. A Stability Class-Wind Speed/Weather Conditions Help Screen is available by double-clicking within the stability class input field.
a. The user may generate a stability class by selecting the appropriate weather condition and inputting the proper wind speed.
b. The generated stability class is returned to the Model Screen by selecting FILE EXIT.

7.2.6 Dose Assessment Program Model Operations

1. Steps 7.2.7 through 7.2.11 contain information regarding data entry specific to each model 7.2.7 Option One, Release Rate Model
1. This model allows the user to input Gaseous and Iodine release rates in Ci/sec.
2. The following instructions may be useful in operating the Release Rate Model:
a. Gaseous Release Rate may be changed to Total Release Rate by double-clicking within the box surrounding the Gaseous Release Rate.

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 11 of 18

1) Likewise, the display can be changed to Gaseous Release Rate from Total Release Rate by double-clicking within the box surrounding the total release rate.
b. Iodine Release Rate may be changed to a ratio by double-clicking within the box surrounding the Iodine Release Rate.
1) IF the ratio is known, THEN the value can be entered.
2) If the ratio is unknown, a Help Screen may be displayed by double-clicking within the input field for the iodine ratio.
3) Once the user selects the appropriate ratio from the list, FILE EXIT is used to return to the Model Page of the report.
4) The display may be changed back to Iodine Release Rate by double-clicking within the box surrounding Iodine/Noble Gas Ratio.
c. IF a leak rate (gal/min) and activity (gCi/cc) is known or can be estimated, THEN the following calculation could be used to determine a release rate:

(~C~(~l~ inV'.05LV1Occ") 0 Ci Ci cc min 60s gal L lE6jiCi) s 7.2.8 Option Two, Design Basis Accident (DBA) Model

1. This model allows the user to perform dose calculations based on USAR release rate data for various design accidents.
2. If this option is selected, the user may select from a list of nine DBAs:
a. Loss of Coolant
b. Main Steam Line Break
c. Loss of Offsite AC
d. Locked RCP Rotor
e. Waste Gas Decay Tank Rupture
f. CVCS Break

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 12 of 18

g. SG Tube Rupture
h. Fuel Handling Accident
i. Control Rod Ejection NOTE Use field team data whenever available to provide the most accurate dose estimations.

7.2.9 Option Three, Steam Generator Tube Rupture

1. The SG Tube Rupture Model allows the user to perform dose calculations based on a steam generator tube rupture utilizing steam flow and shine monitor readings.
2. The following instructions may be helpful when performing SG Tube Rupture calculations:
a. Steam generator monitor readings may be input in mR/hr for either a steaming steam generator or a full steam generator.
1) The input description is changed by double-clicking within the box surrounding the input description.
2) Steam generator flow may be input in lbm/hr, thousands of lbm/hr, gph or as a pressure entered by the user.

a) Gallons per hour (gph) should be selected if the steam generator is full of water.

This option represents a two-phase or liquid release from the steam generator.

[Commitment Step 3.2.1]

b) The input description is changed by double-clicking within the box surrounding the input description.

3) A Steam Generator PORV/Auxiliary Feed Exhaust Help Screen is available by double-clicking either the steam generator monitoring readings or steam generator flow input field.

a) Once the Help Screen is completed, the user can return the averaged flow and monitor readings to the Main Screen by selecting FILE EXIT.

Revision: 6 DOSE ASSESSMENT EPP 06-012 l Reference Use Page 13 of 18 l 7.2.10 Option Four, Radiation Monitoring System (RMS)

1. The RMS Model allows the user to input data from the unit and/or radwaste vent monitor as well as the vent flow rates to perform offsite dose calculations.
2. The following instructions may be helpful when performing RMS calculations:
a. Gaseous Activity - May be changed to Total Activity by double-clicking within the box surrounding Gaseous Activity.
1) Likewise, if Total Activity is displayed it may be toggled back to Gaseous Activity by using the same technique.
b. Iodine Activity - May be changed to a ratio if necessary by entering the ratio value followed by double-clicking within the box surrounding the Iodine Activity. This is a toggle type of function and may be returned to an activity using the same technique.
1) If the ratio is unknown, the value may be entered.
2) If the ratio is unknown, once the display has been changed to a ratio input, double-clicking on the associated data field will access a Help Screen.
3) Once the user selects the appropriate DBA ratio, FILE EXIT may be used to return the value to the Model Screen.
c. Vent Flow -- may be entered.
1) A Help Screen is available by double-clicking the Vent Flow data box.
2) Enter the fan status for each fan by entering the status and then pressing Enter.
3) Select Vent Totals from the tool bar and total the flows required.
4) Select FILE EXIT from the tool bar to forward the value to the Model Screen.

7.2.11 Option Five, Field Team Data Model

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 14 of 18

1. This model allows the user to input field team dose rates, iodine concentration, particulate concentration and distance information to back calculate the plant release rate and then ultimately the down field doses.
2. The following instructions may be helpful when performing the Field Team dose calculations:

NOTE The Particulate/Iodine ratio used throughout the Dose Assessment Program is 0.112. If the Particulate/Iodine ratio is selected, unless an entry is made, the value of 0.0 will be used. This option only pertains to the field team model.

a. Field Team Iodine Concentration may be changed to Iodine/Noble Gas Ratio by double-clicking in the box surrounding Field Team Iodine Concentration. This is a toggle-type function and may be changed back to concentration input using the same technique. By selecting Iodine/Noble Gas Ratio the particulate field will change to Particulate/Iodine Ratio.
1) If the ratio is known, the value may be entered.
2) If the ratio is unknown, once the display has been changed to a ratio input, double-clicking on the associated data field will access a Help Screen.
3) Once the user selects the appropriate ratio, FILE EXIT may be used to return the value to the Model Screen.
b. Field Team Distance may be toggled between units of miles and kilometers by double-clicking in the box surrounding the Field Team Distance.

7.3 Printer Use 7.3.1 Selection of FILE and PRINT from the tool bar will allow the user to print to a Network printer.

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 15 of 18 NOTE There may be error messages received when printing the notification form. In most cases these are due to the PC configuration and not the Dose Assessment Program program. If the program does not abort, then you should get printed output.

7.3.2 The notification form will only print if the PC is connected to the LAN and the user is logged into a server.

8.0 INITIAL ACTIONS 8.1 None.

9.0 SUBSEQUENT ACTIONS 9.1 None.

10.0 RECORDS 10.1 Printouts associated with this procedure are considered records.

10.2 Records generated by this procedure during an actual emergency are considered lifetime QA records and shall be forwarded to Emergency Planning at the termination of the emergency.

10.3 Records generated by this procedure during a drill or exercise are considered non-QA records and shall be forwarded to Emergency Planning at the termination of the drill or exercise.

11.0 FORMS 11.1 None

- END -

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 16 of 18 ATTACHMENT A (Page 1 of 1)

NPIS SCREEN DISPLAYS Group Menu - Touch Screen for E-Plan Menu E-Plan Menu - Touch Screen for one of the following I STATUS BOARD II AREA RAD

1. RCS 1. Radiological Status
2. Steam Generators a.) MET Data a) Levels b) Radmonitors RCi/cc b) Pressures Press F2 Key
3. ECCS 2. Area Radmonitors mR/hr
4. Containment and CHARM R/hr a) Pressure 3. To exit press F6 Key b) Temperature c) H2 concentration d) CHARM R/hr Press F3 Key
5. Critical Parameters
6. To exit press Group Key III MET TOWER DATA IV GROUP DISPLAY
1. Stability Class 1. SGCHEM 1
2. Wind Speed 2. SGCHEM 2
3. Wind Direction 3. SGCHEM 3
4. Vert Temp Difference OF 4. PORVMSIV, etc.

NOTE: To change to OC type NOTE: a) To trend press F4 GD MET and press Key b) For the New Group Enter Key Display press F5 Key

5. To exit press Group Key 5. To exit press Group Key NOTE: Screen Display Color Code RED - Alarm YELLOW - Alert GREEN -Normal BLUE - Invalid Reading

- END -

Revision: 6 DOSE ASSESSMENT EPP 06-012 Reference Use Page 17 of 18 ATTACHMENT B (Page 1 of 2)

RADIATION MONITOR INFORMATION On a total loss of off-site power the following radiation monitors remain operable:

GHRT 10A Radwaste Building Vent - Part & Iodine GHRT 10B Radwaste Building Cent - WRGM GTRE 21A Unit Vent - Part & Iodine GTRE 21B Unit Vent - WRGM FCRT 385 Aux. Feedwater Turbine Discharge Monitor ABRT 111 Steam Line "D" PORV Discharge Monitor ABRT 112 Steam Line "C" PORV Discharge Monitor ABRT 113 Steam Line "B" PORV Discharge Monitor ABRT 114 Steam Line "A" PORV Discharge Monitor

1. These monitors have as their normal AC power SP02 which is supplied by AC power supply PG19GFF3 (480 Volt AC). This feeds or goes from PG19GFF3 to SP01 Inverter [an UPI] to SP02 to monitors.

ATTACHMENT B (Page 2 of 2)

RADIATION MONITOR INFORMATION

2. The SP01 Inverter is also fed by a 125 volt DC power PK0304

[plant batteries]. In the event of a loss of offsite power occurs (PG19GFF3) then the inverter (UPI) SP01 still feeds the monitors via SP02.

3. If after a total loss of offsite power, the plant would regain one of the NB buses, then the radiation monitors that are fed from that bus would also be available if flow was restored to the monitor.

NOTE The Chemistry Technicians may have to remind the Control Room to restore flow to these monitors.

4. If the RM-l1 is not available the flow to these monitors will have to be done from their RM-23's. (The RM-il is not powered by NB bus).