Category:Inspection Plan
MONTHYEARIR 05000482/20254012025-01-22022 January 2025 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000482/2025401 ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 IR 05000482/20220062023-03-0101 March 2023 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2022006) ML22321A2662022-11-16016 November 2022 January 2023 Emergency Preparedness Program Inspection - Request for Information IR 05000482/20220052022-08-23023 August 2022 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2022005) ML22215A2742022-08-0202 August 2022 Inservice Inspection Request for Information ML22249A2552022-06-29029 June 2022 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000482/2022012 ML22130A7662022-05-10010 May 2022 Notification of Inspection (NRC Inspection Report 05000482/2022003) and Request for Information IR 05000482/20224012022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 ML22123A2702022-05-0303 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000482/2022401 IR 05000482/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000482/2021006) ML22025A3612022-01-21021 January 2022 PI&R RFI Final ML22019A0932022-01-19019 January 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000482/2022002) and Request for Information ML21322A2952021-11-19019 November 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000482/2022001 and Request for Information ML21237A5212021-09-0101 September 2021 Wc Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21132A1032021-05-12012 May 2021 Document Request List, Paperwork Reduction Act Statement ML21123A0412021-05-0505 May 2021 Notification of NRC Design Bases Assurance Inspection (Teams) (05000482/2021010) and Initial Request for Information IR 05000482/20190062021-03-0303 March 2021 Annual Assessment Letter (Report 05000482/2019006) ML21061A3412021-02-25025 February 2021 Request for Information: Wolf Creek Nuclear Station, Dated February 11, 2021, Inspection Report 05000482/2021002 Occupational Radiation Safety Inspection-1, 2, PI ML21026A1982021-01-26026 January 2021 Inservice Inspection Request for Information ML20104C1472020-04-13013 April 2020 Notification of Inspection (NRC Inspection Report 05000482/2020003) and Request for Information ML20099G9422020-04-0808 April 2020 Notification of NRC Biennial Problem Identification and Resolution Inspection (05000482/2020010) and Initial Request for Information ML20055E1132020-03-0303 March 2020 WC2019006 Annual Assessment Letter ML20024D7072020-01-24024 January 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000482/2020011) and Initial Request for Information IR 05000482/20190052019-08-30030 August 2019 Updated Inspection Plan for Wolf Creek Generating Station, Report 05000482/2019005 ML19158A0782019-06-0505 June 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2019003) and Request for Information IR 05000482/20180062019-03-0404 March 2019 Annual Assessment Letter for Wolf Creek Report 05000482/2018006) ML19043A9462019-02-12012 February 2019 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000482/2019002) and Request for Information IR 05000482/20180052018-08-31031 August 2018 Updated Inspection Plan for Wolf Creek Generating Station, Unit 1, (Inspection Report 05000482/2018005) IR 05000482/20170062018-03-0101 March 2018 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2017006) ML17311A5182017-11-0101 November 2017 Notification of NRC Inspection of Implementation of Mitigation Strategies Assessment Plans (05000482/2018008) and Request for Information IR 05000482/20170052017-08-28028 August 2017 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2017005) IR 05000482/20160062017-03-0101 March 2017 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016006) IR 05000482/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) ML16237A0732016-08-31031 August 2016 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005) IR 05000482/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Reports Number 05000482/2016401) ML16085A0532016-03-25025 March 2016 Operating Corp - Notification of NRC Triennial Heat Sink Performance Inspection (05000482/2016002) and Request for Information IR 05000482/20150062016-03-0202 March 2016 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015006) IR 05000482/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2015005) ML15015A1712015-01-0808 January 2015 Focused Baseline Inspection at the Wolf Creek Site for a Major Essential Service Water Modification IR 05000482/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Report Number 05000482/2014402) IR 05000482/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2014006) ML14231A0682014-08-19019 August 2014 Notification of Inspection (NRC Inspection Report 05000482-14-005) and Request for Information ML14063A6282014-03-0404 March 2014 Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482/2013001) 2025-01-22
[Table view] Category:Letter
MONTHYEARIR 05000482/20243012025-01-30030 January 2025 Notification of NRC Initial Operator Licensing Examination 05000482/2024301 ML25023A0442025-01-24024 January 2025 Acknowledgement of Response to U.S. Nuclear Regulatory Commission Inspection Report 05000482/2024003 and Disputed Non Cited Violation IR 05000482/20254012025-01-22022 January 2025 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000482/2025401 ML25010A3692025-01-14014 January 2025 Regulatory Audit in Support of Review of License Amendment and Exemption Requests for Risk-Informed Resolution to GSI-191 ML25006A0942025-01-0606 January 2025 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24366A1612024-12-31031 December 2024 Operating Corporations (Wcnocs) Contest Response to Non-Cited Violation 2024003-01 - NRC Inspection Report 05000482/2024003 IR 05000482/20240142024-12-17017 December 2024 Comprehensive Engineering Team Inspection Report 05000482/2024014 ML24352A4382024-12-17017 December 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Commissioners ML24352A0322024-12-17017 December 2024 Notification of Post Approval Site Inspection for License Renewal and Request for Information ML24347A0122024-12-12012 December 2024 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 05000482/LER-2024-002-01, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-12-11011 December 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve IR 05000482/20244022024-12-0505 December 2024 Security Baseline Inspection Report 05000482/2024402 ML24337A1232024-12-0202 December 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 239 ML24337A0132024-12-0202 December 2024 Cycle 27 Core Operating Limits Report, Revision 1 ML24332A1262024-11-27027 November 2024 Notice of Intent to Contest Non-Cited Violation (NCV) 05000482/2024003-01, and Request for Additional Time to Provide Wolf Creek Nuclear Operating Corporation’S (WCNOC) NCV Response ML24306A2192024-11-0101 November 2024 Results of the Steam Generator Tube Inservice Inspection During the 26th Refueling Outage to Reflect TSTF-577 Reporting Requirements ML24295A3792024-11-0101 November 2024 Integrated Inspection Report 05000482/2024003 IR 05000482/20240032024-11-0101 November 2024 Integrated Inspection Report 05000482/2024003 IR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report 2025-01-06
[Table view] |
See also: IR 05000482/2025012
Text
October 09, 2024
Cleve Reasoner, Chief Executive Officer
and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp
P.O. Box 411
Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION - NOTIFICATION OF COMMERCIAL
GRADE DEDICATION INSPECTION (05000482/2025012) AND REQUEST FOR
INFORMATION
Dear Cleve Reasoner:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the commercial grade dedication baseline inspection at Wolf Creek Generating
Station, beginning on March 24, 2025. The inspection team will be composed of three personnel
from the NRC Region IV office. The inspection will be conducted in accordance with NRC
inspection procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated February 16,
2023.
The inspection will evaluate the implementation of Wolf Creek Generating Stations process for
dedicating commercial grade items, as required in applicable portions of Appendix B to Title 10
of the Code of Federal Regulations Part 50, to ensure reasonable assurance is provided that
these items will perform their intended safety function. Additionally, this inspection will evaluate
implementation of Wolf Creek Generating Stations procurement process for safety-related
structures, systems, and components, as required in Appendix B.
The inspection will include an onsite information gathering visit by the team lead and two weeks
of onsite inspection by the team. The schedule for the inspection is as follows:
Onsite Information Gathering Visit: January 6 - 10, 2025
Offsite Preparation Week: March 17 - 21, 2025
Onsite Inspection Weeks: March 24 - 27, 2025 and April 7 - 10, 2025
The purpose of the information gathering visit is to meet with your staff to become familiar with
the process for dedicating commercial grade items and the process for procuring safety-related
structures, systems, and components at Wolf Creek Generating Station. A high-level
presentation of site-specific commercial grade dedication and safety-related procurement
activities would be beneficial. This visit may include a tour of onsite commercial grade item
dedication facilities, receipt inspection facilities, storage facilities, and installed plant
components associated with potential inspection samples. During the visit, the team lead will
also review the information provided in the initial information request to select a list of potential
C. Reasoner
2
inspection samples. The team lead may also identify other information needed to support the
inspection during this visit.
To minimize the impact on your staff and to ensure an effective and efficient inspection, we
have enclosed two separate requests for information needed prior to the onsite information
gathering visit and offsite inspection preparation week. The first request (Enclosure 1) is
generally for information that will be used to choose the inspection samples or information that
will be applicable to all inspection samples throughout the inspection. This information should be
made available to the team lead prior to the information gathering visit. The second request
(Enclosure 2) is for information that is specific to an individual sample and should be made
available prior to the offsite preparation week.
Additional information requests, interviews with your staff, and/or walkdowns of facilities or
installed plant components will be made by the team throughout the inspection to complete their
review of the selected inspection samples. It is important that all documentation provided to the
team is complete and upto-date to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an
efficient inspection, we request that a contact individual be assigned to each inspector to ensure
information requests, questions, and concerns are addressed in a timely manner.
We understand that Mr. Joshua Turner from your Regulatory Affairs organization is our contact
for this inspection. If there are any questions about the inspection or the information requested,
please contact the team lead, Mr. Fabian Thomas, by telephone at 817-200-1126 or by email at
Fabian.Thomas@nrc.gov. Enclosure 3 contains additional contact information for the inspection
team.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, under Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC rules and practices, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC public document
room or from the publicly available records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC website.
Sincerely,
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Signed by Gaddy, Vincent
on 10/09/24
C. Reasoner
3
Docket No. 05000482
License No. NPF-42
Enclosures:
1.
Documents Requested Prior to
Information Gathering Visit
2.
Documents Requested Prior to
Inspection Preparation Week
3.
Inspection Team Contact Information
cc w/ encl: Distribution via LISTSERV
ML24283A075
X
SUNSI Review
X
Non-Sensitive
Sensitive
X
Publicly Available
Non-Publicly Available
OFFICE
RI:DORS /EB1
BC:DORS/EB1
NAME
FThomas
VGaddy
SIGNATURE
/RA/
/RA/
DATE
10/09/24
10/09/24
Enclosure
Documents Requested Prior to Information Gathering Visit
The documents and information requested below should generally be made available to the
inspection team for the team's use both onsite and offsite during the information gathering visit.
Electronic format is the preferred media. If electronic media is made available via an internet
based remote document management system, then the remote document access must allow
inspectors to download, save, and print the documents in the NRC's regional office. Electronic
media on compact disc or paper records (hardcopy) are acceptable. At the end of the
inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all the
listed documents. In addition, your plant-specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
Documents requested by December 23, 2024:
1.
Copy of procedures for dedicating commercial grade items/services, procuring
safety-related structures, systems, and components (SSCs), performing receipt
inspections, controlling counterfeit, fraudulent, and suspect items, and 10 CFR Part
21 evaluations and reporting.
2.
Sortable list of commercial grade items/services that completed the dedication
process within the past six years. These items/services may have been dedicated by
Wolf Creek Generating Station or by a vendor (or other licensee) and procured by
Wolf Creek Generating Station. Include, as applicable, relevant information such as
the item/services material/catalog identification number and description, parent/host
equipment identification number and description, purchase order number, installation
work order/job number, and date of issue/installation.
3.
Sortable list of SSCs that were procured as safety-related within the past six years.
Include, as applicable, relevant information such as the SSCs material/catalog
identification number and description, parent/host equipment identification number
and description, purchase order number, installation work order/job number, date of
issue/installation, and end-use safety classification.
4.
Sortable list of dedicated commercial grade items/services or procured safety-related
SSCs that were placed on hold within the past six years because of concerns
identified during receipt, dedication, or from operating experience or the corrective
action program as applicable.
5.
Sortable list of dedicated commercial grade items/services or procured safety-related
SSCs, with a brief description, where dedication/procurement activities were
expedited within the past six years.
6.
Sortable list of dedicated commercial grade-items/services or procured safety-related
SSCs that failed after completing dedication/procurement activities or required
corrective maintenance within the past six years.
2
7.
Sortable list of corrective action program documents, with a brief description, related
to commercial grade item/service dedication, safety-related SSC procurement,
receipt inspection, and storage activities within the past six years.
8.
Copy of any self-assessments or audits of commercial grade item/service dedication
and/or safety-related SSC procurement activities performed within the past six years.
9.
Copy of the updated final safety analysis report, operational quality assurance
program description, technical specifications, and technical requirements manual,
including applicable bases documents.
10.
Sortable list of systems, including identifying designators and corresponding names.
11.
List of individuals who will be supporting the inspection and their contact information.
Enclosure 2
Documents Requested Prior to Inspection Preparation Week
For the samples identified by the team lead, the documents and information requested below
should generally be made available to the inspection team for the team's use both onsite and
offsite during the inspection. Electronic format is the preferred media. If electronic media is
made available via an internet based remote document management system, then the remote
document access must allow inspectors to download, save, and print the documents in the
NRC's regional office. Electronic media on compact disc or paper records (hardcopy) are
acceptable. At the end of the inspection, the documents in the team's possession will not be
retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all the
listed documents. In addition, your plant-specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below for
each sample.
Documents requested by March 10, 2025:
1.
Complete commercial grade item dedication package including relevant
documentation such as the following, as applicable: description of item/service,
identification of safety functions and safety classifications of item/parent component,
like-for-like or equivalency evaluations, credible failure modes/failure modes and
effects analysis, critical characteristics and acceptance criteria, identification of the
suppliers commercial quality assurance program or other documented controls.
2.
Complete purchase order including relevant documentation such as the following, as
applicable: purchase requisition, catalog specifications, item product data
sheets/vendor manuals, shelf-life information, service/qualified life information,
certificates of conformance/compliance/quality, vendor test and inspection reports,
third-party or sub vendor test and inspection results, vendor dedication or partial
dedication information, material receiving reports, packing list/invoices or other
shipping documents, and other pertinent vendor/licensee correspondence.
3.
Receipt inspection reports and any related test reports, documents noting any
deviations from design, material, and performance characteristics relevant to the
safety function (nonconformance dispositions).
4.
Documents showing objective evidence of special test and inspection procedures
used to verify technical and quality requirements have been met, commercial grade
survey reports, or source verification reports; any other documents to trace the item
from the time it was dedicated to the time it was installed, tested, and accepted.
5.
Completed installation work orders and stock or material issue forms; completed
post-installation test procedures and results.
6.
Design basis information of the inspection sample or parent/host component such
as: normal/accident service environment, normal/accident performance
2
requirements, design basis document/system description, relevant UFSAR/technical
specification sections, calculation/drawing/procedure updates, etc.
7.
10 CFR 50.59 documentation, if required.
8.
Sortable list of corrective action program documents, with a brief description,
associated with the inspection sample or parent/host equipment.
Enclosure 3
Inspection Team Contact Information
Fabian Thomas (Lead)
Reactor Inspector
817-200-1126
Fabian.Thomas@nrc.gov
Dustin Reinert
Senior Reactor Inspector
817-200-11534
Dustin.Reinert@nrc.gov
Joshua Talavera
Reactor Inspector
817-200-1435
Joshua.Talavera@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Fabian Thomas
1600 East Lamar Blvd.
Arlington, TX 76011-4511