ML20247J685

From kanterella
Revision as of 15:18, 10 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-382/89-16 on 890717-21 & Notice of Violation
ML20247J685
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/15/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20247J687 List:
References
NUDOCS 8909200254
Download: ML20247J685 (2)


See also: IR 05000382/1989016

Text

. __ - _ _ _ _ _

y

+ .?y

. SEP 'l 51989 '

' '

! In Reply Refer To:.

Docket: 50-382/89-16

w

Louisiana; Power & Light Company

ATTN: .J. G. Dewease, Senior Vice President

. Nuclear.0perations

c317 Baronne Street-

"New Orleans,' Louisiana- 70160

, _.,.

Gentlemen:

Thisreferstothe)inspectionconductedbyMr.D.R.Hunterofthisofficeand

Mr. F.'W. Hasselberg of the.NRC Technical Training Center during the period of

July 17-21,1989,sof activities authorized by NRC Operating License NPF-38 for

, ~ Waterford Steam Electric Station, Unit 3 and to the discussion of our findings

with Messrs. R. P. Barkhurst and J. R. McGaha and other members of your staff

.at the. conclusion of the inspection.

o

The area ~ examined during the inspection included plant operations procedures.

t'~

Within this area, the inspection consisted of selective examination of procedures

'

and representative records, interviews with personnel, and observations by the

NRC inspectors. The inspection findings are documented in the enclosed inspection

report..

During this inspection, it was.found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

the ~ violation described. in paragraph 2.5 of the enclosed inspection report, in

writing, in accordance with the provisions of Section 2.201 of the NRC's " Rules

of Practice," Part 2, Title 10. Code of ~ Federal Regulations. Your response

f should be based on the specifics contained in the Notice of Violation enclosed

with this letter. In accordance with Section V.A of the NRC's Enforcement

Policy, no citation is being issued for the two violations described in

- paragraph 2.1.2 of the' enclosed inspection report,

i.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1900 PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

!.. discuss them with you.

Sincerely,

Driginal Sir =111Y

3. L I,filhoan

James L. Milhoan, Director

Division of Reactor Projects

Enclosures: (see next page)

AD:DRS* D:

RIV:RI:0PS* .C:0PS*

N7[

H

DRHunter/tw JEGagliardo JPJaudon JLMilhoan

/ /89 / /89 / /89 f //69

  • previously. concurred

go/

V9 T l

'c/gypoo259 'f

gwd Og &2

. .

- - --

. . - - .

h. f

1;--

H

'*

l'"*'

-

4;-

L uisiana Power & Light' Company. -2-

'

-

! Enclosures:

1. ' Appendix Al- Notke of' Viol 5 tion

-2... Appendix B - NRC Inspection Report

--3,

>

  • 50-382/89-16 ,

-

,

, cc;w/ enclosures'

Louisiana Power & Light Company

ATTN: R. P. Barkhurst, Vice President

.

Nuclear Operations -

-

P.O. Box B

Killona.-LouisianaE70066.

Louisiana. Power & Light Company

ATTN: J. R. McGaha, Jr., Plant Manager .

P.0; Box B

r Killona, Louisiana .70066 -

Louisiana Power & Light Company

ATTN: R. ' F. Burski, Manager, Nuclear

Safety _& Regulatory. Affairs

317 Baronne: Street

P.O. Box 60340

'New Orleans, Louisiana 3 70160

Louisiana Power & Light Company

ATTN: ,L. W.' Laughlin, Site

Licensing Support Supervisor

P.O. Box B'

-Killona, Louisiana 70066

Louisiana Power.& Light Company

ATTN: G. M. Davis, Manager, Events

Analysis Reporting & Response

P.O. Box B

Killona, Louisiana -70066

, Middle South Services

ATTN: :Mr. R. T. Lally

P.O. Box 61000

-New Orleans, Louisiana 70161

Louisiana Radiation Control Program Director

bec to DMB (IE01)

, bec distrib. by RIV:

  • RRI . *R. D. Martin, RA *DRP
  • Section Chief (DRP/A) * MIS System *DRS (3 copies)
  • ProjectEngineer(DRP/A) *RSTS Operator- *RIV File

Lisa Shea, R7./ALF *D. R. Hunter *RPB-DRSS

  • F. W. Hasselberg, TTC G. F. Sanborn, E0 *J. E. Gagliardo
  • D. Wigginton, NRR Project Manager (MS: 13-D-18)
  • w/766