SEP 2 2 1908
Docket Nos. 50-321 and 50-366
Georgia Power Company
/ ATTN: Mr. W. G. Hairston, III
Senior Vice President-
Nuclear Operations
P.O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT N05. 50-321/88-24 AND 50-366/88-24)
This refers to the Nuclear Regulatory Commission (NRC) inspections conducted
by Messrs. J. Menning and R. Musser on July 23 - August 19,1988, and by
Mr. M. Ernstes on August 22-24, 1988.
The inspections included a review of
activities authorized for your Hatch facility.
At the conclusion of the
inspections, the findings were discussed with those members of war staff
identified in the enclosed Inspection Report.
Areas examined during the inspections are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities violated NRC
requirements.
Two violations, references to pertinent requirements, and
elements to be included in your response are presented in the enclosed Notice
of Violation.
However, because all of the criteria for categorization of
licensce-identified violations were met in some instances, the remaining four
violations are not being cited.
The details pertaining to these
licensee-identified violations are described in the enclosed Inspection
Report.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Roem.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
$$k $fyss
2
s
im
~
' . -
%.*
.
,
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL OGl,TD 3Y
V!T:0,'l L. CROV, NLEE
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
gc w/encls:
W . P. Mcdonald, Executive Vice President,
Nuclear Operations
d T. Beckham, Vice President, Plant Hatch
J ; C. Nix, General Manager, Plant Hatch
J i M. Fraser, Site Quality Assurance
, Manager
vi.. T. Gucwa, Manager Licensing
and Engineering, Plant Hatch
v5. D. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bec w/encis:
Uf . P. Crocker, NRR
,
V. Sinkule, RII
M C Resident Inspector
DRS, Technical Assistant
Document Control Desk
LTroc[ine:tj
h
MSinkule
'
09/M/88
09/g/88