March 11, 2024

SUBJECT:

WOLF CREEK GENERATING STATION - FIRE PROTECTION TEAM INSPECTION REPORT 05000482/2024012

Dear Cleve Reasoner:

On February 29, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with Mike Boyce, Vice President Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Nicholas H. Taylor, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2024012

Enterprise Identifier:

I-2024-012-0002

Licensee:

Wolf Creek Nuclear Operating Corp

Facility:

Wolf Creek Generating Station

Location:

Burlington, KS

Inspection Dates:

February 12 to 29, 2024

Inspectors:

J. Drake, Senior Reactor Inspector

J. Mejia, Reactor Inspector

G. Pick, Senior Reactor Inspector

Approved By:

Nicholas H. Taylor, Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis or safe shutdown analysis.

(1) Ensured that post maintenance and surveillance activities were performed as scheduled for the underground fire loop and fire pumps
(2) Performed walk downs to identify equipment alignment discrepancies, inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.
(3) Verified that operator actions could be accomplished for procedure OFN RP-017, "Control Room Evacuation," as assumed in the licensees fire probabilistic risk assessment and safe shutdown analysis.
(4) Ensured that post maintenance and surveillance activities were performed as scheduled for fire protection features in fire area A27, reactor trip switchgear room, and fire area C21, lower cable spreading room.

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees fire protection program contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Evaluated the administrative controls related to hot work, combustible controls, fire impairments, and fire watches.

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved fire protection program do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the safe shutdown analysis have not been degraded through changes or modifications.

d. The fire protection program documents, such as the updated final safety analysis report, fire protection report, fire hazards analysis, and safe shutdown analysis were updated consistent with the fire protection program or design change.

e. Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) Transferred exterior firefighting equipment from fixed fire hose houses to mobile vehicles located inside and outside the protected area.
(2) Changed fire water supply pipe containment isolation valve from a swing check valve to a nozzle check valve and increased the spring force to ensure appropriate isolation.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 29, 2024, the inspectors presented the fire protection team inspection results to Mike Boyce, Vice President Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05

Calculations

FP-MW-003

Minimum Wall Determination for 1FP003AA12

April 24, 1989

71111.21N.05

Calculations

KC-264

Maximum Service Pressure for the Fire Protection

System Piping

71111.21N.05

Calculations

KC-M-006

Water-based Fire Protection System and Standpipe

System Hydraulic Calculation

71111.21N.05

Corrective Action

Documents

CR-

00106368, 00145251, 10000899, 10000916, 10002218,

10002345, 10002506, 10002793, 10003002, 10003178,

10003978, 10004001, 10008133, 10008956, 10009191,

10010105, 10010236, 10010968, 10011137, 10011967,

10012261, 10013103, 10013467, 10014308, 10015654,

10015821, 10016513, 10017241, 10017527, 10017628,

10017895, 10019028, 10021614, 10022233, 10023112,

10023674, 10023797, 10023855, 10023856, 10023858,

10023861, 10024164, 10024397, 10025126, 10025633,

10027106, 10027534, 10028868, 10029086, 10029102,

10029117, 10029413, 10029467, 10029486, 10029769,

10029770, 10029771, 10030085

71111.21N.05

Corrective Action

Documents

Resulting from

Inspection

CR-

10030122, 10030162, 10030195, 10030196, 10030218

71111.21N.05

Drawings

10466-M-658-

00067-W04

Load Center & Motor Generator Sets Room

Auxiliary Building El 2026' 0"

March 16,

1983

71111.21N.05

Drawings

M-0023, sheet 1

P&ID Fire Protection System (FP)

71111.21N.05

Drawings

M-0023, sheet 2

P&ID Fire Protection System (FP)

71111.21N.05

Drawings

M-0140

Piping Penetrations Circulation Water Screenhouse

71111.21N.05

Drawings

M-12KC01

P&ID Fire Protection Turbine Building

71111.21N.05

Drawings

M-12KC02

P&ID Fire Protection System

71111.21N.05

Drawings

M-12KC03

P&ID Fire Protection System

71111.21N.05

Drawings

M-12KC05

P&ID Fire Protection System

71111.21N.05

Drawings

M-12KC06

P&ID Fire Protection Halon System

71111.21N.05

Drawings

M-1X1924

Auxiliary Building Penetration Closure Wall Elevation

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Sheet 24

71111.21N.05

Drawings

M-650A-00047,

sheet 1

Lower Cable Spreading Area El 2023' 0" Pre-action

System

71111.21N.05

Drawings

M-663-00017

Penetration Seal Typical Details

W23

71111.21N.05

Drawings

M-663-00017A

Fire Protection Evaluations for Unique or Unbounded

Fire Barrier Configurations

W08

71111.21N.05

Drawings

NEIL-PXX-062

Nuclear Electric Insurance Limited General

Arrangement Insurance Plan

71111.21N.05

Engineering

Changes

20430

Enertech Nozzle Check Valve Model DRV-Z Helical

Spring

71111.21N.05

Engineering

Changes

20447

Diesel-Driven Fire Pump Engine - Fuel in Oil Resolution

71111.21N.05

Engineering

Changes

20479

Install Seal in Penetrations P135W2195 & 2196

71111.21N.05

Engineering

Changes

20480

Removal of Fire Hoses from Hose Houses

71111.21N.05

Engineering

Evaluations

E-1F9915

Design Basis Document for OFN RP-017, Control Room

Evacuation

71111.21N.05

Engineering

Evaluations

WCNOC PSA-

067

Internal Fire - Qualitative Screening, Quantitative

Screening and Quantification Notebook

71111.21N.05

Miscellaneous

230112-TIME_CRITICAL-19605598-1

January 16,

23

71111.21N.05

Miscellaneous

230112-TIME_CRITICAL-19605601-1 _1

January 16,

23

71111.21N.05

Miscellaneous

230110-TIME_CRITICAL-19580671-1

January 10,

23

71111.21N.05

Miscellaneous

Fire Protection Program Regulatory Bases

71111.21N.05

Miscellaneous

24

Technical Specification for Fire Protection System for

Wolf Creek Generation Station

71111.21N.05

Miscellaneous

2

Specification for Circulation Water Screenhouse and

Discharge Structure

AM10

71111.21N.05

Miscellaneous

ANSI B31.1 -

1973 edition

and Summer

Power Piping

1973, 1976

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1976 addenda

71111.21N.05

Miscellaneous

APF 10-103-04

Hourly Fire Watch Permit Log

June 12, 2023

71111.21N.05

Miscellaneous

M-10KC

System Description Fire Protection System (KC & FP)

71111.21N.05

Miscellaneous

PT

296, 12299, 12330, 12341, 12343, 12996, 14660,

15609, 16659, 16826, 17458, 18074, 18502, 18616,

18669, 18707, 18727, 18746, 18760, 18767, 18796,

18821

71111.21N.05

Miscellaneous

Response Plan

Corroded Fire Protection Pipe 1FP003BA-12 at CWSH

February 27,

24

71111.21N.05

Miscellaneous

Terracon

Project No.

2117086

Limited Site Investigation Report

September 27,

2011

71111.21N.05

Miscellaneous

WCAP-16755-

NP

Operator Time Critical Action Program Standard

71111.21N.05

Miscellaneous

WCLR-13

Fuel Oil Chemistry B2,1,14

71111.21N.05

Miscellaneous

WCLR-14

Fire Water System B2.1.13

71111.21N.05

Miscellaneous

WCLR-15

Fire Protection B2.1.12

71111.21N.05

Miscellaneous

WCLR-34

Buried Piping and Tanks Inspection B2.1.18

71111.21N.05

Miscellaneous

WR 01698-89

Engineering Disposition

April 27, 1989

71111.21N.05

Miscellaneous

WR 02641-88

Engineering Disposition

March 10,

1989

71111.21N.05

Procedures

AI 10-001

Fire Brigade Equipment Inventory, Maintenance and

Cleaning

13B

71111.21N.05

Procedures

AI 21-016

Operator Time Critical Actions Validation

14, 15, 16, 17,

18, 19, 20, 21,

2, 23, 24, 25

71111.21N.05

Procedures

AI 21-017

Timed Fire Protection Actions Validation

10B

71111.21N.05

Procedures

AP 10-100

Fire Protection Program

71111.21N.05

Procedures

AP 10-101

Control of Transient Ignition Sources

71111.21N.05

Procedures

AP 10-102

Control of Combustible Materials

71111.21N.05

Procedures

AP 10-103

Fire Protection Impairment Control

71111.21N.05

Procedures

AP 10-106

Fire Preplans

71111.21N.05

Procedures

AP 10-109

Fire Protection Inspections

9A

71111.21N.05

Procedures

AP 21-004

Operator Response Time Program

5A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05

Procedures

AP 23I-003

License Renewal Implementation

0A

71111.21N.05

Procedures

MCM XP-001

Pump Packing Adjustment

71111.21N.05

Procedures

OFN RP-017

Control Room Evacuation

49A, 50, 51,

2, 53, 54, 55,

71111.21N.05

Procedures

STN FP-202

Yard Loop, Hydrant Flush & Hydrant Inspection

71111.21N.05

Procedures

STN FP-204

Fire Protection System C-Factor Test

71111.21N.05

Procedures

STN FP-206

Spray and Sprinkler System Function Testing - Wet Pipe

71111.21N.05

Procedures

STN FP-208

Hose Rack Visual Inspection

10B

71111.21N.05

Procedures

STN FP-209

Fire Pump Performance and Sequential Start Test

71111.21N.05

Procedures

STN FP-210

Hose Rack Visual Inspection Reactor Building

71111.21N.05

Procedures

STN FP-211

Diesel Fire Pump 1FP01PB Monthly Operation and Fuel

Leven Check

71111.21N.05

Procedures

STN FP-216

Spray and Sprinkler Functional Testing - Pre-Action

71111.21N.05

Procedures

STN FP-225

Fire Barrier Inspection

71111.21N.05

Procedures

STN FP-400C

Halon Sys/Control Cab. Load Center/M.G. Sets Rm

(KC-225)

9B

71111.21N.05

Procedures

STN FP-404A

Halon Main Bank Tank Weight and Pressure Checks

71111.21N.05

Procedures

STN FP-411

Fire Pump (Diesel) Battery Inspection

8C

71111.21N.05

Procedures

STN FP-412

Fire Pump (Diesel) Battery and Electrical Termination

Check

7E

71111.21N.05

Procedures

STN FP-431

Fire Hose Station Valve Operability and Hose

Replacement/Hydro

71111.21N.05

Procedures

STN FP-432

Containment Building Fire Hose Station Valve

Operability and Hose Replacement

7A

71111.21N.05

Procedures

STN FP-600

Fire Pump Diesel Fuel Storage Tank

71111.21N.05

Procedures

STN FP-817A

Trip Act. Device Oper. Test For Bechtel Zones 100, 103,

104, 105, 106, 107, 112, 113 and 114

11C

71111.21N.05

Procedures

STN FP-817F

Trip Act. Device Oper. Test for Bechtel Zones 306, 307

and 314-317

8B

71111.21N.05

Procedures

STN KC-208

Hose Rack Visual Inspection (Balance of Plant)

11A

71111.21N.05

Procedures

SYS FP-280

Temporary Diesel Fire Pump Installation and Removal

71111.21N.05

Procedures

SYS FP-290

Temporary Diesel Fire Pump Operations

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05

Work Orders

WO

11-344879-000, 12-361269-000,

13-366877-000, 14-390203-000,

16-418842-000, 17-422828-000,

17-427766-070, 17-427919-000,

17-434751-000, 18-434832-000,

18-438968-000, 19-448843-000,

19-450243-000, 19-453258-000,

20-457452-005, 20-458272-000,

20-459743-000, 20-460511-000,

20-461722-000, 21-468506-000,

21-469299-000, 21-470489-000,

21-474041-000, 21-476631-000,

21-476636-000, 22-476973-000,

2-477446-000, 22-477639-000,

2-477651-000, 22-478338-000,

2-479773-000, 22-479783-000,

2-480139-000, 22-480182-000,

2-480182-000, 22-480514-000,

2-481003-000, 23-404785-000,

23-483628-000, 23-484780-000,

23-487116-000, 23-487421-000,

23-488552-000