Forwards from Ve Quinn to Cl Miller Forwarding IEAL-R/85-11, Vermont Yankee Nuclear Power Station Site- Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, for Info
ML20204J432
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/19/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Maret G
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20204J437 List:
References
NUDOCS 9903300092
Download: ML20204J432 (3)


Text

-.

4 March 19, 1999 Mr. Gregory A. Maret Director of Operations Vermont Yankee Nuclear Power Corporation 185 Old Ferry Road Brattleboro, W.rmont 05301

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION SITE-SPECIFIC OFFSITE RADIOLOGICAL PREPAREDNESS ALERT AND NOTIFICATION SYSTEM QUALITY ASSURANCE VERIFICATION

Dear Mr. Maret:

Enclosed is a copy of the February 10,1999 letter from Vanessa E. Quinn, Acting Chief, State and Local Regulatory and Assessment Branch of the Federal Emergency Management Agency (FEMA) to Charles L. Miller, Chief of the Emergency Preparedness and Radiatiori Protection Branch, Division of Reactor Program Management, Office of Nuclear Reactor Regulation of the NRC, which forwards the subject report. Also enclosed is a copy of the February 2,1999 letter from Kay C. Goss, Associate Director for Preparedness, Training and Exercise of FEMA to The Honorable Howard Dean, M.D., Governor of Vermont informing him of the results of the subject i

report.

A copy of this report is being forwarded to you for your information. Based upon our brief review of the report, it appears that no significant problems exist with the alert and notification system for the Vermont Yankee Nuclear Power Station. Hov'ever, based upon the fact that this report is somewhat dated, we suggest that your staff review the report for current applicability. No response is required to this letter, if you have any questions concerning the enciasures, please contact me at (610) 337-5183.

/

Sincerely, ORIGINAL SIGNED BY:

Richard J. Conte, Chief j3b Human Pe:formance and Emergency Preparedness Branch Division of Reactor Safety Docket No. 50-271

Enclosures:

As stated 9903300092 990319

~

PLR ADOCK 05000271 F

PDR 200073

G. Maret '

cc w/o encl:

R. McCullough, Operating Experience Coordinator - Vermont Yankee G. Sen, Licensing Manager, Vermont Yankee Nuclear Power Corporation D. Rapaport, Director, Vermont Public interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Hehuh, State of New Hampshire Chief, Safety Unit, Office of the Attomey General, Commonwealth of Massachusetts D. Lewis, Esquire G. Bisbee, Esquire J. Block, Esquire T. Rapone, Massachusetts Executive Office of Public Safety D. Katz, Citizens Awareness Network (CAN)

M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)

State of New Hampshire, SLO Designee State of V?rmont, SLO Designee Commonwealth of Massachusetts, SLO Designee J. Bean, Regional Director - FEMA Region i L. Canton, Regional Dire, tor - FEMA Region 11 R. Calvan, Regional Director - FEMA Region ill

G. Maret

-3 Distribution w/ encl:

Region I Docket Room (with concurrences)

PUBLIC Nuclear Safety information Center (NSIC)

DRS (EP File)

Distribution w/o encl:

J. Mitchell, OEDO E. Adensam, NRR R. Croteau, NRR R. Correia, NRR D. Screnci, PAO Inspect:on Program Branch, NRR (IPAS)

DOCDESK i

D. Barss, NRR l

NRC Resident inspector H. Miller, RA/J. Wiggins, DRA D. Screnci, PAO C. Anderson, DRP R. Summers, DRP S. Barr, DRP R. Junod, DRP W. Lanning, DRS W. Ruland, DRS R. Conte, DRS D. Silk, DRS i

DRS File 4

DOCUMENT NAME: G:\\HPEPB\\ SILK \\VYANSRPT.WPD To receive a copy of this document, indicate in the uox: "C" = Cdpy without attachtnent/ enclosure "E" = Copy with attachment / enclosure "N" = No c.opy OFFICE Rl/DRS l1/ Rl/DRS

/l l

n NAME DSilk 1JC RConte l, /

DATE 03/15/99 03ff/99/ V 03/ /99 0?, /99 03/ /99