Forwards Safety Insp Rept 50-271/86-25 on 861104-1231 & Notice of Violation.Deferral of Insp of Four RHR Pumps Unjustified.Licensee Should Proceed W/Commitments Made in
ML20210V560
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/06/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20210V563 List:
References
NUDOCS 8702190055
Download: ML20210V560 (2)


See also: IR 05000271/1986025

Text

_

c

  • b

.

FEB 0 01987

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject: Inspection Report No. 50-271/86-25

This refers to the routine resident safety inspection conducted by Mr. W. J. Raymond

of this office on November 4 - December 31, 1986, at the Vermont Yankee Nuclear

Power Station, Vernon, Vermont. The inspection consisted of observation of activi-

ties, interviews with personnel and document reviews. The results of the inspec-

tion are described in the NRC Region I Inspection Report enclosed with this letter

and were discussed with Mr. J. P. Pelletier of your staff at the conclusion of the

inspection.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation enclosed herewith as Appendix A. The violation concerns the

failure follow the requirements of the Section XI of the 1980 Edition of ASME Code,

in that the B core spray pump was not declared inoperable on two occasions per IWP-

3230 when test results fell within the " required action" range. This violation

has been categorized by severity level in accordance with the " General Statement

of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C

(Enforcement Policy 1986).

We understand that delays in procurement of the necessary replacement parts have

caused you to defer the inspection of the four residual heat removal (RHR) puups

until March, 1987. Equipment delivery problems aside, we also understand that you

were evaluating the need to defer the completion of inspections on 2 of the 4 pumps

due to budgetary reasons. Based on our review of this matter, we see no technical

justification for deferral of the planned inspections on all four pumps. We trust

you will proceed with the planned inspection in accordance with the commitments

made in your July 11, 1986 letter to NRC:NRR as expeditiously as possible, consis-

tent with material delivery schedules. If you are planning delays in inspections

of these pumps beyond March 1987, please let me know, in writing, including the

technical basis for such delay.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice of Violation when preparing your response. In

your response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

The responses directed by this letter and the enclosed Notice are not subject to

the clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

0702190

PDH A Q R $$$$h71

ppH

G

cLo- D (,_) [

-

e

_ . . _ _ _

  1. $

..6,

Vermont Yankee Nuclear Power 2

Corporation FEB 06 W

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this

letter and the enclosure will be placed in the NRC Public Document Room.

Your cooperation with us is appreciated.

Sincerely,

Original Signed Bya

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report 50-271/86-25

cc w/encls:

Mr. R. W. Capstick, Licensing Engineer

Mr. J. Gary Weigand, President and Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.

Mr. Gerald Tarrant, Department of Public Service

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

State of Vermont

NRC Resident Inspector

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

DRP Branch Chief

M. McBride, SRI, Pilgrim

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

Robert J. Bores, DRSS