Informs That Operator & Senior Operator Written & Oral Exams Scheduled for Wk of 851118.Description of Requirements for Conducting Exams Encl.License Applications Requested 60 Days Prior to First Exam Date
ML20133J649
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/15/1985
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8510210014
Download: ML20133J649 (3)


Text

, s OCT 151985 Docket No. 50-373 Docket No. 50-374 Comonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690

Dear Mr. Reed:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. Sam Harmon, Training and Mr. Larry Dimmock, Operator Licensing, arrangements were made for the administration of examinations at the LaSalle County Nuclear Station.

The written and oral examinations are scheduled for the week of November 18, 1985.

Mr. Harmon has been advised of our reference material requirements, the number of reference material sets that are required, and the examiners' names and addresses where each set is to be mailed.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations.

Enclosure 1, " Administration of Operator / Senior Operator Licensing Written Examinations," describes our requirements for conducting these examinations.

Mr. Hannon has also been infonned of these requirements.

. All operator and senior license applications should nonnally be submitted at least 60 days prior to the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments af ter candidate eligibility has been determined. If the applications are not received at least 30 days prior to the examination dates it is likely that a postponement will be necessary.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires June 30, 1986.

Coments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.

8510210014 85101S POR ADOCK 05000373 y PDR l$$

. ~

j

. OCT 151985 Commonwealth Edison Company 2 L

Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact J. I. McMillen at 312-790-5559.

i Sincerely, gicittM. SIGED W l' b Luis A. Reyes, Chief Operations Branch

Enclosures:

l 1. Administration of Operator Licensing Written Examinations cc w/ enclosure:

D. L. Farrar, Director of Nuclear Licensing i

G. J. Diederich, Plant i

Manager DCS/RSB (RIDS) t Licensing Fee Management Branch '

Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division Ron Crawford, Plant Training Manager cc w/o enclosures:

A. Bournia, Project Manager, NRR Bruce Boger, Branch Chief, OLB

, r F

9

[

RIII RII

^

L.D.

Dinnock/lc n A'yes l 1

10/8/85 4 y#), f/

/C 0

_ - _ . - - .- . - . _ - .. = -

+

ENCLOSURE 1 i

! Administration of Reactor / Senior Reactor Operator i Licensing Written Examinations Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

i The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor 3

personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at '

a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.  ;

i r

! 2. Minimum spacing is required to ensure exam integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3 foot spacing between tables. No wall charts, models, and/or other training materials shall be present in the examination room.

. 3. Suitable arrangements are to be made by the facility if the candidates are to have lunch, coffee, etc. These arrangements shall comply with

Item 1 above. These arrangements will be reviewed by the examiner ,

and/or proctor.

4. A copy of the written examination and answer key shall be given to the utility training department af ter the last candidate has turned in his completed examination. The utility will then have until the end of the exam week to provide coments and supporting documentation to suggest changes or corrections to the examination and answer key. The utility ,

maj provide these comments in writing to the Chief Examiner before he '

leaves the site or forward them to the Operator Licensing Section Chief in the appropriate regional office.

l I 5. The licensee will provide pads of 8-1/2 x 11" lined paper in unopened l packages for each candidate's use in completing the examination. The  !

examiner will distribute these pads to the candidates. All reference  !

material needed to complete the examination will be furnished by the j i

examiner. Candidates can bring pens, pencils, calculators or slide rules  !

into the examination room and no other equipment or reference material is allowed.  !

6. Only black ink or dark pencils should be used for writing answers to l questions. i l

t

]