March 11, 2024
SUBJECT:
WOLF CREEK GENERATING STATION - FIRE PROTECTION TEAM INSPECTION REPORT 05000482/2024012
Dear Cleve Reasoner:
On February 29, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with Mike Boyce, Vice President Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Nicholas H. Taylor, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000482 License No. NPF-42
Enclosure:
As stated
Inspection Report
Docket Number:
05000482
License Number:
Report Number:
Enterprise Identifier:
I-2024-012-0002
Licensee:
Wolf Creek Nuclear Operating Corp
Facility:
Wolf Creek Generating Station
Location:
Burlington, KS
Inspection Dates:
February 12 to 29, 2024
Inspectors:
J. Drake, Senior Reactor Inspector
J. Mejia, Reactor Inspector
G. Pick, Senior Reactor Inspector
Approved By:
Nicholas H. Taylor, Chief
Engineering Branch 2
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis or safe shutdown analysis.
- (1) Ensured that post maintenance and surveillance activities were performed as scheduled for the underground fire loop and fire pumps
- (2) Performed walk downs to identify equipment alignment discrepancies, inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.
- (3) Verified that operator actions could be accomplished for procedure OFN RP-017, "Control Room Evacuation," as assumed in the licensees fire probabilistic risk assessment and safe shutdown analysis.
- (4) Ensured that post maintenance and surveillance activities were performed as scheduled for fire protection features in fire area A27, reactor trip switchgear room, and fire area C21, lower cable spreading room.
Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees fire protection program contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
- (1) Evaluated the administrative controls related to hot work, combustible controls, fire impairments, and fire watches.
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved fire protection program do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c. Assumptions and performance capability stated in the safe shutdown analysis have not been degraded through changes or modifications.
d. The fire protection program documents, such as the updated final safety analysis report, fire protection report, fire hazards analysis, and safe shutdown analysis were updated consistent with the fire protection program or design change.
e. Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) Transferred exterior firefighting equipment from fixed fire hose houses to mobile vehicles located inside and outside the protected area.
- (2) Changed fire water supply pipe containment isolation valve from a swing check valve to a nozzle check valve and increased the spring force to ensure appropriate isolation.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On February 29, 2024, the inspectors presented the fire protection team inspection results to Mike Boyce, Vice President Engineering, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Calculations
Minimum Wall Determination for 1FP003AA12
April 24, 1989
71111.21N.05
Calculations
KC-264
Maximum Service Pressure for the Fire Protection
System Piping
71111.21N.05
Calculations
KC-M-006
Water-based Fire Protection System and Standpipe
System Hydraulic Calculation
71111.21N.05
Corrective Action
Documents
CR-
00106368, 00145251, 10000899, 10000916, 10002218,
10002345, 10002506, 10002793, 10003002, 10003178,
10003978, 10004001, 10008133, 10008956, 10009191,
10010105, 10010236, 10010968, 10011137, 10011967,
10012261, 10013103, 10013467, 10014308, 10015654,
10015821, 10016513, 10017241, 10017527, 10017628,
10017895, 10019028, 10021614, 10022233, 10023112,
10023674, 10023797, 10023855, 10023856, 10023858,
10023861, 10024164, 10024397, 10025126, 10025633,
10027106, 10027534, 10028868, 10029086, 10029102,
10029117, 10029413, 10029467, 10029486, 10029769,
10029770, 10029771, 10030085
71111.21N.05
Corrective Action
Documents
Resulting from
Inspection
CR-
10030122, 10030162, 10030195, 10030196, 10030218
71111.21N.05
Drawings
10466-M-658-
00067-W04
Load Center & Motor Generator Sets Room
Auxiliary Building El 2026' 0"
March 16,
1983
71111.21N.05
Drawings
M-0023, sheet 1
P&ID Fire Protection System (FP)
71111.21N.05
Drawings
M-0023, sheet 2
P&ID Fire Protection System (FP)
71111.21N.05
Drawings
M-0140
Piping Penetrations Circulation Water Screenhouse
71111.21N.05
Drawings
M-12KC01
P&ID Fire Protection Turbine Building
71111.21N.05
Drawings
M-12KC02
P&ID Fire Protection System
71111.21N.05
Drawings
M-12KC03
P&ID Fire Protection System
71111.21N.05
Drawings
M-12KC05
P&ID Fire Protection System
71111.21N.05
Drawings
M-12KC06
P&ID Fire Protection Halon System
71111.21N.05
Drawings
M-1X1924
Auxiliary Building Penetration Closure Wall Elevation
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Sheet 24
71111.21N.05
Drawings
M-650A-00047,
sheet 1
Lower Cable Spreading Area El 2023' 0" Pre-action
System
71111.21N.05
Drawings
M-663-00017
Penetration Seal Typical Details
W23
71111.21N.05
Drawings
M-663-00017A
Fire Protection Evaluations for Unique or Unbounded
Fire Barrier Configurations
W08
71111.21N.05
Drawings
NEIL-PXX-062
Nuclear Electric Insurance Limited General
Arrangement Insurance Plan
71111.21N.05
Engineering
Changes
20430
Enertech Nozzle Check Valve Model DRV-Z Helical
Spring
71111.21N.05
Engineering
Changes
20447
Diesel-Driven Fire Pump Engine - Fuel in Oil Resolution
71111.21N.05
Engineering
Changes
20479
Install Seal in Penetrations P135W2195 & 2196
71111.21N.05
Engineering
Changes
20480
Removal of Fire Hoses from Hose Houses
71111.21N.05
Engineering
Evaluations
E-1F9915
Design Basis Document for OFN RP-017, Control Room
Evacuation
71111.21N.05
Engineering
Evaluations
WCNOC PSA-
067
Internal Fire - Qualitative Screening, Quantitative
Screening and Quantification Notebook
71111.21N.05
Miscellaneous
230112-TIME_CRITICAL-19605598-1
January 16,
23
71111.21N.05
Miscellaneous
230112-TIME_CRITICAL-19605601-1 _1
January 16,
23
71111.21N.05
Miscellaneous
230110-TIME_CRITICAL-19580671-1
January 10,
23
71111.21N.05
Miscellaneous
Fire Protection Program Regulatory Bases
71111.21N.05
Miscellaneous
24
Technical Specification for Fire Protection System for
Wolf Creek Generation Station
71111.21N.05
Miscellaneous
2
Specification for Circulation Water Screenhouse and
Discharge Structure
AM10
71111.21N.05
Miscellaneous
ANSI B31.1 -
1973 edition
and Summer
Power Piping
1973, 1976
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1976 addenda
71111.21N.05
Miscellaneous
APF 10-103-04
Hourly Fire Watch Permit Log
June 12, 2023
71111.21N.05
Miscellaneous
M-10KC
System Description Fire Protection System (KC & FP)
71111.21N.05
Miscellaneous
296, 12299, 12330, 12341, 12343, 12996, 14660,
15609, 16659, 16826, 17458, 18074, 18502, 18616,
18669, 18707, 18727, 18746, 18760, 18767, 18796,
18821
71111.21N.05
Miscellaneous
Response Plan
Corroded Fire Protection Pipe 1FP003BA-12 at CWSH
February 27,
24
71111.21N.05
Miscellaneous
Terracon
Project No.
2117086
Limited Site Investigation Report
September 27,
2011
71111.21N.05
Miscellaneous
NP
Operator Time Critical Action Program Standard
71111.21N.05
Miscellaneous
WCLR-13
Fuel Oil Chemistry B2,1,14
71111.21N.05
Miscellaneous
WCLR-14
Fire Water System B2.1.13
71111.21N.05
Miscellaneous
WCLR-15
Fire Protection B2.1.12
71111.21N.05
Miscellaneous
WCLR-34
Buried Piping and Tanks Inspection B2.1.18
71111.21N.05
Miscellaneous
WR 01698-89
Engineering Disposition
April 27, 1989
71111.21N.05
Miscellaneous
WR 02641-88
Engineering Disposition
March 10,
1989
71111.21N.05
Procedures
AI 10-001
Fire Brigade Equipment Inventory, Maintenance and
Cleaning
13B
71111.21N.05
Procedures
AI 21-016
Operator Time Critical Actions Validation
14, 15, 16, 17,
18, 19, 20, 21,
2, 23, 24, 25
71111.21N.05
Procedures
AI 21-017
Timed Fire Protection Actions Validation
10B
71111.21N.05
Procedures
AP 10-100
71111.21N.05
Procedures
AP 10-101
Control of Transient Ignition Sources
71111.21N.05
Procedures
AP 10-102
Control of Combustible Materials
71111.21N.05
Procedures
AP 10-103
Fire Protection Impairment Control
71111.21N.05
Procedures
AP 10-106
Fire Preplans
71111.21N.05
Procedures
AP 10-109
Fire Protection Inspections
9A
71111.21N.05
Procedures
AP 21-004
Operator Response Time Program
5A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Procedures
License Renewal Implementation
0A
71111.21N.05
Procedures
MCM XP-001
Pump Packing Adjustment
71111.21N.05
Procedures
OFN RP-017
Control Room Evacuation
49A, 50, 51,
2, 53, 54, 55,
71111.21N.05
Procedures
STN FP-202
Yard Loop, Hydrant Flush & Hydrant Inspection
71111.21N.05
Procedures
STN FP-204
Fire Protection System C-Factor Test
71111.21N.05
Procedures
STN FP-206
Spray and Sprinkler System Function Testing - Wet Pipe
71111.21N.05
Procedures
STN FP-208
Hose Rack Visual Inspection
10B
71111.21N.05
Procedures
STN FP-209
Fire Pump Performance and Sequential Start Test
71111.21N.05
Procedures
STN FP-210
Hose Rack Visual Inspection Reactor Building
71111.21N.05
Procedures
STN FP-211
Diesel Fire Pump 1FP01PB Monthly Operation and Fuel
Leven Check
71111.21N.05
Procedures
STN FP-216
Spray and Sprinkler Functional Testing - Pre-Action
71111.21N.05
Procedures
STN FP-225
Fire Barrier Inspection
71111.21N.05
Procedures
STN FP-400C
Halon Sys/Control Cab. Load Center/M.G. Sets Rm
(KC-225)
9B
71111.21N.05
Procedures
STN FP-404A
Halon Main Bank Tank Weight and Pressure Checks
71111.21N.05
Procedures
STN FP-411
Fire Pump (Diesel) Battery Inspection
8C
71111.21N.05
Procedures
STN FP-412
Fire Pump (Diesel) Battery and Electrical Termination
Check
7E
71111.21N.05
Procedures
STN FP-431
Fire Hose Station Valve Operability and Hose
Replacement/Hydro
71111.21N.05
Procedures
STN FP-432
Containment Building Fire Hose Station Valve
Operability and Hose Replacement
7A
71111.21N.05
Procedures
STN FP-600
Fire Pump Diesel Fuel Storage Tank
71111.21N.05
Procedures
STN FP-817A
Trip Act. Device Oper. Test For Bechtel Zones 100, 103,
104, 105, 106, 107, 112, 113 and 114
11C
71111.21N.05
Procedures
STN FP-817F
Trip Act. Device Oper. Test for Bechtel Zones 306, 307
and 314-317
8B
71111.21N.05
Procedures
STN KC-208
Hose Rack Visual Inspection (Balance of Plant)
11A
71111.21N.05
Procedures
SYS FP-280
Temporary Diesel Fire Pump Installation and Removal
71111.21N.05
Procedures
SYS FP-290
Temporary Diesel Fire Pump Operations
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Work Orders
11-344879-000, 12-361269-000,
13-366877-000, 14-390203-000,
16-418842-000, 17-422828-000,
17-427766-070, 17-427919-000,
17-434751-000, 18-434832-000,
18-438968-000, 19-448843-000,
19-450243-000, 19-453258-000,
20-457452-005, 20-458272-000,
20-459743-000, 20-460511-000,
20-461722-000, 21-468506-000,
21-469299-000, 21-470489-000,
21-474041-000, 21-476631-000,
21-476636-000, 22-476973-000,
2-477446-000, 22-477639-000,
2-477651-000, 22-478338-000,
2-479773-000, 22-479783-000,
2-480139-000, 22-480182-000,
2-480182-000, 22-480514-000,
2-481003-000, 23-404785-000,
23-483628-000, 23-484780-000,
23-487116-000, 23-487421-000,
23-488552-000