ML20155E147

From kanterella
Revision as of 21:22, 9 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Advises That Info Contained in 880411 & 0908 Ltrs Re Use of Instrumented Insp Technique (IIT) Represents Acceptable Alternative Testing Method as Discussed in Topical Rept on IIT Evaluated & Approved by
ML20155E147
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/28/1988
From: De Agazio A
Office of Nuclear Reactor Regulation
To: Shelton D
TOLEDO EDISON CO.
References
DB-88-055, DB-88-55, TAC-69084, NUDOCS 8810120144
Download: ML20155E147 (2)


Text

__ _ ______

. s,'

. September 28, 1988 Docket do. 50-346 DISTRIBUTION: l Serial No. DB-88-055 %N NRC & Local PDRs l PDIII-3 r/f JHannon l Mr. Donald C. Shelton MVirgilio PKreutzer Vice President, Nuclear ADeAgazio OGC-WF1 Toledo Edison Company EJordan BGrimes Edison Plaza - Stop 712 CYCheng ACRS(10) 300 Madison Avenue PDIII-3 Gray Toledo, Ohio 43652

Dear Mr. Shelton:

SUBJECT:

INSTRUMENTED INSPECTION TECHNIQUE USAGE By letters dated April 11,1988 (Serial No.1486) and September 8,1988 (Serial No. 1582) Toledo Edison Company submitted information and drawings concerning the use of the Instrumented Inspection Technique (IIT) during pressure tests at the Davis-Besse Nuclear Power Station, Unit No.1. The letters and attachment identify the systems on which the IIT will be applied and provide a discussion of the methodology to be used.

The staff has reviewed the information contained in the subject letters and finds the application of the IIT at the Davis-Besse Station represents an acceptable alternative testing method as discussed in the topical report on the IIT that was evaluated and approved by letter dated November 7,1985.

Sincerely, b.

l Albert W. De Agazio, Sr. Project Manager l Project Directorate III-3 Division of Reactor Projects - III, !Y, V & Special Projects '

cc:

See next page C

SSN Office: LA/PDIEI-3 PM/PDI I-3 EME

,C A

M W)

PD/PDIII-3 Surname: PKrd6Mbr ADeAgaziu/tg Date:

C1C k M Hannon

/88 /88 'f/ 88 47/g&'88

// 7 9810120144 880928 0k %,

DR ADOCK0500g46

r

. o.c ., '  :

g O Mr. Donald C. Shelton Davis-Besse Nuclear Power Station Toledo Edison Company Unit No. 1 CC' David E. Burke Esq.

The Cleveland Electric Radiolugical Health Program <

Illuminating Company Ohio Department of Health P. O. Box 5000 1224 Kinnear Road Cleveland, Ohio 44101 Columbus, Ohio 43212 Mr. Robert W. Schrauder Attorney General Manager, Nuclear Licensing Department of Attorney Toledo Edison Company General Edison Plaza 30 East Broad Street 300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 Mr. James W. Harris, Director Gerald Charnoff, Eso. (AddresseeOnly) i Shaw, Pittman, Potts Division of Power Generation ,

and Trowbridge Ohio Department of Industrial Relations '

2300 N Street N.W. 2323 West 5th Avenue Washington, D.C. 20037 P. O. Box 825 Columbus, Ohio 43216 Regional Administrator, Region 131 U.S. Nuclear Regulatory Comission Ohio Envirorental Protection Agency )

799 Roosevelt Road 361 East Broaa Street l

Glen Ellyn Illinois Columbus, Ohio 43266-0558

) President, Board of i Mr. Robert B. Borsum County Comissioners of Babcock & Wilcox Ottawa County Nuclear Power Generation Division Port Clinton, Ohio 43452 Suite 525, 1700 Rockville Pike Rockville, Maryland 20852 -

State of-Ohio' Public utilities Comission Resident Inspector 180 East Broad Street U.S. Nuclear Regulatory Comission Columbus, Ohio 43266-0573 l 5503 N. State Route 2 i Oak Harbor. Ohio 43449 l

i l

i

_