ML20206B345
| ML20206B345 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 04/20/1999 |
| From: | Anderson C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| Shared Package | |
| ML20206B349 | List: |
| References | |
| 50-443-99-01, 50-443-99-1, NUDOCS 9904290215 | |
| Download: ML20206B345 (3) | |
See also: IR 05000443/1999001
Text
. . - _
.
.
.
4
!
.
April 20, 1999
Mr. T. C. Feigenbaum
Executive Vice President and Chief Nuclear Officer
Seabrook Station
North Atlantic Energy Service Corporation
c/o Mr. James M. Peschel
)
P. O. Box 300
Seabrook, NH 03874
SUBJECT:
NRC INSPECTION REPORT NO. 50-443/99-01
Dear Mr. Felgenbaum:
This refers to the inspection comr'sted on March Et,1999 at the Seabrook Nuclear Power
Station. The enclosed report presents the results of this inspection.
j
.
The plant was operated safely during the period. The operators performed routine activities
including surveillance testing well. Maintenance and outage planning activities were performed
well. Component engineering provided good support and analysis for several safety-related
'
component lubricating oilissues.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements o:: curred. These violations are being treated as Non-Cited Violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs included: (1) failure to
properly test the primary auxiliary building fans, and (2) Inadequate corrective action to prevent
recurrence of repeated primary auxiliary building for test failures. These NCVs are described in
the subject inspection report. If you contest the violation or severity level of these NCV(s) , you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with a copies to the Regional Administrator, Region I, and the
l
Director, Office of Cnforcernent, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001.
I
9904290215 990420
ADOCK 05000443
G
I
0FFICIAL RECORD COPY
IE:01
-
- .
.
Mr. Ted C. Feigenbaum
2
in accordance with 10 CFR 2.790 of the NRC " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room.
Sincerely,
Original Signed by:
Clifford Anderson, Chief
Projects Branch 5
Division of Reactor Projects
Docket No. 50-443
License No: NPF-86
Enclosure: NRC Inspection Report No. 50-443/99-01
cc w/enci:
B. D. Kenyon, President - Nuclear Group
J. S. Streeter, Recovery Officer - Nuclear Oversight
W. A. DiProfio, Station Director - Seabrook Station
R. E. Hickok, Nuclear Training Manager - Seabrook Station
D. E. Carriere, Director, Production Services
L M. Cuoco, Esquire, Senior Nuclear Counsel
W. Fogg, Director, New Hampshire Office of F.mergency Management
D. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass
R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire
' D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency
Management Agency
F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power Corporation
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
Seacoast Anti-Pollution League
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
S. Comley, Executive Director, We the People of the United States
W. Meinert, Nuclear Engineer
e
.
Mr. Ted C. Feigenbaum
3
Distribution w/ encl:
H. Miller, RA/J. Wiggins, DRA
C. Anderson, DRP
R. Summers, DRP
S. Barr, DRP
R. Junod, DRP
Region i Docket Room (with cor;currences)
PUBLIC
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
Distribution w/enci(VIA E-MAIL):
M. Tschiltz, OEDO
R. Correia, NRR (RPC)
D. Screnci, PAO, ORA
Inspection Program Branch, NRR (IPAS)
DOCDESK
i
4
,
i
f
DOCUMENT NAME: G:\\ BRANCH 5\\3-SB\\ SEA 9901.WPD
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure
"E" = Copy with
attachment / enclosure
"N" = No copy
OFFICE
Rl/DRP
.
l
Rl/DRP
NAME
RLorson CF A r
CAnderson(/4
'
DATE
04/7e/99
04/p/99
OFFICIAL RECORD COPY