ML20062E41516 November 1990Forwards H Myers 901019 Request for Info Re Plant Welds for Appropriate Action
ML20217A25315 November 1990Requests Info Re Surety Bond & Status of Eua Power Interest in Surety Bond
ML20058E68729 October 1990Ack Receipt of in Response to NRC Announcing Intent to Perform Team Insp of Maint Program on 901203-14.Subj Insp Date Changed to 910128-0208 Due to Various Complications
ML20058D60624 October 1990Forwards Safety Insp Rept 50-443/90-17 on 900905-1014. Actions Taken on Previous Insp Findings Found to Be Adequate
ML20058A34617 October 1990Informs That Util Response to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-08,Item 2.2 'Vendor Interface for Safety-Related Components,' Acceptable
IR 05000443/199001817 October 1990Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/90-18
ML20058B80812 October 1990Informs That SW Kessinger Scheduled to Participate in NRC 901022 Requalification Exam
IR 05000443/19900152 October 1990Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/90-15
ML20059N8241 October 1990Informs of 901203-14 Maint Program Team Insp & Forwards NRC Temporary Instruction 2515/97,Rev 1
ML20059L88321 September 1990Forwards Safety Insp Rept 50-443/90-16 on 900730-0904.No Violations Noted
ML20059H0607 September 1990Discusses Unescorted Access to Licensee Facilities & fitness-for-duty Program,Per .Nrc Regulations Do Not Prohibit Licensee from Accepting Access Authorization Program of Another Licensee,Contractor or Vendor
ML20058P78516 August 1990Forwards Safety Insp Rept 50-443/90-15 on 900625-0729 & Notice of violation.Self-assessment Team Rept on Power Ascension Testing Demonstrated Ability to Be self-critical & Results Corresponded Well W/Nrc Assessments of Performance
ML20058N11210 August 1990Provides Comments on Util 900102 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. NRC Does Not Take Any Position on Acceptability of Util Station Gauge Methodology
ML20058M6186 August 1990Discusses Licensee Engineering Initiatives.Licensee Has Undertaken Positive Initiatives in Engineering Area, Including Design Basis Document Updates,Safety Sys Functional Insps & Other Engineering Program Improvements
ML20055G75916 July 1990Forwards Safety Insp Rept 50-443/90-13 on 900521-25.No Violations Noted.Weaknesses Noted
ML20055G14812 July 1990Forwards Safety Insp Rept 50-443/90-12 on 900514-0624
ML20055G17711 July 1990Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation Scheduled for 901015-26. Facility Mgt Responsible for Providing Adequate Space & Accomodations to Properly Develop & Conduct ExamsJob Performance Measure
ML20055G0475 July 1990Forwards Safeguards Insp Rept 50-443/90-14 on 900618-22.No Violations Observed.One Potential Weakness Identified Which Requires Attention to Maintain Effectiveness of Security Program
ML20055F5392 July 1990Forwards Special Power Ascension Team Insp Rept 50-443/90-81 on 900316-0502.Power Ascension Test Program Acceptable
ML20055D09428 June 1990Forwards Transcript of 900619 Public Meeting to Discuss Assessment of Power Ascension Test Program Performance Up to 50% Power Level
ML20055D07626 June 1990Advises of Completion of Review of Proposed Changes to Emergency Action Levels for Plant & Found Rev to Emergency Plan Acceptable W/Listed UnderstandingsEarthquake
ML20055C99925 June 1990Formalizes Requests Made in Conversation Between J Grillo & Ph Bissett on 900619 Re Planned Insp of Facility EOPs
ML20059M93613 June 1990Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl
ML20248G13826 September 1989Forwards SALP Rept 50-443/87-99 for Aug 1987 - June 1989Systematic Assessment of Licensee Performance
ML20247N71015 September 1989Requests Encl Listed Ref Matl for 891211 Evaluation of All Shift Operating Crews on Simulator Using NRC-developed Scenarios
ML20247K95113 September 1989Forwards Safety Inspt Rept 50-443/89-08 on 890701-0817.No Violations Noted
ML20246P6346 September 1989Forwards SER Re Generic Ltr 83-28,Item 4.5.3, Reactor Trip Sys Reliability for All Domestic Operating Reactors. Existing Intervals for on-line Functional Testing at Plant Consistent W/Achieving High Reactor Trip Sys Availability
ML20246N82129 August 1989Advises That Reactor & Senior Reactor Operator Exams Scheduled for Wk of 891114,per Telcon.Licensee Responsible for Providing Encl Ref Matl by 890901Shutdown Margin
Job Performance Measure
ML20246F31821 August 1989Forwards Safety Insp Rept 50-443/89-07 on 890619-23.No Violations Noted.Concerns Re Steam Leakage Problems Through Auxiliary Feed Pump Turbine Control Valves & Leakage Through Certain RCS Pressure Isolation Valves,Expressed
ML20246J36018 August 1989Clarifies NRC Position Re Definition of Extremity for Purpose of Setting Occupational Exposure Limits.Procedures Should Incorporate Applicable Dose Limits of 10CFR20
IR 05000443/198908217 August 1989Forwards Augmented Team Insp Rept 50-443/89-82 on 890628-30, Enforcement Conference Issues & Related Regulatory Requirements.W/O Insp ReptCondition Adverse to Quality
ML20246A92011 August 1989Forwards Team Safety Insp Rept 50-443/89-81 on 890612-23.No Violations or Unresolved Items Noted
ML20247Q74328 July 1989Forwards Safety Insp Rept 50-443/89-06 on 890527-0630. Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-443/89-03
ML20247N57328 July 1989Forwards Safety Evaluation Updating Status of Onsite & Offsite Emergency Preparedness for Plant.Onsite Emergency Preparedness Acceptable & Adequate for Full Power Operation. Offsite Emergency Preparedness Will Be Acceptable
ML20247L96118 July 1989Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose
IA-89-326, Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose18 July 1989Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose
ML20247A98014 July 1989Forwards Readiness Assessment Team Insp Rept 50-443/89-80 on 890527-0601.No Violations Noted
ML20245J21023 June 1989Confirmation of Action Ltr 89-11,confirming 890623 Telcon. Understands That Listed Actions Will Be Completed Prior to Startup in Response to 890622 Reactor Manual Trip Which Occurred During Natural Circulation Startup Test
ML20245F08921 June 1989Forwards Insp Rept 50-443/89-05 on 890424-0527.Violation Noted Re Storage Location for Svc Water Cooling Water Pump
ML20245A90515 June 1989Forwards SER Re Proposed Implementation of ATWS Rule (10CFR50.62) Requirements.Pending Final Resolution of Tech Spec Issue,Atws Design Proposed by Util in Compliance W/Rule.Design Mods Should Be Completed by Sept 1990
NUREG-0896, Forwards Sser 8 (NUREG-0896),addressing Issues Re 5% Low Power License.W/O Encl9 June 1989Forwards Sser 8 (NUREG-0896),addressing Issues Re 5% Low Power License.W/O Encl
ML20244D09526 May 1989Forwards License NPF-67,authorizing Operation of Facility to Power Levels Not Exceeding 5% of Rated Power & Limited to No More than 0.75 Effective Full Power Hours
ML20247R57325 May 1989Forwards Insp Rept 50-443/89-03 on 890228-0424 & Notice of Violation.Ack Util Intention to Initiate Appropriate Corrective Action as Described in .Notice of Violation Re Welding Program Deficiencies Not Issued
ML20247G33321 May 1989Forwards Summary of NRC Understanding of How Restrictions on Low Power Physics Testing Will Be Met.Approach Satisfactory
ML20247L74018 May 1989Forwards Safety Insp Rept 50-443/89-04 on 890327-31.No Violations Noted
ML20247L9415 May 1989Provides Guidelines for Review of Emergency Exercise Objectives & Scenario Packages Prior to Plant Partial Participation Emergency Exercise Scheduled for Wk of 890925, Including Schedule
CLI-88-10, Forwards Safety Evaluation Accepting Licensee Decommissioning Funding Assurance Plan.Plan Provides Necessary Assurance & Satisfies Requirements in Decision CLI-88-103 May 1989Forwards Safety Evaluation Accepting Licensee Decommissioning Funding Assurance Plan.Plan Provides Necessary Assurance & Satisfies Requirements in Decision CLI-88-10
ML20247B0913 May 1989Extends Invitation to Attend Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Agenda Encl
ML20246F3912 May 1989Requests Explanation Re Effect of Paragraph M.5 of Section 6.01 of Supplementary Decommissioning Trust Agreement Re Funds (Strips) to Be Provided for Supplementary Trusts
ML20245F58625 April 1989Comments on Supplemental Decommissioning Funding Financial Assurance Arrangements Presented at 890420 Meeting in Rockville,Md.Listed Info Should Be Included in Formal Response to Comments