Forwards Safety Insp Rept 50-443/89-04 on 890327-31.No Violations Noted
ML20247L740
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/18/1989
From: Strosnider J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20247L747 List:
References
NUDOCS 8906020245
Download: ML20247L740 (2)


See also: IR 05000443/1989004

Text

_ _ __ _ _ _ _ _ - - - -

,

.. . .-

, -

.

MAY 18'1989

Docket No. 50-443

Public Service Company of New Hampshire

ATTN: Mr. Edward A. Brown, President

and Chief Executive Officer

New Hampshire Yankee Division

Post Office Box 300

Seabrook, New Hampshire 03874

Gentlemen:

Subject: Inspection No. 50-443/89-04

This letter refers to the routine safety inspection conducted by Messrs. C. Woodard

and A. Della Greca of this office on March 27-31, 1989 at the Seabrook Nuclear

Power Station. Messrs. Woodard and Della Greca discussed the results of the

inspection with Mr. J. Grillo of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel,'and observations by the inspectors.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Signed By:

Jack R. Str0 snider

Jack R. Strosnider, Chief

Engineering Branch

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report Number 50-443/89-04

8906020245 890518

PDR

G

ADOCK 05000443

PNu

I

0FFICIAL RECORD COPY IR SEABROOK 89-04 - 0001.0.0

05/18/89

r (

18 '.O}

- _ - - - _ -

! I

- . - _ - - ----_ - -__- ______ -_- . - _ .

. . . .

MAY 181989

Public Service. Company ' 2

of New Hampshire- '

cc w/ enc 1:

J. C. Duffett, President and Chief Executive Officer, PSNH

T. C. Feigenbaum, Vice President, Engineering, Licensing and Quality Programs, .

NHY-

J. M. Peschel, Regulatory Services Manager, NHY

L D. E. Moody, Station Manager, NHY

l - P. W. Agnes, Jr., Assistant Secretary of Public Safety, Commonwealth of- I

Massachusetts

, Peter Prescott, Quality Assurance, NRR

Public Document Room (PDR)

Local Public Document Roem (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

Commonwealth of Massachusetts

Seabrook Hearing Service List

bec w/ enc 1':

P.egion I Docket Room (with concurrences)

M. Perkins, Management Assistant,.DRMA (w/o encl)

D. Haverkamp,'Section Chief, DRP

D. Ruscitto, SRI - Seabrook (w/ concurrences) i

R. Bores, Technical Assistant, DRSS

V. Nerses, PM, NRR

K. Abraham, PA0 (20) SALP Reports and All Inspection Reports

J. Wiggins, DRP '

!

i

i

.i

l

Cf

RI:DRS RI:DRS RI:DRS

Della Greca/pmb/rw Woodard Anderson

end

5/ /89 5/// /89 5////89 ,

0FFICIAL RECORD COPY IR SEABROOK 89-04 - 0002.0.0

05/10/89