ML20215D585

From kanterella
Revision as of 09:41, 3 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards SER Re Licensee Response to Generic Ltr 83-28,Item 4.5.1, Reactor Trip Sys Reliability (Sys Functional Testing). Reactor Trip Sys Functional Testing Acceptable
ML20215D585
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/07/1986
From: Oconnor P
Office of Nuclear Reactor Regulation
To: Koester G
KANSAS GAS & ELECTRIC CO.
Shared Package
ML20215D588 List:
References
GL-83-28, TAC-57374, NUDOCS 8610140217
Download: ML20215D585 (2)


Text

L' Docket No.: 50-482 7 OCT 1986 Mr. Glenn L. Koester

.Vice F resident - Nuclear Kansas Gas and Electric Company 201 North Market Street Post Office Box 208 Wichita, Kansas 67201

SUBJECT:

WOLF CREEK GENERIC LETTER 83-28 ITEM 4.5.1 - REACTOR TRIP SYSTEM RELIABILITY (SYSTEM FUNCTIONAL TESTING)

The staff has cortpleted its review of Generic Letter 83-28, Item 4.5.1 Reactor Trip System Reliability (System Functional Testing), for Wolf Creek. The staff finds that the reactor trip system reliability system functional testing) for Wolf Creek is acceptable.

This completes the staff actions for Item 4.5.1 of Generic Letter 83-28.

A copy of the related safety evaluation is enclosed.

Sincerely, Paul W. O'Connor, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page DISTRIBUTION:

,weDOCKet F11e i_l

^ ~ '

NRC PDR Local PDR PWR#4 Reading BJYoungblood OGC EJordan BGrimes JPartlow P0'Connor ,

MDuncan ACRS (10)

N PWR#4/DPWR-A PWR#4/DPWR-A P0'Connor/ rad BJYoungblood 10/;/86 10/7/86 i

kDR 17 861007 -

P OI$$$CK0500048PDR 2

p Mr. Glenn L. Koester Wolf Creek Generating Station Kansas Gas and Electric Company Unit No. I cc:

Mr. Nicholas A. Petrick Mr. Gary L. Haden, Director Executive Director, SNUPPS Research & Energy Analysis 5 Choke Cherry Road Kansas Corporation Commission Rockville, Maryland 20850 4th Floor - State Office Building Topeka, Kansas 66612-1571 Jay S:1 berg, Esq.

Shaw, Pittman, Potts & Trowbridge Regional Administrator, Region IV 2300 N Street, NW U.S. Nuclear Regulatory Commission Washington, D.C. 20037 Office of Executive Director for Operations Mr. Donald T. McPhee 611 Ryan Plaza Drive, Suite 1000 Vice President - Production Arlington, Texas 76011 Kansas City Power & Light Company 1330 Baltimore Avenue Mr. Allan Mee Kansas City, Missouri 64141 Project Coordinator Kansas Electric Power Cooperative,Inc.

Chris R. Rogers, P.E. P. O. Box 4877 Manager, Electric Department Gage Center Station Public Service Commission Topeka, Kansas 66604 P. O. Box 360 Jefferson City, Missouri 65102 Resident Inspector / Wolf Creek NPS c/o U.S. Nuclear Regulatory Commission Regional Administrator, Region III P. O. Box 311 U.S. Nuclear Regulatory Commission Burlington, Kansas 66893 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Brian Moline Chief Legal Counsel Brian P. Cassidy, Regional Counsel Kansas Corporation Commission Federal Emergency Management Agency 4th Floor - State Office Building Region 1 Topeka, Kansas 66612-1571 J. W. McCormack POCH Boston, Massachusetts 02109 Senior Resident Inspector / Wolf Creek NPS c/o U.S. Nuclear Regulatory Commission Mr. Robert Elliot, Chief Engineer P. O. Box 311 Utilities Division Burlington, Kansas 66839 Kansas Corporation Commission 4th Floor - State Office Building Topeka, Kansas 66612-1571 Mr. Gerald Allen Public Health Physicist Bureau of Air Quality & Radiation Control Division of Environment Kansas Department of Health and Environment Forbes Field Building 321 Topeka, Kansas 66620

- - -