ML20214J551

From kanterella
Revision as of 16:15, 4 May 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/85-16 & 50-446/85-13.Requests Addl Info on Item a of Notice of Violation Re Failure of Design Review Process
ML20214J551
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/12/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20214J555 List:
References
NUDOCS 8608150067
Download: ML20214J551 (2)


See also: IR 05000445/1985016

Text

. . . .

In Reply Refer To:

AljG 12 188,-o

Dockets: 50-445/85-16 _

50-446/85-13 l

l

t

Texas Utilities Generating Company

. ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

Thank you for your letter dated June 16, 1986, in response to our letter dated

April 4, 1986. As a result of our review, we find we are in need of additional

information with respect to Item A in the Notice of Violation (NOV).

Specifically, your response failed to provide any actions taken with respect to

the failure of the design review process to identify the technical inadequacy

of Design Change Authorization 13,349. Additionally, we do not consider that

reliance solely on personnel discussions provides an adequate basis for

determining that the identified use of a grouted Richmond Insert was a single

case. Accordingly, please describe those actions, planned or taken, which will

i substantiate the conclusions made from discussions with personnel.

We have no further questions regarding Items B, C, and D in the NOV and Items A,

B, and C in the Notice of Deviation. This determination is based, however, on

all references in your letter to training sessions, meetings, and discussions

being appropriately documented and available for audit. Please inform us if

this is not fully the case.

l

l Please provide the supplemental information within 20 days of the date of this

letter.

,

Sincerely, .

l

/S/

/0/k//

l E. H. Johnson, Director

Division of Reactor Safety

I and Projects

cc: (see next page)

RIV: CPG RSB P

IBarnes:gb TFWesterman EHJohnson

y / ///86 9/f//86 7 /// /86

Zb l8

0

l ge9888MS$P

l G

.

._ . - _ , ._ . _ .

-_

. .

Texas Utilities Generating Company -2-

. cc:

, Texas Utilities Electric Company

ATTN: G. S. Keeley, Manager

Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224 '

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P. O. Box 12548 .

Austin, Texas 78711 - 2548

, Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV

.

RPB MIS System

RRI-0PS RSTS Operator

RRI-CONST R&SPB

T. F. Westerman, RIV DRSP

I. Barnes, CPTG R. Martin, RA

V. Noonan, NRR RSB

S. Treby, ELD J. Taylor, IE

RIV File R. Heishman, IE

D. Weiss, LFNB (AR-2015)

,

l

!

l

i

f

l

i

l

!

l

l-

. _ - _ - _ _ ,_ - _ __ _ .- - - _ _ . _ . _ .__.___