ML20198D134
| ML20198D134 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/16/1998 |
| From: | Modes M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T, Harpster T NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| Shared Package | |
| ML20198D136 | List: |
| References | |
| NUDOCS 9812230016 | |
| Download: ML20198D134 (3) | |
Text
.
i i
L e
i f
l December 16, 1998 l
l Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Seabrook Station -
North Atlantic Energy Service Corporation c/o Mr. Terry L. Harpster P.O. Box 300 Seabrook, NH 03874
SUBJECT:
Dear Mr. Feigenbaum:
Enclosed is a copy of a letter from Mr. Jeffrey A. Bean, Regional Director, FEMA Region I, transmitting a copy of the final exercise report for the October 20,1998, MS-1, out of sequence drill for Elliot Hospital in Manchester, New Hampshire, specific to Seabrook Nuclear Power Station. There was one Area Requiring Corrective Action (ARCA) identified during this drill. Please provide assistance to offsite officials to address and resolve the identified ARCA on a timely basis. If you have any questions concerning this enclosure, please contact me or Mr. William Maier at (610) 337-5136.
j l
Sincerely, ORIGINAL SIGNED BY:
Michael C. Modes, Chief Emergency Preparedness and Safeguards Branch Division of Reactor Safety Docket No. 50-443
Enclosure:
As stated GD\\
l l
l 9812230d16 981216 I
PDR ADOCK~05000443 F
PDR 1
l l -
t l'
L T. Feigenbaum 2
cc w/ encl:
B. D. Kenyon, President - Nuclear Group J. S. Streeter, Recovery Officer - Nuclear Oversight l
W. A. DiProfio, Station Director - Seabrook Station R. E. Hickok, Nuclear Training Manager - Seabrook Station D. E. Carriere, Director, Production Services L., M. Cuoco, Senior Nuclear Counsel W. Fogg, Director, New Hampshire Office of Emergency Management i.
R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency Management Agency i
F. W. Getman, Jr., Vice President and General Counsel-Great Bay Power Corporation l
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts l
Seacoast Anti-Pollution League D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engineer cc wio encl:
J. Bean, Regional Director, FEMA Region l l
D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass l
l l
1
+
T. Feigenbaum 3
Distribution w/ encl:
Region i Docket Room (with concurrences)-
L PUBLIC -
Nuclear Safety information Center (NSIC)
NRC Resident inspector C. Cowgill, DRP-R. Summers, DRP C. O'Daniell, DRP J. Wiggins, DRS,
L. Nicholson, DRS R. Bores, State Liaison Officer W. Maier, DRS C. Miskey, DRS (2 copies)
J. Harrison, PD l-3, NRR R. Correia, NRR (RPC)
D.- Screnci, PAO, ORA Inspection Program Branch, NRR (IPAS)
DOCDESK-D. Barss, NRR DOCUMENT NAME: G:\\EP&SB\\MAIER\\SEABMS1.LTR Ta receive a copy of this document, indcote in the box: 'C' = Copy without attachment /erciosure
'E' - Copy with attachment / enclosure "N'=
No copy OFFICE Rl/DRS lg Rl/DRS l
l l
I:
NAME WMaier. th MModes y j}
DATE 12/15/98.
12/l /98 OFFICIAL RECORD COPY
__ -