Forwards Insp Rept 50-271/99-03 on 990329-0509.Two Severity Level IV Violations Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy
ML20195J722
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/14/1999
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Wanczyk R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20195J727 List:
References
50-271-99-03, 50-271-99-3, NUDOCS 9906210106
Download: ML20195J722 (3)


See also: IR 05000271/1999003

Text

,

f-

t

i

June 14, 1999

..

Mr. Robert Wanczyk

Acting Director of Operations

l

Vermont Yankee Nuclear Power Corporation

l

185 Old Ferry Road

j

Brattleboro, Vermont 05301

l

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-271/99-03

Dear Mr. Wanczyk:

l

On May 9,1999, the NRC completed an inspection at your Vermont Yankee (VY) facility. The

l

enclosed report presents the results of that inspection.

1

During the six weeks covered by this inspection period, operational activities at Vermont Yankee

l

were conducted in a safe manner. The routine maintenance and surveillance activities

!

observed were also completed in a safe and competent manner. Although two violations of

NRC requirements were identified, and are discussed below, these issues did not result in a

reduction in the overall level of plant safety.

Based on the results of this inspection, the NRC has determined that two Severity Level IV

violations of NRC requirements occurred. These violations are being treated as Non-Cited

Violations (NCVs), consistent with Appendix C of the Enforcement Policy. These NCVs

involved: (1) an administrative procedure that would permit delays in implementing Technical

Specification required actions for up to 24-hours when missed surveillances are discovered; and

.

(2) a failure to receive the required approval for use of an altamative ASME post-repair

l

inspection method, prior to retuming a valve to service. These NCVs are further described in

j

the subject inspection report.

If you contest the violation (s) or severity level of the NCVs, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

,

Regulatory Commission, ATTN. Document Control Desk, Washington DC 20555-0001, with

l

copies to the Regional Administrator, Region 1; and the Director, Office of Enforcement, United )

'

States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident [

Inspector at the Vermont Yankee facility.

I

l

.

"

9906210106 990614

c

PDR

ADOCK 05000271

!

0

PDR

]

l

0FFICIAL RECORD COPY

IE:01

_.

i

.

Robert Wanczyk

2

,

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter and its

enclosures will be r'4 ed in the NRC Public Document Room.

Sincerely,

Original Signed by:

Clifford J. Anderson, Chief

Projects Branch 5

Division of Reactor Projects

Docket No.:

50-271

License No.: DPR-28

Enclosure: NRC Inspection Report 50-271/99-03

cc w/ encl:

R. McCullough, Operating Experience Coordinator - Vermont Yankee

G. Sen, Licensing Manager, Vermont Yankee Nuclear Power Corporation

D. Rapaport, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrctor, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

D. Lewis, Esquire

G. Bisbee, Esquire

J. Block, Esquire

T. Rapone, Massachusetts Executive Office of P,tlic Safety

D. Katz, Citizens Awareness Network (CAN)

M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

7

.

.

Robert Wanczyk

3

Distribution w/ encl:

Region I Docket Room (with concurrences)

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

H. Miller, RA/J. Wiggins, DRA

D. Screnci, PAO

C. Anderson, DRP

R. Summers, DRP

R. Junod, DRP.

Distribution w/enci (VIA E-MAIL):

J. Shackelford, Acting RI EDO Coordinator

E. Adensam, NRR

]

R. Croteau, NRR

)

R. Correia, NRR

D. Screnci, PAO

Inspection Program Branch, NRR (IPAS)

DOCDESK

i

DOCUMENT NAME: G:\\ BRAN C H 5\\1 -VY\\l N S P ECEVY9903.WPD

Tc receive a copy of this document, indicate in the box: "C" = Copy without

dachment/ enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRP

l

Rl/DRP

,l

NAME

BMcDermott 'lle

CAnderson C/M

DATE

06//Y/99

06////99

OFFICIAL RECORD COPY