Operating Corp. - Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
ML21014A046
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/12/2021
From: Benham R
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA 21-0005
Download: ML21014A046 (2)


Text

Ron Benham Director Nuclear and Regulatory Affairs January 12, 2021 RA 21-0005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: Revision of Two Procedures that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

Commissioners and Staff:

In accordance with 10 CFR 50.54(q)(5), WCGS is submitting a change to the emergency plan.

Two procedures that implement the WCGS RERP have been revised. The revised documents are identified below:

Procedures Effective Dates EPP 06-002, Rev. 46A December 20, 2020 EPP 06-010, Rev. 11A December 20, 2020 The attached summary of the changes to the implementing procedures explain that these changes do not reduce the effectiveness of the WCGS RERP. This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.

Sincerely, Ron Benham RDB/rlt

Attachment:

Summary of Changes to Two Procedures that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) cc: S. S. Lee (NRC), w/a S. A. Morris (NRC), w/a N. OKeefe (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 l Burlington, KS 66839 l 620-364-8831

Attachment to RA 21-0005 Page 1 of 1 Summary of Changes to Two Procedures that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)

1. Procedure EPP 06-002, Technical Support Center Operations, Rev.

46A Security has changed to a single ring security perimeter. This change leaves Main Gate North unattended and moves security access to the Security Access Facility.

This change complies with 10 CFR 73.55 requirements and there is no impact on the Emergency Plan due to this change. EPP 06-002 changes reflect the name change from Main Gate North to Security Access Facility.

The change does not reduce the effectiveness of the Emergency Plan.

2. Procedure EPP 06-010, Personnel Accountability and Evacuation, Rev. 11A Security has changed to a single ring security perimeter. This change leaves Main Gate North unattended and moves security access to the Security Access Facility.

This change complies with 10 CFR 73.55 requirements and is being addressed in the Security Plan. There is no impact on the Emergency Plan due to this change.

EPP 06-010 is being changed to reflect the name change for security access from Main Gate North to Security Access Facility.

The change does not reduce the effectiveness of the Emergency Plan.