Text
Mr. Gregory A. Mirst April 7,1000 Director of Op: rations i
V:rmont Ystnkts Nuclar Powsr Corporation q;
185 Old Ferry Road.
Brattleboro, VT 05301
SUBJECT:
REACTOR PRESSURE VESSEL CIRCUMFERENTIAL WELD EXAMINATION FREQUENCY AT VERMONT YANKEE NUCLEAR POWER STATION i
Dear Mr. Maret:
By letter dated January 28,1999, you requested approval for an alternative examination to i
replace that specified in the American Society of Mechanical Engineers Code regarding successive reexaminations of the area containing flaw indications in circumferential welds of the reactor pressure veesel (RPV) for Vermont Yankee Nuclear Power Station. IWB-2420(b) of Section XI requires three successive reexaminations of the areas containing flaws that have been approved for continued service. You sought approval under the provisions of 10 CFR 50.55a(a)(3)(i) for an alterrative inspection schedule that would eliminate the successive reexaminations for the current inspection interval.
We have reviewed your alternative proposal for the reexamination of the circumferential welds in the Vermont Yankee RPV and determined that the alternative proposal for the circumferential welds meets the conditions in the BWRVIP-05 report approved by the staff for the elimination of the successive reexaminations for the circumferential welds with indications. We therefore conclude that authorization of your proposed alternative would provide an acceptable level of quality and safety. Pursuant to 10 CFR 50.55a(a)(3)(i) the alternative is authorized.
Our evaluation and conclusions are documented in the enclosed safety evaluation.
Sincerely,
/s/
James W. Clifford, Chief, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
Safety Evaluation t
cc w/ encl: See next page I
(
DISTRIBUT:ON:
Docket File GShear CNorsworthy (RCN e-mail SE only)
- PUBLIC SSheng OGC PDI-2 Reading File ACRS TClark JZwolinski/SBlack KWichman GHill(2) l CAnderson, RI RCroteau l
DOCUMENT NAME:G:\\CROTEAU\\ RELA 4629.WPD
- Previously Concurred Ta receive a copy of thle document, indicate in the box: "c" = copy without enclosures *E" = Copy with anciosures "N" = No copy OFFICE PM:PDI-2 LA:PDI-2,
E OGC PDI-2/SC NAME RCroteau ///h TClarkML CMarco*
K M 6rd DATE 4 / f/99 ' '
L// b /99 03/25/99 T/ (n /99 l
j twAf'IAL RECORD COPY 9
7 PDR ADOCK 05000271 i
P PDR bb.
1
p uou g
4 UNITED STATES 0
g j
NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 20565-0001
%,...../
April 7,1000 Mr. Gregory A. Maret Director of Operations Vermont Yankee Nuclear Power Corporation 185 Old Ferry Road Brattleboro, VT 05301
SUBJECT:
REACTOR PRESSURE VESSEL CIRCUMFERENTIAL WELD EXAMINATION FREQUENCY AT VERMONT YANKEE NUCLEAR POWER STATION (TAC NO. MA4629)
Dear Mr. Maret:
i By letter dated January 28,1999, you requested approval for an alternative examination to replace that specified in the American Society of Mechanical Engineers Code regarding successive reexaminations of the area containing flaw indications in circumferential welds of the reactor pressure vessel (RPV) for Vermont Yankee Nuclear Power Station. lWB-2420(b) of Section XI requires three successive reexaminations of the areas containing flaws that have been approved for continued service. You sought approval under the provisions of 10 CFR 50.55a(a)(3)(i) for an alternative inspection schedula that would eliminate the successive reexaminations for the current inspection interval.
We have reviewed your alternative proposal for the reexamination of the circumferential welds in the Vermont Yankee RPV and determined that the alternative proposal for the circumferential welds meets the conditions in the BWRVIP-05 report approved by the staff for the elimination of the successive reexaminations for the circumferential welds with indications. We therefore conclude that authorization of your proposed alternative would provide an acceptable level of quality and safety. Pursuant to 10 CFR 50.55a(a)(3)(i) the alternative is authorized.
Our evaluation and conclusions are documented in the enclosed safety evaluation.
Sincerely, hGh et James W. Cliffor, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
Safety Evaluation cc w/ encl: See next page
i G. Maret Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region i U. S. Nuclear Regulatory Commission Mr. Raymond N. McCandless 475 Allendale Road Vermont Division of Occupational King of Prussia, PA 19406 and Radiological Health Administration Building Mr. David R. Lewis Montpelier, VT 05602 Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Mr. Gautam Sen Washington, DC 20037-1128 Licensing Manager Vermont Yankee Nuclear Power Mr. Richard P. Sedano, Commissioner Corporation l
Vermont Department of Public Service 185 Old Ferry Road 120 State Street,3rd Floor Brattleboro, VT 05301 Montpelier,VT 05602 Resident inspector Public Service Board Vermont Yankee Nuclear Power Station State of Vermont U. S. Nuclear Regulatory Commission 120 State Street P.O. Box 176 Montpelier, VT 05602 Vernon, VT 05354 Chairman, Board of Solectmen Mr. Peter LaPorte, Director Town of Vernon ATTN: James Muckerheide P.O. Box 116 Massachusetts Emergency Management Vernon, VT 05354-0116 Agency 4
400 Worcester Rd.
Mr. Richard E. McCullough P.O. Box 1496 Operating Experience Coordinator Framingham, MA 01701-0317 1
Vermont Yankee Nuclear Power Station P.O. Box 157 Jonathan M. Block, Esq.
Governor Hunt Road Main Street Vernon, VT 05354 P. O. Box 566 Putney, VT 05346-0566 G. Dana Bisbee, Esq.
Deputy Attorney General Mr. Michael J. Daley 33 Capitol Street Trustee and Legislative Representative Concord, NH 03301-6937 New England Coalition on Nuclear Pollution, Inc.
Chief, Safety Unit Box 545 Office of the Attorney General Brattleboro, VT 05301 One Ashburton Place,19th Floor Boston, MA 02108 Ms. Deborah B. Katz Box 83 Shelburne Falls, MA 01370 1