ML20246A920
| ML20246A920 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 08/11/1989 |
| From: | Boger B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Ellen Brown PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| Shared Package | |
| ML20246A923 | List: |
| References | |
| NUDOCS 8908230185 | |
| Download: ML20246A920 (2) | |
See also: IR 05000443/1989081
Text
,-
_ _ - _ _ .
__- _
,
..
, 4 '?
y
(
'
g .,
fi
AUG -1.1.1989
4f
'
'
,
'
- Docket No. 50-443 -
.
Public Service Company of New' Hampshire
ATTN: Mr. Edward A. Brown, President
and-Chief Executive Officer
New Hampshire Yankee' Division
-Post Office. Box 300
.Seabrook, New Hampshire 03874=
~
Gentlemen:
i
- Subjecti
Inspection No. 50-443/89-81
This letter refers to the team safety inspection -led by Mr. James M. Trapp of-
.
this office on June 12-23,.1989 at Seabrook Station, Unit No. 1, Seabrook,-
'New Hampshire,' of activities authorized by NRC License No. NPF-67. A discussion
of our-findings was held by Mr. Trapp with Mr. D. Moody of your staff at the
4
conclusion of the inspection.
- Areas examined during this inspection are described in_ the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of_ procedures and. representative. records,
interviews with-personnel,_and observations by the inspectors.
The inspectors found the Los Power _.Startup. Tests, with the exception of_.the
~
' Natural; Circulation Test, were conducted in conformance with license. and pro-
Lcedural requirements (see Inspection Report 50-443/89-82 for details and
~
concerns related to the Natural Circulation' Test). The inspectors found the
startup.testingzstaff to be knowledgeable and familiar with the content of the
startup' test procedures. ,The'startup staff provided detailed. instructions to
.the operating staff-describing plant configurations required for conducting the
'
r
startup tests. .The preliminary evaluation of test results showed acceptable
correlation between measured and predic;:d results.
Within the scope of this inspection,.no violations or unresolved items were
observed.
,
No reply to this inspection is required. Your cooperation with us in this
matter is appreciated.
Sincerely,
Dricinal Sicacd Eya
$bGalle
'
L
Bruce A. Boger, Acting Director
l
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report No. 50-443/89-81
0FFICIAL RECORD COPY
JIM 2 - 0001.0.0
8908230185 890811
08/10/89
ADOCK 05000443
Q
g.,g g
,
a__
_ _ _ -
- _ - _ _ _
_- _ -- __ _ _ _ _ _ -__-_ - _ - - - -_ _ _ _ _ -
. .
.
_
_ - _ - __ - _ - _ _ _ _ _ _ - -
D,
AUG l'1 1989
a
'
n
,-
_.
,
Public-Service Company
2
' ' -
-
-of:New Hampshire-
fccw/ enc 1:
J. C.-Duffett, President'and Chief Executive Officer, PSNH
T.- C. Feigenbaum, Senior Vice President, and Chief Operating Officer,-NHY
.J. M. Peschel, Operational Program Manager, NHY
' '
D. E. Moody,' Station Manager, NHY
P. W.' Agnes, 'Jr. , Assistant Secretary of Public Shfety,' Commonwealth of
-Public Document Room (PDR)
' Local Public Document' Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector-
State of New Hampshire
Commonwealth'of Massachusetts
Seabrook Hearing Service List
bec w/ enc 1:
.
.
Region I Docket Room.(with concurrences)
Management Assistant, DRMA (w/o enc 1)
D. Haverkamp, DRP
L. Doerflein, DRP
SRI - Seabrook-(w/ concurrences)
V. Nerses, NRR
K. Abraham, PA0 (20) SALP Reports and All Inspection Reports
J. Wiggins, DRP
J. Dyer,'EDO
.
E. McCabe, DRP
J. Johnson, DRP
.- . _ . - .
--
RI
RI
S
R:
)
RI
l
Trapp
Ea
[:r/t4LD
pWiggins
Durr
8/~7 /89
8/ $989
8/%/89
8/7/89
8 / ff
0FFICIAL RECORD COPY
J1M2 - 0002.0.0
l
08/03/89
l
4
___
l