ML20245H729

From kanterella
Revision as of 22:54, 14 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-321/89-07 & 50-366/89-07 on 890422-0526.Licensee Identified Violations Not Cited
ML20245H729
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/19/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20245H733 List:
References
NUDOCS 8906300068
Download: ML20245H729 (2)


See also: IR 05000321/1989007

Text

-.

,.

.

l

  • !
JUN 191999

Docket Nos. 50-321, 50-366 ,

License Nos. DPR-57, NPF-5

i

l

Georgia Power Company q

ATTN: Mr. W. C. Hairston, III )

Senior Vice President -

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-07 AND 50-366/89-07

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by f

J. E. Menning on April 22 - May 26,1989. The inspection included a review of

activities authorized for your Hatch facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff 1

'

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of  !

activities in progress. )

i

The inspection findings indicate that certain activities appeared to violate

NRC requirements. However, because all of the criteria for categorization of '

.

licensee-identified violations were met, four violations are not being cited.

Therefore, no response to these items is required. The details pertaining to

the licensee-identified non-cited violations are described in the enclosed

Inspection Report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

-

Alan R. Herdt, Chief 4

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure: (See page 2)

g63Oo068s90619

o ADOCK 05000321 s

I

PNU "

,

\

_

JEOI

_. _.

t

t- .

,'

-r

l

, .

,

i \

l Georgia Power Cdmpany 2 JUN 191989 l

i

!

4

Er isure-

-

NRC Inspection Report I

cc w/ encl:

R. P. Mcdonald, Executive Vice President,

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch  !

H. C. Nix, General Manager, Plant Hatch i

0. M. Fraser, Site Quality Assurance

Manager

L. T. Gucwa, Manager, Nuclear Engineering

and Licensing, Plant Hatch

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec w/ enc 1:

L. P. Crocker, NRR

M. V. Sinkule, RII

NRC Resident Inspector

Document Control Desk

l

,

i

4

LTrocine:ser MSinkule

06/N/89 06/ /89

__. )