ML20211N878

From kanterella
Jump to navigation Jump to search
Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams
ML20211N878
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/03/1999
From: Diprofio W
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AL-99-03, AR#99012192, NYN-99083, NUDOCS 9909130097
Download: ML20211N878 (3)


Text

i I a.

m ,.,,,i North North Atlantic Energy Service Corporation P.O. Box 300 Atlantic Seahreet,x u 03874 0

(603) 474-9521 The Northeast Utilities System September 3,1999 NYN-99083 Ref: NRC Administrative Letter 99-03 4 AR#99012192 United States Nuclear Regulatory Commission Attn.: Document Control Desk

)

Washington, DC 20555-0001 l

1 Seabrook Station 1 Response to Request for Information Regarding NRC Administrative Letter 99-03 On August 20,1999, the NRC issued Administrative Letter 99-03, " Preparation and Scheduling of Operator Licensing Examinations." This Administrative Letter requested information from licensees on their licensed operator examination schedule and estimated number of applicants to better help the NRC plan their resources in this area. Accordingly, Enclosed is the requested information.

Should your have any questions regarding this matter, please contact Mr. James M. Peschel,

, Regulatory Compliance Manager, at (603) 773-7194.

Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.

i j ,-

t' yy%) I db

/ c I

W A. DiPgr 'io' ation Director cc: II. J. Miller, NRC Region I Administrator 01 J. T. Harrison, NRC Project Manager, Project Directorate 1-2 R. K. Lorson, NRC Senior Resident Inspector

_ .0 2,0 9909130097 990903 PDR ADOCK 05000443 V PDR

i-b ENCLOSURE 1 TO NYN-99083 i

l l

i

(

l ij l

l l

t 1

h i

l l

l I

L

IL l Attachment 1 AL 99-03 l NFfp FORM'536 U.S MUCLEAR REGULATORY COMMISSION APPROVED BY OMB RO 3150-0131 EXPIRE.i (7 1999) 07/3t/2OO3 Estunated burden per response to comply with this voluntary informatio n OPERATOR LICENSING collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to pla ii EXAMINATION DATA budgets and resources for operator examinations- send comment!

regarding burden estimate to the Records Management Branch (T-6 E6) t

  • S Nuclear Regulatory Commission, Washington, DC 20555-0001 or bi intemet email to bjs1@nrc gov, and to the Desk Officer, Office cf information and Regulatory Affairs, NEOB-10202, (3150-0131). Office o Management and Dudget Washington, DC 20503. If a means used ti' impose an information collection does not display a current!y valid OMi' control number, the NRC may not conduct or sponsor, and a person is no ,

required to respond to. the information collection.

l FACILtTY NRC REGION I SEABROOK STATION 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE l PROPOSED NUMBER CY2000 CY2001 CY2002 CY2003 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINAT;ONS I O I 1 B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY2000 CY2001 CY2002 CY2003 NUMBER OF REACTOR OPERATORS 0 0 5 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 2 0 2 2 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE g 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 i PROPOSED DATES 3/06/2000 N/A 2/25/2002 11/17/2003 1

PRIMARY DATE N/A 3/06/2000 2/25/2002 11/17/2003 i ALTERNATE DATE N/A N/A 3/04/2002 12/01/2003 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2000 CY2001 PROPOSED NUMBER FIRST SECOND FIRST SECOND ESTIMATED NUMBER OF CANDIDATES 0 0 8 0 hRC FORM 536 (7-1999) PRINTED ON RECYCLED PAPER THIS FORM WAS DESIGNED USING INFORMS l

!