. y*

y p 4. ,

. Docket No. 50-443 s Public Service Company of New Hampshire ATTN: Mr. Edward A. Brown, President and Chief Executive Officer New Hampshire Yankee Division c P.O. Box 300 Seabrook, New Hampshire 03874 Gentlemen:

Subject:

Inspection of the Emergency Operating Procedures This letter is to' formalize requests made in a conversation between Mr. J.

Grillo of your staff and Mr. P. H. Bissett on June 19, 1990, regarding a planned inspection of the Seabrock Emergency Operating Procedures (EOPs)'during the period of September 17 through September 26, 1990. It is requested that the plant-referenced simulator be made available for evaluation of the effectiveness of the E0Ps as part of the inspection. ' Enclosure 1 is a list of reference material that is requested to be provided to the NRC no later than August 17 1990. Enclosure 2 is a tentative schedule for the inspection

-period, including the required facility support.

- Thank you for your cooperation in this matter. If you have any questions regarding this request, please contact the undersigned at 215-337-5291 or the Inspection Team Leader, Mr. P. Bissett of our staff at 215-337-5266.

L Sincerely.

Original Signed By:

RNfb.MGWidPChief Operations Branch Division.of Reactor Safrcy

Enclosures:

As stated

.cc'w/ enc 1:.

L. E. Maglathlin, Jr., President and Chief Executive Officer, PSNH F

T. C. Feigenbaum, Senior Vice President and Chisf Operating Officer, NHY J. M. Peschel, Regulatory Complit.nce, NHY R. M. Kacich, Manager of Generation Facilities Licensing, NUSCO J.' F. Opeka, Ewcutive Vice President, NU G. Garfield, Esquire O. E. Moody, Station Manager, NHY T. Harpster, Director of Licensing Services l

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massathusetts '

S. Woodhouse, Legislative Assistant Public Document Room (PDR)

-non, OFFICIAL RECORD COPY BISSETT/90-DAY /6/20 - 0001.0.^ /

9007030060 900625 PDR 06/20/90 ./

ADOCK V.iOOO443 9 PDC J

Public Service C;. of New Harpshire 2 cc w/enci cont'd:

Local Public Document Room (LPDR)

Nuci n a Safety Information Center (NSIC)

NRC k<sident Insoector State of New Hampshire, SLO Commonwealth of Massachusetts, SLO Designee Seabrook Hearing Service List bec w/ enc 1:

Region 1 Docket Room (with concurrences)

Management Assistant, DRMA (w/o eac1)

R. Bellamy, DRSS E. McCabe. DRP J. Johnson, DRP N. Dudley, SRI - Seabrook (w/ concurrences)

J. Caldwell, EDO V. Nerses, NRR R. Gallo, DRS l P. Eselgroth, DRS P. Bissett, DRS J. Arildsen, NRR DRS Files (2) i i

I DRS:RI Bissett/ajk rath De,c,e0 De,2,e0 Oeg,0 0FFICIAL RECORD COPY BISSETT/90-DAY /6/20 - 0002.0.0 06/20/90

p '

4~'

s

d. '

. y ...

t ENCLOSURE I

~

REFERENCE MATERIAL REQUIREMENTS FOR E0P INSPECTION

1. Complete procedure index
2. Emergency Operating Procedures l'

3 .~ . Abnormal Operating Procedures

4. Owners' Group Emergency Response Guidelines (revision used for the

[b-: current E0Ps).

i

[ 5. Procedure Generation Package, including:

p a. Plant Specific Technical Guidelines.

b. Writer's Guide'
c. Verification and Validation Program
d. Training Plan for the E0Ps
6. Deviation document explaining differences between the Owners' Group ERGS and the plant specific E0Ps

'7. Simulator Malfunction' Book j 8.- Lesson plans and simulator scenarios used in the simulator for training.

on the E0Ps

9. Procedure Users Guide 3

} i

+

.y 1

l 1

1 l

i .

, . 4 ENCLOSURE 2  !

TENTATIVE SCHEDULE AND REQUIRED FACILITY SUPPORT -!

Ist Monday AM - travel-to the site-  :

in s PM - training and badging of inspectors i i

Ist Tuesday .

AM - entrance meeting, meet with facility to resolve initial findings, 1

.. start interviews of licensed operators  :

PM - continue inspection and interviews r (9 'Ist. Wednesday through 2nd Monday . _ .

Continue interviews and perform control room / plant walkdowns of' )

procedures.with facility licensed operators (4-5 every day) , =!

Mid-inspection

-One 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> time period in simulator for familiarization

-Two 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> time periods in simulator observing two different crews r of-licensed operators using the E0Ps 2nd Tuesday  ;

. . AM'- Team wrap-up and preparations for working pre-e'xit meeting l

'PM - Working pre-exit meeting with facility staff to . resolve findings and .  :

obt'ain~ commitments,.if possible

[- [

2nd Wednesday .

l Formal exit meeting with facility management  ?

]

NOTE: Above schedule subject to change, t L  !

n ,

i

< i

. . -. _ , ,, _ - , , .