Forwards Safety Insp Rept 50-443/90-13 on 900521-25.No Violations Noted.Weaknesses Noted
ML20055G759
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/16/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20055G760 List:
References
NUDOCS 9007240146
Download: ML20055G759 (2)


See also: IR 05000443/1990013

Text

e

,,

- % ;; c.

,

-

<

,.

.

. .

I

i

i.

JUL 161990

l

Docket No. 50-443

Public Service Company of New Hampshire

ATTN: Mr. Edward A. Brown, President

i'

and Chief Executive Officer

.

New Hampshire Yankee Division

f

Post Office Box.300

'

Seabrook New Hampshire 03874

Gentlemen:

Subject:

Inspection No. 50-443/90-13

This refers to the routine safety inspection conducted by Mr. P. Drysdale of

this office on May 21 - 25, 1990, at the Seabrook Nuclear Power Plant of

activities authorized by NRC License No. NPF-67 and to the discussions of our

findings held by Mr. Drysdale with Mr. D. Moody at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

?'

tion Report which is enclosed with this letter. Within these areas, the inspec-

tion consisted of selective examinations of maintenance and surveillance

programs and activities, procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed; however,

certain weaknesses are discussed in Sections 2.1.1, 2.4, and 4.2 of the

enclosed report that warrant additional management attention.

Specifically,

the insoectors noted a large number of outstanding Request for Engineering

Service (RES) documents that pertain to maintenance, inadequate post-mainten-

ance-system restoration, and an inadequate response to unresolved items related

to maintenance practices.

' No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

.

,

Sincerely,

<

Original Signed Br &

ROBERT M. GALLO

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report Number 50-443/90-13

OFFICIAL RECORD COPY

IR SB 90-13 - 0001.0.0

'

0 0 4:'D

06/18/90

-

gor

ADOCKoSoog4

\\(/,

900724o146 900716

C

l

f--

. ? .

o

r. ;

t

r

_

.

,

"

g- 4

l

Public Service Company of New Hampshire

2-

.

,

i

'

cc w/er.c1:

L. E, Maglathlin, Jr;, President and Chief Executive Officer, PSNH '

.

T. C.'Feigenbaum, Senior.Vice President and Chief Operating Officer, NHY -

,

J. M. Peschel, Regulatory Compliance NHY /

R. M._Kacich, Manager of Generation Facilities Licensing, NUSCD

i

J. F. 0peka, Executive Vice President, NU --

r

- G. Garfield, Esquire - -

.

D. E. Moody, Station Manager, NHY -

L

- T. Harpster,L Director of Licensing Services /

!

R. Hallisey, Director, Dept. of Public Health, Commonwealtl of Massachusetts "

S.. Woodhouse, Legiilative Assistant -

Public Document Room (PDR)

.

Local Public Document Room (LPDR)

.'

l

Nuclear Safety Information Center (NSIC)

i

E

- NRC Resident Inspector

l

' ' tate of New Hampshire, SLO

~l

i

(-

Commonwealth of Massachusetts,> SLO Designee /

Seabrook-Hearing Service List

bec w/ encl:

.

L;

Region I Docket Room (with concurrences)

_

-;

Management. Assistant, DRMA (w/o enc 1)

!

E

- R. Bellamy, DRSS

n

E. McCabe, DRP

4

F

. 'J . Johnson, DRP

.

._

t

.

- N Dudley, SRI - Seabrook-(w/ concurrences)

.

K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports

.i

-

.

-J. Caldwell, EDO-

\\I

V. Nerses, NRR.

'

+

P. Drysdale, DRS

i

C. Woodard, DRS

'

N._Blumberg,.DRS

R. Gallo, DRS

i

OL Facility File

d

>

.(.

DRS Files (3)_

.

,

>

l

i

l '. .

..

'RI:DRS

>

RI:DRS

Ga(,o

R

Drysdale/aj k

Blumberg

1

07/I/90'

07

/90

07/

0

0FFICIAL RECORD COPY

IR SB 90-13 - 0002.0.0

07/03/90