Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld
ML20209C375
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/28/1999
From: Mccue D
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC
Shared Package
ML20137W523 List:
References
NUDOCS 9907090273
Download: ML20209C375 (2)


Text

,e COPYh10LDER:

NAME OR LOCATION

/-s

)

VY IMPLEMENTING PROCEDURES TO THE E-PLAN #174 INSTRUCTION SHEET June 28, 1999 A Table of Contents is provided.

REVISIONS Please replace the following procedures:

Canceled Proc /Rev. #

DI #

Procedure Title OP 3524/16 98-436 Emer Actions to Ensure Initial Accountability / Security Response REPLACEMENT PAGES Please replace the following pages:

Proc /Rev. #

Affected Paces OP 3531/12 Pages 1, 6,

7 of 16 i

.s Transmitted By eM

(#

j l

s,

.\\\\

9907090273 990628

{DR ADOCK 05000271

>--Q PDR e pn t

L Q+b

\\

\\t): P?

('igyg,. r9ltcA L ygpap

F W NoDPR W

.c s.

TOi YN

~

VERMONT YANKEE CONTROLLED DOCUMEN TRANSMITTAL FORM

}

u}& Yo-21I SECTION 1 DOCUMENT TITLE:

IMPLEMENTING PROCEDURES TO THE E-PLAN' COPY NUMBER:

CHANGE NUMBER:

  1. 174 ISSUE DATE:

lune 28.1999 INSTRUCTIONS:

a.

Attached is an authorized controlled copy to the above listed document for retention as your assigned copy, b.

Review the revised material.

c.

Inco,porate new change into the controlled document by document issue date, if applicable.

d.

Ensure that those who use the document are aware of the change.

e.

Destroy all superseded pages.

f.

Destroy obsolete forms and insert new forms into the files.

g.

Sign and date this form and return to the Executive Secretary (ES) or Document Control Center (DCC).

h.

Complete appropriate change information on VY Controlled Document Record of Changes.

TRANSMITTED BY:

h I

/

ES or DCC Signature AFTER COMPLYING WITH THE ABOVE INSTRUCTIONS, PLEASE RETURN TO THE ES OR DCC WITHIN 10 DAYS OF THE ISSUE DATE.

SECTION 2 The ~ undersigned acknowledges completion of the preceding instructions.

Signature of Recipient:

Date:

LO90004

..,.i.

' VERMONT YANKFR EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS

-i.

r}

July 1,1999 V

Emergency Plan Classification and Action Level Scheme :

AP 3125 '

Rev.16

  • R" D usual Event OP 3500 Rev.18 "R"

Alert OP 3501 Rev.19 "R"

$!te Area Emergency

.OP 3502' Rev. 31 "R"

General Emergency OP 3503 Rev. 33 "R"

Emergency Communications OP 3504 Rev. 31 "R"

Emergency Preparedness Exercises and Drills OP 3505 Rev. 21.

"I" Emergency Equipment Readiness Check OP 3506 Rev. 37 "R"'

Emergency Radiation Exposure Contro.

OP 3507 Rev.28 "R"

On-Site Medical Emergency Procedure OP 3508 Rev. 21 "R"

1 O

Environmental Sample Collection During an Emergency OP 3509 Rev.15 "R"

l V

Off-Site and Site Boundary Monitoring OP 3510 Rev. 23 "C"

Off-Site Protective Actions Recommendations

. OP 3511 Rev.11 "R"

Evaluation of Off-Site Radiological Conditions OP 3513 Rev. 20 "R"

Emergency Actions to Ensure Accountability and OP 3524 Rev.16 "R"

Security Response Radiological Coordination OP 3525 Rev. 9 "R"

Emergency Call-In Method OP 3531 Rev.12 "R"

Emergency Preparedness Organization AP 3532 Rev. 8 "I"

Post Accident Sampling of Reactor Coolant OP 3533 Fev.4 "C"

Post Accident Sampling of Plant Stack Gaseous Releases OP 3534 Rev. 2 "C"

Post Accident Sampling and Analysis of Primary Containment OP 3535 Rev. 2

  • C" 1

-In Plant Air Sample Analysis with Abnormal Condition -

OP 3536 Rev.1 "C"

,m.

)

A#

Emergency Plan Training OP 3712 Rev.14 "1"

_..__h._.._.

_. _ - _. _ _ _ _ _ _ _, _ _ _ _ _, _ _ _. _ _ _ _,, _ _, _ _ _