ML20247N710

From kanterella
Jump to navigation Jump to search
Requests Encl Listed Ref Matl for 891211 Evaluation of All Shift Operating Crews on Simulator Using NRC-developed Scenarios
ML20247N710
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/15/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
NUDOCS 8909260281
Download: ML20247N710 (3)


Text

_ . - _ _ _ _ _ _ _ _ _ _ _ _

2-5 1,

. ;; a '

Q;, c if ' -

f

. Docket No. 50-443 SEP:151989

'Public Service Company.of New Hampshire ATTN: Mr. Edward A. Brown, President and Chief Executive Officer New Hampshire Yankee Division

-Post' Office Box 300 '

Seabrook, New Hampshire 03874 Gentlemen:

~

Subject:

NRC EVALUATION OF SEABROOK STATION, UNIT 1, OPERATOR PROFICIENCY In a conversation on ' September 7',1989, between Mr. Joseph Grillo, Unit 1 -

Operations, and Mr. Peter Eselgroth, . Chief, PWR Section, arrangements were made for an NRC evaluation of operator proficiency.

The NRC is planning to conduct the evaluation of all shift operating crews on

'the Seabrook Unit I simulator, using NRC-developed scenarios during.the week of December 11,1989.1The scenarios will cover various types of broad evolu-tion / transients and:will not be limited to the use of the E0Ps.

.In order for the NRC staff to. adequately develop scenarios for the evaluation, it will be necessary forsyou to furnish the reference material listed in Attach-ment I by October 11, 1989. Also, we will need one simulator instructor and7 one'; operations person to assist'in the v611dation of the simulator scenarios developed.by the NRC. The two individuals will be required'to sign a security agreement that they will not knowingly divulge the scenario content's to other facility personnel and not be involved in further training of the operators after validation of the scenario contents. Future communications will confirm the schedule and finalize our needs.

Your cooperation with us in this matter is appreciated. If you have any ques-tions concerning this matter, please contact Mr. Peter Eselgroth, of my staff, at 215-337-5211.

Sincerely, Original Signed BYI Robert M. Gallo, Chief I-Operations Branch Division of Reactor Safety N0f I (

8909260281 89o913

{DR ADOCK C5000443 l PDC L . .? = ____ _ - _ _ _

i 3

.. 'o Public Service Company of New Hampshire 2 i

cc:

J. C. Duffett, President and Chief Executive Officer, PSNH l

-T. C. Feigenbaum, Senior Vice President and Chief Operating Officer, NHY J. M. Peschel, Operational Programs Manager, NHY D. E. Moody, Station Manager, NHY T. Harpster, Director of Licensing Services J. Grillo, Operations Manager P. Richardson, Training Manager _

P. W. Agnes, Jr. , Assistant Secretary of Public Safety, Commonwealth of Massachusetts Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Hampshire Commonwealth of Massachusetts Seabrook Hearing Service List bec w/

Attachment:

Region I Docket Room (with concurrences)

E. McCabe, DRP J. Johnson, DRP SRI - Seabrook (w/ concurrences)

V. Nerses, NRR J. Dyer, EDO L. Briggs, DRS DRS Files (2) bec w/o

Attachment:

Management Assistant, DRMA DRS:RI/[ DRS:R f// I Briggs /d g pEselg[th wby rdrn Ga oIlolp 9 91 0FFICIAL RECORD COPY BRIGGS /SEABROOK LTR./9/19/89 -

0002.0.0 09/13/89 l

l

.I I

REFERENCE MATERIAL REQUIREMENTS FOR SEABROOK STATION, UNIT 1 OPERATOR ASSESSMENTS

1. Operator training material on Seabrook Unit 1 plant systems.
2. All integrated plant procedures (normal or general operating procedures).
3. All emergency procedures (emergency instructions, abnormal or special procedures), including bases, if applicable.
4. Conduct of operations administrative procedures.
5. All annunciator / alarm procedures.
6. Emergency plan implementing procedures.
7. Technical specifications.
8. System operating procedures.
9. Piping and instrumentation diagrams and electrical single-line diagrams.
10. Simulator malfunction book.

11.. List of all preprogrammed ititial conditions.

12. Copy of simulator scenarios used by the facility to train on the E0Ps.

1