ML20246P492

From kanterella
Revision as of 04:33, 12 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-321/89-15 & 50-366/89-15 on 890724-28.No Violations or Deviations Noted
ML20246P492
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/22/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20246P496 List:
References
NUDOCS 8909110131
Download: ML20246P492 (2)


See also: IR 05000321/1989015

Text

- . - - . ._. __

E *

. ,,

,

August 22, 1989

-

-

1

0

Docket Nos. 50-321, 50-366

-License Nos. DPR-57, NPF-5

Georgia Fower Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. 0.. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N05. 50-321/89-15 AND 50-366/89-15

This refers' to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. ~J. Lenahan on July 24-28, 1989. The inspection included a review of

activities authorized for your Hatch facility. At the conclusion o# the

inspection, the -findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.'790 of the NRC's " Rules of Practice," Part 2,

Title 10, C' 'e of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Si ncerely,

original signed by

Caudie A. Julian

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ enc 1: (See page 2)

1

8909110131

PDR

890822

O ADOCK 05000321 i s

FDC

.bE0/

_ _ _ - _ _ - - _ - _ _ _ _ _ _ _ - - _ _ - _ _ _ -

__-_ _-_ _ _ _

August 22 0 1989

,

.

,

.' Georgia Power Company 2

cc w/ encl:

R. P. Mcdonald Executive Vice

President, Nuclear Operations

J. T. Beckham, Vice President

Plant Hatch

H. C.. Nix, General Manager

Plant Hatch.

O. M. Fraser, Site Quality

~ Assurance Manager

J..Heidt, Manage", Nuclear

Engineering and Licensing

Plant Hatch

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bec w/ encl:

L. P. Crocker, NRR

K. E Brockman, RII

NRC Resident Inspector

Document Control Desk

~G. Belisle

'K. Brockman

J. Lenahan

RII:DF;S RII: S RI . P '

'-

!p/

JLe}nahan GBe 1e KBra ' -A /vd6

08/ jp/89 08/gp/89 08/p'89

- _ _____ ___ _______ _ --__ __ _ _ -