Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners
ML24061A264
Person / Time
Site: Wolf Creek, Peach Bottom  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/01/2024
From: Hamman D
Wolf Creek
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk, Office of Nuclear Reactor Regulation
References
000334
Download: ML24061A264 (1)


Text

DustinT. Hamman Director Nuclear and Regulatory Affairs

March 1, 2024 000334

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Docket Nos. 50-482 and 72-79: Revision of Two Procedures that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

Commissioners and Staff:

In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), WCGS is submitting a change to the emerg ency plan. Specifically, two procedures that implement the WC GS RERP have been revised. The revised documents are identified below:

Procedure Effective Date EPP 06-002, Rev. 46B February 6, 2024 EPP 06-003, Rev. 29A February 6, 2024

The attached summaries of the changes to the implementing procedures explain that these chan ges do not reduce the effecti veness of the WC GS RERP.

This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.

Sincerely,

Dustin T. Hamman

DTH/ jkt

Attachment:

Summary of Changes to Two Procedures that Implement the Radiological Emergen cy Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

cc: S. S. Lee (NR C), w/a J. D. Monninger (NRC), w/a G. E. Werner (NRC), w/a Director of Division of Fuel Management (NRC), w/a Senior Emergency Pr eparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a WC Licensing Correspondence, w/ a - RA 24-000334

P.O. Box 411 l Burlington, KS 66839 l 620 -364-8831

Attachment to 000334 Page 1 of 1

Summary of Changes t o Two Procedures that Implement the Radi ological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

1. Procedure EPP 06-002, TECHNICAL SUPPORT CENTER OPERATIONS, Rev. 46B

Procedure EPP 06-0 02 has been revised. The procedure provides guidelines for the activation of the Technical Support Center (TSC) and Alternate TSC. It also includes the responsibilities and guidance for Emergency Response Organization (ERO) personnel assigned to the TSC. Administrative changes were made to provide wording consistency, a form reference was corrected, and the augmentation requirement associated with the TSC position was clarified.

These changes do not reduce the effectiveness of the Wolf Creek Radiological Emergency Response Plan.

2. Procedure EPP 06-003, EMERGENCY OPERATIONS FACILITY OPERATIONS, Rev.

29A

Procedure EPP 06-00 3 has been revis ed. The procedure describes responsibilities and provides direction for ERO positions required to activate and staff the Emergency Operations Facility (EOF). Administrative changes were made to provide wording consistency, a form reference was corrected, and the responsible organization for the procedure was clarified.

These changes do not reduce the effectiveness of the Wolf Creek Radiological Emergency Response Plan.