ML17137A396
| ML17137A396 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/09/2017 |
| From: | Hafenstine C Wolf Creek |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RA 17-0063 | |
| Download: ML17137A396 (2) | |
Text
wa.FCREEK
'NUCLEAR OPERATING CORPORATION Cynthia R. Hafenstine Manager Nuclear and Regulatory Affairs U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 May 9, 2017 RA 17-0063
Subject:
Docket No. 50-482: Summary of Changes to a Procedure that Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP)
To Whom It May Concern:
One procedure that implements the WCGS RERP has been revised. The revised document is identified below:
Procedure AP 06-004, Rev. 5 Effective Date May 2, 2017 The attached summary of the changes to the implementing procedure explains that these changes do not reduce the effectiveness of the WCGS RERP.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
CRH/rlt Attachment cc:
K. M. Kennedy (NRC), w/a B. K. Singal (NRC), w/a N. H. Taylor (NRC), w/a c;~ffeµ~
Cynthia R. Hafenstine Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 I Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
Attachment to RA 17-0063 Page 1 of 1 Summary of Changes to One Procedure that Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP)
- 1. Procedure AP 06-004, "Equipment Important to Emergency Response," Rev. 5 The thermocouple subcooling monitor cabinets, asset numbers RP081A and RP081 B, have been added to the table of Equipment Important to Emergency Response on page 10 of 22 in Attachment C to procedure AP 06-004. Monitoring of the core exit thermocouples (CETs) has been added as an additional compensatory measure for the containment high range area radiation monitors, asset numbers GTRE0059 and GTRE0060, on pages 6 of 22 and 7 of 22 in Attachment C to procedure AP 06-004.
Additional editorial changes were made to change "HP" to "RP" throughout the procedure, correct spelling errors and restore notes to Figure 2, which were inadvertently deleted in a previous revision. The changes to procedure AP 06-004 support accurate identification and implementation of compensatory measures for equipment important to emergency response and the restoration of that equipment.
Therefore, these changes do not reduce the effectiveness of the WCGS RERP.