Forwards Safety Insp Rept 50-346/87-08 on 870401-0531 & Notice of Violation
ML20234C681
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/24/1987
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20234C685 List:
References
NUDOCS 8707060613
Download: ML20234C681 (2)


See also: IR 05000346/1987008

Text

T

- bm6

'

.

JUN * 41987

Docket No. 50-346

Toledo Edison Company.

ATTN: Mr. Don Shelton,

Vice President

Nuclear

Edison Plaza

300 Madison Avenue-

Toledo, OH 43652

Gentlemen:

This refers to'the routine safety inspection conducted by Messrs. P. M. Byron,

D. C. Kosloff, K. Su'11ivan and R. Lofaro. of this office on April 1 through

May 31, 1987, of activities at Davis-Besse Nuclear Power Station authorized

by Facility Operating License No. hPF-3 and to the discussion of our findings

with Mr. L. Storz at the conclusion of the inspection.

The. enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination.of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared ~to be in violation

of NRC requirements, as described in the enclosed Appendix. With respect to

Items 1 and 2, the inspection showed that action had been-taken to correct

the identified violation and to prevent recurrence. Our understanding of

your corrective actions are described in Paragraphs 3c and 3d of the enclosed

inspection report. Consequently, no reply to Violation 1 and 2 is required

and we have no further questions regarding this matter at this time.

Regarding the remaining items, a written response is required.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed. by R. W. DeFayette"

%O70p[

p P W. G. Guldemond, Chief

Reactor Projects Branch 2

g

Enclosures: 1

1. Notice of Violation i

2. Inspection Report

No. 50-346/87008(DRP)

See Attached Distribution

i

RII RIII. RIII RIII

ftW6[-

Byron ms

F

lKosi'ff

-

De(ayetteW .0-- @Y

,

Guidemond

60/

]

-

,

.

Toledo Edison Company 2 JUN 2 41387

Distribution

!

cc w/ enclosures:

L. Storz, Plant Manager  ;

DCS/RSB (RIDS) i '

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W., Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

,