Advises of Completion of Review of 831107 & 850329 Responses to Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Re Preventive Maint & Trending of Parameters.Responses Acceptable
ML20137R137
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/12/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Williams J
TOLEDO EDISON CO.
Shared Package
ML20137R142 List:
References
GL-83-28, TAC-53120, NUDOCS 8512050435
Download: ML20137R137 (2)


Text

,

,- 'Novemb;r 12, 1985 g g g Docket No. 50-346- DISTRIBtl TION NRomney AC -1 L PDR Ringram Mr. Joe Williams, Jr. ORB #4 Rdg GDick Vice President, Nuclear SIThompson ADe Agazio Toledo Edison Company OELD WPaulson Edison Plaza - Stop 712 EJordan GEdison 300 Madison Avenue BGrimes Gray File Toledo, Ohio 43652

Dear Mr. Williams:

SUBJECT:

RESPONSE TO GENERIC LETTER 83-28, ITEMS 4.2.1 AND 4.2.2,

, DAVIS-BESSE NUCLEAR POWER STATION The staff has reviewed the following portions of Toledo Edison's response to Generic Letter 83-28:

o Reactor Trip System Reliability (Preventive Maintenance), Item 4.2.1 o ' Reactor Trip System Reliability (Trending of Parameters), Jtem 4.2.2 Toledo Edison's response to the above items were transmitted by letters dated

-November 7, 1983 (Serial No. 1000) and March 29, 1985 (Serial No. 1130).

Following review of the documents cited, we have concluded that: 1) the preventive maintenance program includes the major elements identified by the staff-and will be conducted at an interval not to exceed 12 months; and

~ 2) the trending of parameters is being accomplished through participation with-the B&W Owners Group Reliability Monitoring Program. Based on the conclusions previously listed, we _have determined that the responses to items 4.2.1 and 4.2.2 of Generic Letter 83-28 are acceptable.

Sincerely,

".celoImL gIoy :p g

- J0tm F. 370gg;s John F; Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page 0 :DL *DL EQ E

cf JS RLc.6Ap

/85 11 g/8 - 11/17./85

~

8512050435 B51112 PDR ADOCK 05000346 s p PDR

i l

Mr. J. Williams Davis-Besse Nuclear Power Station Toledo Edison Company Unit No. I cc:

Donald H. Hauser. Esq. Ohio Department of Health The Cleveland Electric ATTN: Radiological Health l Illuminating Company Program Director i P. O. Box 5000 P. O. Box 118 Cleveland, Ohio 44101 Columbus, Ohio 43216 Mr. Robert F. Peters Attorney General l Manager, Nuclear Licensing Department of Attorney .

I Toledo Edison Company General Edison Plaza 30 East Broad Street 300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 Mr. James W. Harris Director Gerald Charnoff, Esq. Division of Power Generation Shaw, Pittman, Potts Ohio Department of Industrial Relations and Trowbridge 2323 West 5th Avenue 1800 M Street, N.W. P. O. Box 825 Washington, D.C. 20036 Columbus, Ohio 43216 Paul M. Smart, Esq. Mr. Harold Kohn, Staff Scientist Fuller & Henry Power Siting Commission 300 Madison Avenue 361 East Broad Street P. O. Box 2088 Columbus, Ohio 43216 Toledo, Ohio 43603 Mr. Robert B. Borsum President Board of Babcock & Wilcox Ottawa County Nuclear Power Generation Port Clinton, Ohio 43452 Division Suite 200, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector U.S. Nuclear Regulatory Commission 5503 N. State Route 2 Oak Harbor, Ohio 43449 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

<