JUN * 41987
Docket No. 50-346
Toledo Edison Company.
ATTN:
Mr. Don Shelton,
Vice President
Nuclear
Edison Plaza
300 Madison Avenue-
Toledo, OH 43652
Gentlemen:
This refers to'the routine safety inspection conducted by Messrs. P. M. Byron,
D. C. Kosloff, K. Su'11ivan and R. Lofaro. of this office on April 1 through
May 31, 1987, of activities at Davis-Besse Nuclear Power Station authorized
by Facility Operating License No. hPF-3 and to the discussion of our findings
with Mr. L. Storz at the conclusion of the inspection.
The. enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination.of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared ~to be in violation
of NRC requirements, as described in the enclosed Appendix. With respect to
Items 1 and 2, the inspection showed that action had been-taken to correct
the identified violation and to prevent recurrence.
Our understanding of
your corrective actions are described in Paragraphs 3c and 3d of the enclosed
inspection report.
Consequently, no reply to Violation 1 and 2 is required
and we have no further questions regarding this matter at this time.
Regarding the remaining items, a written response is required.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed. by R. W. DeFayette"
%O70p[
P
W. G. Guldemond, Chief
p
Reactor Projects Branch 2
g
Enclosures:
1
1.
i
2.
Inspection Report
No. 50-346/87008(DRP)
See Attached Distribution
i
RII
RIII.
RIII
RIII
ftW6[-
De(ayetteW 0-- ,@Y
lKosi'ff
F
-
. Guidemond
Byron ms
60/
]
-
.
Toledo Edison Company
2
JUN 2 41387
Distribution
!
cc w/ enclosures:
L. Storz, Plant Manager
DCS/RSB (RIDS)
i
Licensing Fee Management Branch
'
Resident Inspector, RIII
Harold W.,
James W. Harris, State of Ohio
Robert M. Quillin, Ohio
Department of Health
State of Ohio, Public
Utilities Commission
,