ML20212K792

From kanterella
Jump to navigation Jump to search
Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility
ML20212K792
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/30/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
References
NUDOCS 9910070051
Download: ML20212K792 (3)


Text

.

September 30, 1999 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Seabrook Station North Atlantic Energy Service Corporation clo Mr. James Peschel P.O. Box 300 Seabrook, NH 03874

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - SEABROOK

Dear Mr. Feigenbaum:

1 In a telephone conversation on September 22,1999, Mr. J. D' Antonio, Examiner / Inspector, and Mr. Tom Grew made arrangements for the NRC to inspect the licensed operator requalification program at the Seabrook facility. The inspection is planned for the week of November 15,1999, s which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by November 1,1999. Mr. Grew has been advised of this i request and provided with the name and address of the NRC lead inspector assigned to this inspection. l 1

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information coIIections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments on any  ;

aspect of this collection of information, including suggestions for reducing the burden, to the l Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Intemet electronic mail atBJS1SNRC. GOV: and to the  ;

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

l 9910o70051 990930 DR ADOCK o j 43 f h'9'I C

l 6;

Mr. Ted C. Feigenbaum . Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact J. D' Antonio at (610) 337-5085.

Sincerely, ORIGINAL SIGNED BY:

, Richard J. Conte, Chief .

Human Performance and Emergency Preparedness Branch Division of Reactor Safety l

Docket No. 50-443 cc: i B. D. Kenyon, President - Nuclear Group )

J. S. Streeter, Recovery Officer - Nuclear Oversight i L

W. A. DiProfio, Station Director - Seabrook Station l R. E. Hickok, Nuclear Training Manager - Seabrook Station D. E. Carriere, Director, Production Services -

l L. M. Cuoco, Esquire, Senior Nuclear Counsel i

W. Fogg, Director, New Hampshire Omce of Emergency Management D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire {

D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency )

Management Agency

{

F. W. Getman, Jr., Vice President and General Counsel- Great Bay Power Corporation R. Hallisey, Director, Dept of Public Health, Commonwealth of Massachusetts Seacoast Anti-Pollution League D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engineer D. Roy, Supervisor - Operator Training  ;

1 1

I

~

Mr. Ted C. Feigenbaum _ Distribution:

H. Miller, RA/J. Wiggins, DRA C. Anderson, DRP R. Summers, DRP R. Junod, DRP Region i Docket Room (with concurrences)

PUBLIC Nuclear Safety information Center (NSIC)

NRC Resident inspector W. Lanning, DRS B. Holian, DRS J. D' Antonio, DRS OL Facility File (V. Curley, DRS) j DRS File (2)

Distribution (VIA E-MAIL):

M. Tschiltz, RI EDO Coordinator  !

E. Adensam, PD l-3, NRR J. Harrison, PD l-3, NRR J. Clifford, NRR R. Correia, NRR (RPC)

D. Screnci, PAO, ORA Inspection Program Branch, NRR (IPAS)

DOCDESK L. Vick, H0HB, NRR l

DOCUMENT NAME: G:\HPEPB\DANTONIO\SEAB60DAYRPl.WPD Ta receive a copy of this document, indicate in the box: "C" = Co >y without attachtnent/ enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS , l Rl/DRS ,/ l l l l NAME JD' Antonio //k> RConte/7 i DATE 09/27/99 ' 4 //2/% 09/ # 9 09/ /99 09/ /99 09/ /99 OFFICIAL RECORD COPY r