|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210K3281999-07-30030 July 1999 Forwards Response to NRC RAI Re License Amend Request 98-17. North Atlantic Concurs with Staff That Bases Should State That Maintaining ECCS Piping Full of Water from RWST to Reactor Coolant Sys Ensures Sys Will Perform Properly ML20210H8991999-07-27027 July 1999 Forwards Tabulation of Current LBLOCA & SBLOCA Peak Clad Temp Margin Utilization Tables Applicable to Seabrook Station ML20210H0921999-07-27027 July 1999 Forwards Naesc Semi-Annual Fitness-for-Duty Rept,Jan-June 1999, Per 10CFR26.71(d).Rept Includes Data from 990101- 0610 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options ML20210A2521999-07-15015 July 1999 Forwards Rev 33 to Seabrook Station Radiological Emergency Plan & Rev 84 to Seabrook Station Emergency Response Manual ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1351999-07-0909 July 1999 Forwards Relief Request Re Repair Welding on SA-351 Matl to Be Installed in Seabrook Station SW Pumps & SW Cooling Tower Pumps ML20209D2871999-07-0606 July 1999 Submits Response to NRC AL 99-02,re Numerical Estimate of Licensing Actions Expected to Be Submitted in Fy 2000 & 2001.Schedule Does Not Include Activities Which Meet AL Definition of Complex Review ML20209C9021999-06-30030 June 1999 Provides Revised Distribution List for Seabrook Station Correspondence to Reflect Current Organization ML20196G2391999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant Encl ML20196G3381999-06-23023 June 1999 Forwards LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20195J0981999-06-17017 June 1999 Forwards Responses to Questions Posed in Re Application of New England Power Co for Transfer of Control of Licenses NPF-49 & NPF-86.Copy of 1998 Schedule 13G, Included,As Requested ML20196D0561999-06-16016 June 1999 Forwards Certified Copy of Endorsements 77 & 78 to Nelia to Policy NF-0296 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195J1221999-06-15015 June 1999 Forwards Addl Clarifying Info to Suppl Info Provided at 990602 Predecisional Enforcement Conference at Region I. Proprietary Declarations by Util Employees to Correct Inaccuracies Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210K4971999-06-15015 June 1999 Forwards Copy of Ltr from Concerned Constitutent AC Menninger from Franconia,Nh to Senator Smith Re Seabrook Nuclear Power Station Y2K Readiness ML20195E9731999-06-0707 June 1999 Forwards Rev 32 to Seabrook Station Radiological Emergency Plan & Rev 83 to Emergency Response Manual ML20206T4201999-05-20020 May 1999 Forwards Certified Copies of Resolution Adopted by Shareholders of National Grid Group Approving Acquisition of New England Electric Sys & Vote of New England Electric Sys Shareholders Approving Merger with National Grid Group ML20196L2001999-05-0707 May 1999 Forwards Rev 01-07-00 to RE-21, Cycle 7 COLR, Per TS 6.8.1.6.c ML20206K4301999-05-0707 May 1999 Forwards Copy of Corrective Order of Notice by State of Nh Nuclear Decommissioning Financing Committee ML20206J3321999-05-0505 May 1999 Forwards Tabulation of Number of Tubes Plugged in Each of Two SGs Inspected During Sixth Isi,Per Plant TS SR 4.4.5.5a. Sixth ISI Was Completed on 990420 ML20206J3341999-05-0505 May 1999 Informs That on 990501,ISO New England & New England Power Pool Implemented Restructured Wholesale Electricity Market. Summary of Util Action as Result of Implementation of Subject Market,Encl ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206G4371999-04-30030 April 1999 Forwards 1998 Annual Environ Operating Rept for Seabrook Station.Encl Rept Is Summary of Implementation of EPP for Period of Jan-Dec 1998 ML20206H4801999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Seabrook Station. Listed Info Provided in Encls 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062E4151990-11-16016 November 1990 Forwards H Myers 901019 Request for Info Re Plant Welds for Appropriate Action ML20217A2531990-11-15015 November 1990 Requests Info Re Surety Bond & Status of Eua Power Interest in Surety Bond ML20058E6871990-10-29029 October 1990 Ack Receipt of in Response to NRC Announcing Intent to Perform Team Insp of Maint Program on 901203-14.Subj Insp Date Changed to 910128-0208 Due to Various Complications ML20058D6061990-10-24024 October 1990 Forwards Safety Insp Rept 50-443/90-17 on 900905-1014. Actions Taken on Previous Insp Findings Found to Be Adequate IR 05000443/19900181990-10-17017 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/90-18 ML20058A3461990-10-17017 October 1990 Informs That Util Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-08,Item 2.2 'Vendor Interface for Safety-Related Components,' Acceptable ML20058B8081990-10-12012 October 1990 Informs That SW Kessinger Scheduled to Participate in NRC 901022 Requalification Exam IR 05000443/19900151990-10-0202 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/90-15 ML20059N8241990-10-0101 October 1990 Informs of 901203-14 Maint Program Team Insp & Forwards NRC Temporary Instruction 2515/97,Rev 1 ML20059L8831990-09-21021 September 1990 Forwards Safety Insp Rept 50-443/90-16 on 900730-0904.No Violations Noted ML20059H0601990-09-0707 September 1990 Discusses Unescorted Access to Licensee Facilities & fitness-for-duty Program,Per .Nrc Regulations Do Not Prohibit Licensee from Accepting Access Authorization Program of Another Licensee,Contractor or Vendor ML20058P7851990-08-16016 August 1990 Forwards Safety Insp Rept 50-443/90-15 on 900625-0729 & Notice of violation.Self-assessment Team Rept on Power Ascension Testing Demonstrated Ability to Be self-critical & Results Corresponded Well W/Nrc Assessments of Performance ML20058N1121990-08-10010 August 1990 Provides Comments on Util 900102 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. NRC Does Not Take Any Position on Acceptability of Util Station Gauge Methodology ML20058M6181990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Licensee Has Undertaken Positive Initiatives in Engineering Area, Including Design Basis Document Updates,Safety Sys Functional Insps & Other Engineering Program Improvements ML20055G7591990-07-16016 July 1990 Forwards Safety Insp Rept 50-443/90-13 on 900521-25.No Violations Noted.Weaknesses Noted ML20055G1481990-07-12012 July 1990 Forwards Safety Insp Rept 50-443/90-12 on 900514-0624 ML20055G1771990-07-11011 July 1990 Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation Scheduled for 901015-26. Facility Mgt Responsible for Providing Adequate Space & Accomodations to Properly Develop & Conduct Exams ML20055G0471990-07-0505 July 1990 Forwards Safeguards Insp Rept 50-443/90-14 on 900618-22.No Violations Observed.One Potential Weakness Identified Which Requires Attention to Maintain Effectiveness of Security Program ML20055F5391990-07-0202 July 1990 Forwards Special Power Ascension Team Insp Rept 50-443/90-81 on 900316-0502.Power Ascension Test Program Acceptable ML20055D0941990-06-28028 June 1990 Forwards Transcript of 900619 Public Meeting to Discuss Assessment of Power Ascension Test Program Performance Up to 50% Power Level ML20055D0761990-06-26026 June 1990 Advises of Completion of Review of Proposed Changes to Emergency Action Levels for Plant & Found Rev to Emergency Plan Acceptable W/Listed Understandings ML20055C9991990-06-25025 June 1990 Formalizes Requests Made in Conversation Between J Grillo & Ph Bissett on 900619 Re Planned Insp of Facility EOPs ML20059M9361990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248G1381989-09-26026 September 1989 Forwards SALP Rept 50-443/87-99 for Aug 1987 - June 1989 ML20247N7101989-09-15015 September 1989 Requests Encl Listed Ref Matl for 891211 Evaluation of All Shift Operating Crews on Simulator Using NRC-developed Scenarios ML20247K9511989-09-13013 September 1989 Forwards Safety Inspt Rept 50-443/89-08 on 890701-0817.No Violations Noted ML20246P6341989-09-0606 September 1989 Forwards SER Re Generic Ltr 83-28,Item 4.5.3, Reactor Trip Sys Reliability for All Domestic Operating Reactors. Existing Intervals for on-line Functional Testing at Plant Consistent W/Achieving High Reactor Trip Sys Availability ML20246N8211989-08-29029 August 1989 Advises That Reactor & Senior Reactor Operator Exams Scheduled for Wk of 891114,per Telcon.Licensee Responsible for Providing Encl Ref Matl by 890901 ML20246F3181989-08-21021 August 1989 Forwards Safety Insp Rept 50-443/89-07 on 890619-23.No Violations Noted.Concerns Re Steam Leakage Problems Through Auxiliary Feed Pump Turbine Control Valves & Leakage Through Certain RCS Pressure Isolation Valves,Expressed ML20246J3601989-08-18018 August 1989 Clarifies NRC Position Re Definition of Extremity for Purpose of Setting Occupational Exposure Limits.Procedures Should Incorporate Applicable Dose Limits of 10CFR20 IR 05000443/19890821989-08-17017 August 1989 Forwards Augmented Team Insp Rept 50-443/89-82 on 890628-30, Enforcement Conference Issues & Related Regulatory Requirements.W/O Insp Rept ML20246A9201989-08-11011 August 1989 Forwards Team Safety Insp Rept 50-443/89-81 on 890612-23.No Violations or Unresolved Items Noted ML20247Q7431989-07-28028 July 1989 Forwards Safety Insp Rept 50-443/89-06 on 890527-0630. Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/89-03 ML20247N5731989-07-28028 July 1989 Forwards Safety Evaluation Updating Status of Onsite & Offsite Emergency Preparedness for Plant.Onsite Emergency Preparedness Acceptable & Adequate for Full Power Operation. Offsite Emergency Preparedness Will Be Acceptable ML20247L9611989-07-18018 July 1989 Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose IA-89-326, Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose1989-07-18018 July 1989 Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose ML20247A9801989-07-14014 July 1989 Forwards Readiness Assessment Team Insp Rept 50-443/89-80 on 890527-0601.No Violations Noted ML20245J2101989-06-23023 June 1989 Confirmation of Action Ltr 89-11,confirming 890623 Telcon. Understands That Listed Actions Will Be Completed Prior to Startup in Response to 890622 Reactor Manual Trip Which Occurred During Natural Circulation Startup Test ML20245F0891989-06-21021 June 1989 Forwards Insp Rept 50-443/89-05 on 890424-0527.Violation Noted Re Storage Location for Svc Water Cooling Water Pump ML20245A9051989-06-15015 June 1989 Forwards SER Re Proposed Implementation of ATWS Rule (10CFR50.62) Requirements.Pending Final Resolution of Tech Spec Issue,Atws Design Proposed by Util in Compliance W/Rule.Design Mods Should Be Completed by Sept 1990 NUREG-0896, Forwards Sser 8 (NUREG-0896),addressing Issues Re 5% Low Power License.W/O Encl1989-06-0909 June 1989 Forwards Sser 8 (NUREG-0896),addressing Issues Re 5% Low Power License.W/O Encl ML20244D0951989-05-26026 May 1989 Forwards License NPF-67,authorizing Operation of Facility to Power Levels Not Exceeding 5% of Rated Power & Limited to No More than 0.75 Effective Full Power Hours ML20247R5731989-05-25025 May 1989 Forwards Insp Rept 50-443/89-03 on 890228-0424 & Notice of Violation.Ack Util Intention to Initiate Appropriate Corrective Action as Described in .Notice of Violation Re Welding Program Deficiencies Not Issued ML20247G3331989-05-21021 May 1989 Forwards Summary of NRC Understanding of How Restrictions on Low Power Physics Testing Will Be Met.Approach Satisfactory ML20247L7401989-05-18018 May 1989 Forwards Safety Insp Rept 50-443/89-04 on 890327-31.No Violations Noted ML20247L9411989-05-0505 May 1989 Provides Guidelines for Review of Emergency Exercise Objectives & Scenario Packages Prior to Plant Partial Participation Emergency Exercise Scheduled for Wk of 890925, Including Schedule ML20247B0911989-05-0303 May 1989 Extends Invitation to Attend Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Agenda Encl CLI-88-10, Forwards Safety Evaluation Accepting Licensee Decommissioning Funding Assurance Plan.Plan Provides Necessary Assurance & Satisfies Requirements in Decision CLI-88-101989-05-0303 May 1989 Forwards Safety Evaluation Accepting Licensee Decommissioning Funding Assurance Plan.Plan Provides Necessary Assurance & Satisfies Requirements in Decision CLI-88-10 ML20246F3911989-05-0202 May 1989 Requests Explanation Re Effect of Paragraph M.5 of Section 6.01 of Supplementary Decommissioning Trust Agreement Re Funds (Strips) to Be Provided for Supplementary Trusts ML20245F5861989-04-25025 April 1989 Comments on Supplemental Decommissioning Funding Financial Assurance Arrangements Presented at 890420 Meeting in Rockville,Md.Listed Info Should Be Included in Formal Response to Comments 1990-09-07
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As ML20203A2811999-01-28028 January 1999 Forwards Insp Rept 50-443/98-10 on 981115-1227.No Violations Noted.Operators Performed Well During Two Reactor start-ups & Response to Plant Trip on December 22.Radioactive Waste Mgt Program Properly Implemented ML20198Q7391998-12-21021 December 1998 Informs That Review of Licensee Response to GL 97-05, SG Tube Insp Techniques, Did Not Identify Any Concerns with SG Insp Techniques Employed at Seabrook That Would Indicate That Naesco Not in Compliance with Licensing Basis ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20198D1341998-12-16016 December 1998 Forwrds Ltr from J Bean Transmitting Final Exercise Rept for 981020,MS-1,out of Sequence Drill for Elliot Hosp in Manchester,Nh.Assistance Being Requested to Offsite Officials to Address & Resolve Identified Arca Timely ML20198C1131998-12-11011 December 1998 Forwards Insp Rept 50-443/98-09 on 981004-1114 & Notice of Violation.Nrc Identified That Safety Equipment Removed from Service at Beginning of Forced Outage Without Appropriate Monitoring of Status of Equipment as Required ML20197K1931998-12-0909 December 1998 Forwards RAI Re Utilities Participation in WOG Response to GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Submittal Date 1999-09-30
[Table view] |
See also: IR 05000443/1987003
Text
- . . .
. .
.
NAR 1 c 1997
Docket No. 50-443
Public Service of New Hampshire
ATTN: Mr. Robert J. Harrison
President and Chief Executive Officer
P. O. Box 330
Manchester, New Hampshire 03105
Gentlemen:
Subject: Inspection No. 50-443/87-03
This refers to the routine safety inspection conducted by Mr. James Prell of
this office on January 27-30 and February 10-13, 1987 at Seabrook Unit 1,
Seabrook, New Hampshire of activities authorized by NRC License No. CPPR-135
and to the discussions of our findings held by Mr. Prell with Mr. Donald Moody
of your staff at the conclusion of the inspection.
Areas examined during this-inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
Your cooperation with us in this matter is appreciated.
Sincerely,
Originol Signed Ry1
JonR. Johnecu
Wil!!am V. Johnston, Acting Director
Division of Reactor Safety
Region I
Enclosure: NRC Region I Inspection Report No. 50-443/87-03
G703200328 870310 I
PDR ADOCK 05000443 "r
Q PDR j
1
I
0FFICIAL RECORD COPY IR SB 87-03 - 0001.0.0 i
03/05/87 I
.
. .
Public Service of New Hampshire 2
cc w/ encl:
Seabrook Hearing Service List
John DeVincentis, Director of Engineering
William B. Derrickson, Senior Vice President
Warren Hall, Regulatory Services Manager
Donald E. Moody, Station Manager-
Gerald F. Mcdonald, Construction QA Manager
The Honorable E. J. Markey, Chairman, Subcommittee on Energy and
Conservation and Power
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Robert J. Bores, DRSS
J. Johnson, DRS
.
.
N/ M
RI:DR8
M'hRI:DRS RI:DRS
Prell/bc N. Blumberg J. Johnson
03/fo/87 03//6 /87 03/F/87
0FFICIAL RECORD COPY IR SB 87-03 - 0001.1.0
03/05/87
. .
'
Public S rvice of New Hampshire Mr. William B. D:rrickson
ATTN: Mr. Robert J. Harrison Senior Vice President
Pr.esident and Chief Executive New Hampshire Yankee
Officer Seabrook Station
P. O. Box 330 P.O. Box 300
Manchester, New Hampshire 03105 Seabrook, New Hampshire 03874
Mr. Donald E. Moody Mr. Warren Hall
Station Manager Regulatory Services Manager
New Hampshire Yankee Seabrook Station
Seabrook Station P.O. Box 300
P. O. Box 300 Seabrook, New Hampshire 03874
Seabrook, New Hampshire 03874
Thomas Dignan, Esq E. Tupper Kinger, Esq.
John A. Ritscher, Esq. Assistant Attorney General
Ropes and Gray Office of Attorney General
225 Franklin Street 208 State House Annex
Boston, Massachusetts 02110 Concord, New Hampshire 03301
Mr. Bruce Beckley, Project Manager Resident Inspector
New Hampshire Yankee Seabrook Nuclear Power Station
P.O. Box 330 c/o U.S. Nuclear Regulatory Comm.
Manchester, New Hampshire 03105 P. O. Box 1149
Seabrook, New Hampshire 03874
Mr. Ted C. Feingenbaum, Vice President
of Engineering and Quality Programs
Yankee Atomic Electric Company
P.O. Box 700
Seabrook, New Hampshire 03874
- .
Dr..Murr y-Tye, Prasid;nt
Sunn Valley Association
209 Summe.r Street
Haverhill, Massachusetts 08139-
i
Robert A. Backus, Esq. Mr. A. M. Ebner, Project Manager
O'Neill, Backus, and Spielman United Engineers & Constructors
116 Lowell Street 30 South 17th Street
Manchester, New Hampshire 03105 P. O. Box 8223
Philadephia, Pennsylvania' 19101
1
I
Mr. Phillip Ahrens, Esq. William S. Jordan, III
Assistant Attorney General Diane Curran
Office of the Attorney General Harmon, Weiss, and Jordan
State House Station # 6 20001 S. Street, N.W.
Augusta, Maine 04333 Suite 430
Washington, D.C. 20009
Jo Ann Shotwell, Esq. D. P !erre G. Cameron, Jr. , Esq
Office of the Assistant Attorney General Counsel
General Public Service Company of
Environmental Protection Division New Hampshire
One Asburton Place P. O. Box 330
Boston, Massachusetts 02108 Manchester, New Hampshire 03105
Ms. Diana P. Randall Regional Administrator, Region I
70 Collins Street U.S. Nuclear Regulatory Commission
Seabrook, New Hampshire 03874 631 Park Avenue
King of Prussia, Pennsylvania 19406
. .
Richard H rpe, Esq. Mr. Alfrcd V. Sarg:nt
New Hampshire Civil Defense Agency Chairman
107 Pleasant Street Board ~of Selectmen
Concord, New Hampshire 03874 Town of-Salisbury, MA 01950
Mr. Calvin A..Canney, City Manager' Senator Gordon J. Humphrey
City Hall ATTN: Tom Burack
126 Daniel Street U.S. Senate
Portsmouth, New Hampshire 03810 Washington, D.C. 20510
Ms. Letty Hett Mr. Owen B. Durgin, Chairman
Town of Brentwood Durham Board of Selectmen
RFD Dalton Road Town of Durham
Exeter, New Hampshire 03833 Durham, New Hampshire 03824
Ms. Roberta C. Pevear Charles Cross, Esq.
Town of Hampton Falls Shatnes, Mardrigan, and McEaschern
Drinkwater Road 25 Maplewood Avenue
Hampton Falls, New Hampshire 03844 P. O. Box 366
Portsmouth, New Hampshire 03801
Ms. Anne Verga Mr. Guy Chichester, Chairman
Chairman, Board of Selectmen Rye Nuclear Intervention Committee
Town Hall c/o Rye Town Hall
South Hampton, New Hampshire 03827 10 Central Road
Rye, New Hampshire 03870
. .
Mr.-Angie Machiros, Chairman Jane Spector
Board of Selectmen Federal Energy Regulatory Comm.
for the. Town of Newbury 825 North Capitol Street, N.E.
25 High Road Room 8105
Newbury, Massachusetts 01950 Washington, D.C. 20426
Ms. Rosemary Cashman, Chairman Mr. R. Sweeney
Board of Selectmen New Hampshire Yankee Division
Town of Amesbury Public Service Company of
Town Hall New Hampshire
Amesbury, Massachusetts 01913 7910 Woodmont Avenue
Bethesda, Maryland 20814
Honorable Peter J. Matthews Mr. Donald E. Chick, Town Manager
Mayor, City of Newburyport Town of Exeter
Office of the Mayor 10 Front Street
City Hall Exeter, New Hampshire 03823
Newburyport, Massachusetts 01950
Mr. Warren Hall
Public Service Company of
New Hampshire
P. O. Box 300
Seabrook, New Hampshire 03874
Administrative Judge Administrative Judge
Alan S. Rosenthal, Chairmar Bary J. Edles
Atomic Safety and Licensing Appeal Atomic Safety and Licensing Appeal
Board Board
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission
Washington, D.C. 20555 Washington, D.C. 20555
.
p , - - - , - - . . . - . - . - ,. . . - , - - , - -- - - , - . - - - . ,..--- -,,,,,,--,,4 ,.
r-
. .
Administrative Judge- Administrative Judge
'Howard A. Wilber -Helen F. Hoyt, Chairman
Atomic. Safety and Licensing Appeal' Atomic-Safety and Licensing Appeal
Board Board
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission
Washington, D.C. 20555 Washington, D.C. 20555
Administrative Judge Administrative Judge
Emmeth A. Lusbke Jerry Harbour
Atomic Safety and Licensing Board Atomic Safety and Licensing Board
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission
Washington, D.C. 20555 Washington, D.C. 20555
Edwin J. Reis, Esq. H. Joseph Flynn, Esq.
Office of the Executive Legal Assistant General Counsel
Director Federal Emergency Management Agency
U.S. Nuclear Regulatory Commission 500 C. Street, S.W. '
Washington, D.C. 20555 Washington, D.C. 20472
Edward A. Thomas Carol S. Sneider, Esq.
Federal Emergency Management Agency Assistant Attorney General
442 J. W. McCormack (POCH) Office of the Attorr.ey General
Boston, Massachusetts 02109 One Ashburton Place,19th Floor
Boston, Massachusetts 02108
Paul McEachern, Esq. Richard A. Haaps, Esq
Shaines and McEachern Haaps and McNicholas
25 Maplewook Avenue 35 Pleasant Street
Portsmouth, New Hampshire 03801 Concord, New Hampshire 03301
. .
J. P. Nide u Allan Lampart
Board of Selectmen Civil Defense Director
10 Centra.1 Street Town of Brentwood
Rye, New Hampshire 03870 20 Franklin Street
Exeter, New Hampshire -03833
William Armstrong Sandra Gavutis, Chairman
Civil Defense Director Board of Selectmen
Town of Exeter RFD #1, Box 1154
10 Front Street -Kensington, New Hampshire 03827
Exeter, New Hampshire 03833
Anne Goodman, Chairman William S. Lord
Board of Selectmen Board of Selectmen
13-15 Newmarket Road Town Hall - Friend Street
Durham, New Hampshire 03824 Amesbury, Massachusetts 01913
Michael Santosuosso, Chairman Jerard A. Croteau, Constable
Board of Selectmen 82 Beach Road
South Hampton, New Hampshire 03827 P. O. Box 5501
Salisbury, Massachusetts 01950
Stanley W. Knowles, Chairman Judith H. Mitzner
Board of Selectmen Silverglate, Bernter, Baker, Fine,
P. O. Box 710 Good, and Mitzner
North Hampton, New Hampshire 03862 88 Broad Street
Boston, Massachusetts 02110
. .
Norman C. Katnar .
Bary W. Holmes, Esq.
Superintendent of Schools Holmes and Ells
. School. Administrative Unit No. 21 47 Winnacunnet Road
Aluani Drive Hampton, New Hampshire 03842
. Hampton, New Hampshire 03842
.
Jane Doughty George D. Bisbee, Esq.
Seacoast Anti-Pollution League Assistant Attorney General
5 Market Street Office of the Attorney General
Portsmouth, New Hampshire 03801 25 Capitol Street
Concord, New Hampshire 03301
s
d
i
)
i
. . _ . _ . _ . . _ _ . _ . _ _ . . . _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . _ _ . . _ _ . _ _ . _ _ _ . - . , . . _ . . . . . _ _ _ _ . _ _ . _ . _ _ . . _ . _ _ _ _ . _ - _ _ _ -